Which Reports Do I Need

Which reports Class MA office to flats prior approval needs

7 min readBy PlanScope Editorial Team

A council can only refuse Class MA prior approval on the matters the Order lists. Evidence each one and the application is hard to refuse. Assert them and it is easy.

Class MA prior approval is not a mini planning application. The council can only refuse it on the matters the Order lists, and everything else, including whether the town needs more flats and whether the design is any good, is outside its remit. The matters are transport and site access, contamination, flooding, noise from commercial premises affecting the future residents, the loss of a ground-floor use in a conservation area, the effect of introducing housing into an area important for industry or storage, and, for taller buildings, fire safety. Add to those the condition requiring adequate natural light in every habitable room.

Evidence each one properly and the application is difficult to refuse. Assert them and it is straightforward to refuse.

The eligibility conditions before you reach the matters

Prior approval only becomes relevant once the building qualifies. Check these first, because a refusal on eligibility is a wasted fee and a wasted 56 days.

  • The building must have been in Class E use, and must have been in that use, for a continuous period of at least two years before the date of the application.
  • The building must not be listed, within the curtilage of a listed building, or a scheduled monument.
  • The site must not be occupied under an agricultural tenancy, and various other exclusions in the Order apply.
  • Article 4 directions remove Class MA in a growing number of town centres, so check the council's Article 4 register for the specific street.

The Order was amended with effect from 5 March 2024, removing the 1,500 square metre floorspace limit and the requirement that the building be vacant for three months before the application. Read the current consolidated text rather than an older summary, because the conditions have moved more than once since Class MA was introduced in 2021.

Development must be completed within three years of prior approval, which is tighter than the standard implementation period for a full permission.

Noise from commercial premises

This is the matter that produces the most refusals, and it is a peculiar one because it is assessed the other way round from an ordinary noise case. The question is not whether the new residents will disturb the neighbours. It is whether the existing commercial uses will disturb the new residents.

What the officer wants to see in a Noise Impact Assessment is straightforward.

  1. Identification of every commercial noise source within influencing distance: plant on adjoining roofs, a delivery yard, a bar, a takeaway extract fan, a gym, servicing to the rear.
  2. Measured sound levels at the proposed facades over a period covering the hours those sources operate, including night-time where relevant.
  3. An assessment of internal levels in habitable rooms against BS 8233:2014 guideline values, with the glazing and ventilation specification that achieves them.
  4. Consideration of whether the ventilation strategy still works with windows closed, since acoustic performance that depends on sealed windows needs mechanical ventilation to be credible.
  5. Where plant is the dominant source, a BS 4142:2014+A1:2019 assessment of that plant.

The trap is proposing mitigation that solves the noise and creates an overheating problem. Councils have become alert to sealed flats with no cooling strategy, and a scheme that relies on closed windows should show how summer temperatures are managed.

Councils expect a suitably qualified acoustician for this work, and professional review is strongly advised.

Contamination, flooding and transport

These three are usually lighter, but each has a way of going wrong.

Contamination is assessed in relation to the building. For a 1970s office block the honest answer is often that the risk is low, but the assessment still has to be made. A Phase 1 desk study reviewing historic maps, the site's industrial history and any made ground is the normal submission, with a Phase 2 intrusive investigation only where the desk study identifies a plausible pollutant linkage. This work must be prepared in accordance with BS 10175 by suitably qualified and experienced persons, and a Land Contamination Assessment drafted in advance is a starting point for that professional rather than a substitute.

Flooding is also assessed in relation to the building. Where the site sits in Flood Zone 2 or 3, submit a Flood Risk Assessment covering finished floor levels of the lowest residential units, safe access and egress, and a flood warning and evacuation plan. Ground-floor flats in Zone 3 are the difficult case, and relocating habitable accommodation to upper floors with commercial or plant at ground level is often the answer.

Transport is limited to transport and highways impacts, particularly ensuring safe site access. A short Transport Statement covering the access arrangement, refuse collection, cycle parking and any change in vehicle movements is normally proportionate. Note that the council cannot refuse because the scheme provides no car parking, since parking provision is not one of the listed matters, though safe access is.

Natural light and space standards

Every habitable room must have adequate natural light. This is the requirement that most often forces a redesign of a deep-plan office floorplate.

There is no numeric threshold in the Order, so councils apply judgement informed by daylight modelling. A daylight assessment reporting average daylight factor or the metrics in the current daylight standard, room by room, with the room use labelled, is the way to answer it. Rooms with no window at all will fail. Bedrooms served only by a light well need modelling rather than assertion.

The nationally described space standard applies to new dwellings created under Part 3, so floor areas, storage provision and bedroom dimensions have to meet it. Set out a schedule of accommodation showing the gross internal area of each unit against the standard for its bedroom and bedspace count, and flag any shortfall openly rather than leaving it to be discovered.

