Commercial Occupiers

A projecting or hanging sign on a commercial frontage

7 min readBy PlanScope Editorial Team

A hanging sign can need advertisement consent, a highway licence and listed building consent at once. The deemed consent conditions on height, projection and illumination decide which.

A projecting sign on a shop or pub frontage usually needs advertisement consent unless it fits one of the deemed consent classes in Schedule 3 to the Town and Country Planning (Control of Advertisements) (England) Regulations 2007. The classes that cover signs on business premises come with conditions on height, projection and illumination, and a hanging sign that oversails the footway will also need the highway authority's separate consent.

Advertisement control is its own consent regime. It runs alongside planning permission rather than inside it, and a sign can need advertisement consent, listed building consent and a highway licence at the same time without needing planning permission at all.

Schedule 3 sets out numbered classes of advertisement that may be displayed without an express application, each subject to conditions. For a commercial frontage the relevant ones are the classes covering advertisements on business premises, split between illuminated and non-illuminated displays, and the class covering advertisements on the forecourt of business premises.

The conditions that matter for a projecting sign are the height above ground level, the projection from the face of the building, and whether the sign is illuminated. For non-illuminated signs on business premises the conditions include a maximum height of 4.6 metres above ground level and a limit of 1 metre on projection from the building face. There is also a standard condition running through the regulations that no advertisement may be sited where it would obscure or hinder the reading of a road traffic sign, a railway signal or an aid to navigation.

Read the conditions attached to the class you are relying on rather than a summary of them, because the figures differ between the illuminated and non-illuminated classes and the regulations have been amended.

Deemed consent also narrows by location. In a conservation area, a National Park, a National Landscape and the Broads, and in an area of special control of advertisements designated by the authority, several classes are unavailable or carry tighter limits, and illuminated signs are the first to fall outside.

Projection, clearance and the footway

Three measurements decide whether a hanging sign works.

  • Projection from the face of the building, measured to the outer face of the sign including its bracket.
  • Height of the lowest point above the footway, which the highway authority will set to keep pedestrians clear of the sign and its fixings.
  • Distance from the kerb line, because a sign that oversails a carriageway rather than a footway is treated differently.

The highway consent is the one that catches people out. Placing a sign, bracket or beam over a highway engages the Highways Act 1980, and most authorities operate a licensing process for projecting signs under it, commonly citing section 178. Some use section 177 where the structure is more substantial. Ask the highway authority which route it operates and what clearance it requires, because the figure is a local standard rather than a national one and it is applied without much flexibility.

An unlicensed sign over the highway can be required to be removed regardless of whether advertisement consent exists. That is a separate liability from planning enforcement.

Illumination and what it triggers

Internal illumination, halo lighting, trough lighting and any external spotlight all turn a sign into an illuminated advertisement, which moves it into a different class with tighter conditions and removes deemed consent in several designated areas.

Where express consent is needed, the authority will consider amenity and public safety, which are the only two grounds the regulations allow it to take into account. In practice that means the character of the street and whether the light would distract drivers or spill into residential windows above the shop.

Sign type Usual consent position What the authority looks at
Non-illuminated hanging sign within the class conditions Deemed consent, plus highway licence if it oversails Nothing, unless a condition is breached
Same sign in a conservation area Often express consent Design, materials, scale, cumulative signage
Internally illuminated box sign Express consent likely Luminance, hours, spill to flats above
Externally lit traditional sign Express consent likely in sensitive areas Fitting design, upward spill, glare
Sign on a listed building Express consent plus listed building consent Fixings, harm to fabric and character

For anything beyond a modest lamp, the authority may want a luminance figure and the operating hours. A short Lighting Assessment prepared against Institution of Lighting Professionals guidance on obtrusive light is the usual way to provide that, and it answers the question before an environmental health officer raises it.

Conservation areas and listed buildings

In a conservation area the authority is required to pay special attention to preserving or enhancing character and appearance under section 72 of the Planning (Listed Buildings and Conservation Areas) Act 1990. Traditional hanging signs often do well here, because a painted timber sign on a wrought iron bracket is frequently what the area's character supports, while an illuminated acrylic panel is not.

A listed building is a different matter. Fixing a sign into historic fabric is likely to need listed building consent under section 7 of the 1990 Act, judged against the duty in section 16 to have special regard to preserving the building and its features of special interest. Consent turns on the fixing detail as much as the design: a bracket bolted through ashlar is treated differently from one set into an existing mortar joint.

Where listed building consent is needed, the application should explain the significance of the building and the effect of the proposal, which is the function of a Heritage Statement. Historic England's advice on statements of heritage significance sets out what that document has to establish.

Making the application

Advertisement consent is applied for on the standard advertisement consent form, with a fixed fee set in the fees regulations and indexed, so check the current fee schedule before paying. Consent lasts for five years unless a shorter period is imposed.