An illustrative submission pack for eight flats

Illustrative example. A three-storey 1970s office building in a town centre outside a conservation area, no Article 4 direction, Flood Zone 1, with a nightclub two doors away and a small delivery yard to the rear, converting to eight flats.

  • Prior approval application form under Class MA, with the fee calculated per dwelling.
  • Existing and proposed floor plans and elevations, and a schedule of accommodation against the space standard.
  • Evidence of two years of Class E use: business rates records, leases, filed accounts.
  • Noise assessment covering the nightclub, the delivery yard and rooftop plant, with the glazing and ventilation specification.
  • Daylight assessment reporting each habitable room.
  • Phase 1 contamination desk study.
  • Transport statement covering access, refuse and cycle storage.
  • A short covering statement addressing each prior approval matter in turn, under its own heading.

That last item is worth the hour it takes. Officers determining prior approvals work to a 56-day deadline and appreciate a document structured to the matters they must consider.

When a full application beats prior approval

Prior approval is faster and narrower. That is not always an advantage.

Consider a full application where the scheme needs external alterations beyond what Class MA permits, since the class covers the change of use and limited associated building operations only. Consider it where the building is listed or in a conservation area and the ground-floor loss is contentious. Consider it where the unit mix or the size of the units would fail the space standard, because a full application allows a design conversation rather than a binary refusal.

And consider it where you want to increase the floorspace, add storeys or reconfigure the envelope, since those go beyond the class entirely and would need separate consents anyway.

Where the building is straightforward, in Class E use for years, in a decent location, with daylight on three elevations, prior approval is the better route and the 56-day period is worth having.

Enter your postcode on PlanScope to see which reports a conversion site is likely to need. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval, and for specialist technical reports qualified professional input may be required. This is general guidance rather than legal advice.

Frequently asked questions

What can a council assess under Class MA?

Transport and highways impacts, particularly safe site access, contamination risks, flooding risks, the impact of noise from commercial premises on the intended occupiers, the loss of a ground-floor use in a conservation area, the effect of introducing housing into an area important for industry or storage, and fire safety for taller buildings. Adequate natural light in all habitable rooms is also required.

Does the building still need to be vacant for three months?

The Order was amended with effect from 5 March 2024, removing the three-month vacancy requirement and the 1,500 square metre floorspace limit. The requirement for at least two continuous years of Class E use before the application remains. Read the current consolidated text, because the conditions have changed more than once since 2021.

How is noise assessed under Class MA?

The other way round from a normal case. The question is whether existing commercial uses will disturb the future residents. Identify every source within influencing distance, measure levels at the proposed facades over the relevant hours, and assess internal levels in habitable rooms against BS 8233 guideline values with the glazing and ventilation specification that achieves them.

Can the council refuse because there is no car parking?

No. Parking provision is not one of the listed prior approval matters, so a council cannot refuse on that basis alone. Transport and highways impacts, particularly ensuring safe site access, are within scope, so access arrangements, refuse collection and servicing do need to be addressed properly in a short transport statement.

What does adequate natural light mean in practice?

The Order sets no numeric threshold, so councils apply judgement informed by daylight modelling. Submit a room-by-room daylight assessment with each room's use labelled. Rooms with no window will fail, and bedrooms lit only by a light well need modelling rather than assertion. This is what most often forces a redesign of a deep office floorplate.

Sources and further reading

class maprior approvaloffice to residentialpermitted developmentconversion

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Which Reports Do I Need

View all →
Which Reports Do I Need7 min read

Reports for a rooftop pool on a flat conversion

A rooftop pool on a converted block turns on three pieces of evidence: the weight of water on the existing structure, the noise of wet plant, and what the enclosure does to the roofline.

Read article →
Which Reports Do I Need7 min read

Reports for a sand and gravel extension of six hectares

A six hectare gravel extension is decided by the mineral planning authority, needs an EIA screening opinion, and turns on hydrogeology and restoration rather than on blasting.

Read article →
Which Reports Do I Need6 min read

Reports for a traveller site with four pitches

A four pitch traveller site is a minor application with a major policy test. Need evidence, pitch separation and flood vulnerability decide most of these cases.

Read article →
Which Reports Do I Need7 min read

Reports for a micro hydro scheme on a weir

Micro hydro at a weir needs planning permission plus abstraction, impoundment and flood risk permits. The fish pass is often the costliest item, and it has to be settled before the drawings.

Read article →
Which Reports Do I Need7 min read

Reports for a student accommodation scheme of 200 beds

A 200 bed student scheme is a major application with two documents that have no equivalent on a standard residential pack: the institutional need case and the student management plan.

Read article →
Which Reports Do I Need7 min read

Reports needed for a church hall replacement

Rebuilding a church hall means answering three questions at once: the community facility replacement test, the setting of the adjoining listed church, and what lies under a churchyard.

Read article →