What to submit:

  1. A location plan and a frontage elevation showing the sign in position, dimensioned, with the ground level and footway marked.
  2. A detail drawing of the sign and its bracket, with materials and colour finishes named.
  3. The illumination details: type, luminance, and the hours it will operate.
  4. A photograph of the existing frontage and of the adjoining frontages, so the authority can judge cumulative effect.
  5. For a listed building, a separate listed building consent application with the fixing detail and the heritage justification.

An illustrative example. A micro bakery taking a unit in a conservation area high street wants a painted timber hanging sign, 600 millimetres square, projecting 850 millimetres on a wrought iron bracket, with the lowest point 2.6 metres above the footway and no illumination. The projection sits within the 1 metre limit and the height is below 4.6 metres, so the deemed consent class may be available, but the conservation area designation has to be checked against the Schedule 3 restrictions. The highway licence for the oversail is needed either way. If the owner later adds a small downlighter, the sign becomes illuminated and the position changes. The signage question often arrives alongside a change of use, as in our notes on converting a pub to a convenience store and on a micro bakery taking a retail unit.

Displaying an advertisement without consent is an offence under the regulations, and the authority can also serve a discontinuance notice on a sign that has deemed consent where it causes substantial injury to amenity. Neither outcome is expensive to avoid: a pre-application enquiry to the conservation officer and a call to the highway authority will usually settle the design in a week.

Start with the two measurements, projection and clearance, before the signwriter quotes. Everything else follows from those.

If you want to see which supporting documents a frontage proposal in a sensitive location is likely to need, enter your postcode on PlanScope and answer the guided questions.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Do I need consent for a hanging sign on my shop?

Often not, if the sign fits a deemed consent class in Schedule 3 to the Control of Advertisements Regulations 2007 and meets its conditions on height, projection and illumination. Deemed consent is narrowed in conservation areas, National Parks, National Landscapes, the Broads and areas of special control. A sign oversailing the footway still needs the highway authority's licence.

How far can a projecting sign stick out?

For non-illuminated advertisements on business premises the conditions include a limit of 1 metre of projection from the face of the building and a maximum height of 4.6 metres above ground level. Measure to the outer face of the sign including the bracket, and read the conditions for the class you rely on, because illuminated classes differ.

Does illuminating a sign change the position?

Yes. Internal illumination, halo and trough lighting and any external spotlight make it an illuminated advertisement, which falls under a different class with tighter conditions and loses deemed consent in several designated areas. Where express consent is needed the authority can consider only amenity and public safety, so luminance and operating hours become the issues.

Do I need listed building consent for a sign?

Usually, where the sign is fixed into the fabric of a listed building, under section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990. The authority must have special regard to preserving the building and its features of special interest, and the fixing detail matters as much as the design. Apply for both consents together.

How long does advertisement consent last?

Express advertisement consent normally runs for five years unless a shorter period is imposed by condition. The application uses the standard advertisement consent form and a fixed fee set in the fees regulations, which is indexed, so check the current schedule. Displaying an advertisement without the required consent is an offence under the regulations.

Sources and further reading

advertisement consentshopfronthanging signconservation arealisted buildinghighways licence

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Commercial Occupiers

View all →
Commercial Occupiers7 min read

Dessert shop planning permission and the waste stream

A cold dessert or bubble tea shop is within Class E, so moving into a former shop needs no permission. Hot food, hours, queueing and waste are the real issues.

Read article →
Commercial Occupiers7 min read

Church hall letting space to a commercial nursery

Whether a commercial nursery in a church hall needs permission turns on the planning unit. Exclusive occupation, physical alteration and intensity are what decide it.

Read article →
Commercial Occupiers7 min read

A microbrewery's effluent and the undertaker's consent

Brewing effluent is far stronger than domestic sewage. The sewerage undertaker, not the council, decides whether it can go down the drain, and on what terms.

Read article →
Commercial Occupiers6 min read

A pet crematorium and the environmental permit

Animal cremation sits outside the use classes, needs an environmental permit as well as planning permission, and is normally decided on stack height, odour and the visitor element.

Read article →
Commercial Occupiers6 min read

A seasonal food kiosk on private land: the planning rules

Part 4 of the GPDO allows temporary use of land for 28 days a year, including a moveable kiosk. The curtilage exclusion, the day count across the planning unit and any hardstanding or services decide whether you need to apply.

Read article →
Commercial Occupiers6 min read

Reopening a nightclub after years of closure

A sui generis nightclub use does not lapse through non-use alone, but it can be abandoned. Physical condition, length of closure, intervening use and the owner's intentions decide it, and a certificate of lawfulness settles it.

Read article →