Converting a pub to a convenience store
Since 2017 there has been no permitted development route out of a pub. The application has to answer the loss of the pub before it answers anything else.
A pub to shop change of use always needs planning permission. The permitted development rights that once allowed a drinking establishment to become a shop were removed in May 2017, and the 2020 changes to the Use Classes Order left pubs and drinking establishments as a sui generis use outside Class E altogether. There is no prior approval route and no 56 day shortcut.
That means the application is really two applications in one. A case that the loss of the pub is acceptable, and a case that a convenience store works on this site. Most refusals turn on the first.
The use class position
A convenience store selling food and household goods sits in Class E(a), retail sale of goods other than hot food. A pub sits outside the classes as a sui generis use.
Because movement into Class E from a sui generis use is not covered by any permitted development right, a full application is required for the change of use. Demolition of a pub also needs permission, which is a separate point worth knowing when a scheme involves clearing the site.
If the store includes a hot food counter for consumption off the premises, check that element carefully. A substantial hot food takeaway operation is itself a sui generis use, and a mixed proposal has to be described accurately in the application rather than presented as a shop with an incidental counter.
Answering the loss of the pub
National policy asks decision makers to guard against the unnecessary loss of valued facilities and services, with public houses named among them. Most local plans then carry a policy with explicit tests, and the usual sequence requires evidence that the pub is no longer viable, that it has been marketed as a pub for a stated period on reasonable terms, and that the community's needs are met by other facilities nearby.
So build the evidence base around the policy wording:
- trading accounts for a defined period, usually three years, with the trend explained
- a marketing exercise as a going concern through an agent experienced in licensed premises, for the period the policy specifies, with dated particulars and portal listings
- an enquiry log recording every approach, the terms discussed and why it did not proceed
- a note on alternative provision, listing other pubs within a stated walking distance with their opening hours
- evidence of any attempts at reconfiguration, such as adding food, letting rooms or a function space
The two failures that recur are marketing at a price based on the alternative use value rather than the pub's trading value, which an officer will spot by comparing the asking price with the accounts, and a marketing period that paused while the application was prepared.
Assets of community value and community interest
Check the council's register before doing anything else. A pub listed as an asset of community value under the Localism Act 2011 triggers a moratorium on disposal so that community groups have time to prepare a bid, and the listing is also a material consideration in the planning decision.
A community group that has registered an interest will usually object, and the objection will be organised. Engaging with it early is more productive than meeting it at committee. Where a community bid has been made and failed on price or funding, say so with dates, because that history answers the question the officer will otherwise have to ask.
And if the building is listed or sits in a conservation area, the shopfront, signage and any external plant become heritage matters, with listed building consent needed for a listed pub. Internal alterations to a listed building are caught even where nothing changes outside.
Servicing and deliveries
This is where the retail case is won or lost. A pub takes two or three deliveries a week. A convenience store takes daily deliveries, often from a rigid vehicle of 10 metres or more, sometimes before 7am.
The Transport Statement should show the delivery vehicle on a swept path drawing entering, standing and leaving the site without reversing onto the carriageway, the standing position clear of the access and of parking, the delivery frequency and the proposed delivery hours, and the arrangement for waste and recycling collection. Where the pub car park becomes customer parking, show the layout, the bay dimensions and the turning space, and deal with the pedestrian route from the parking to the door.
A site where the only servicing option is a stop on a classified road is a difficult application, and the highway authority's view will usually be decisive.
Noise from plant and from deliveries
Refrigeration is the issue residents raise after opening, and the plant for a convenience store runs continuously.
A Noise Impact Assessment under BS 4142:2014+A1:2019 should cover the condenser units and their location, any air conditioning, the delivery activity including cages on hard surfaces and refrigerated vehicle engines, and the use of the car park late in the evening. Mitigation is practical: locate plant away from the nearest dwelling, use an acoustic enclosure or screen, specify low noise units with the manufacturer's data attached, set the delivery hours, and specify the surface the cages run across.
Where a flat sits above the unit, structure-borne noise and vibration from compressors needs isolation at installation. Retrofitting after a complaint is far harder.
| Issue | Document that answers it |
|---|---|
| Loss of the pub | Marketing, accounts and alternative provision evidence |
| Servicing | Transport statement with swept paths and delivery hours |
| Plant noise | Noise assessment with manufacturer sound data |
| Hot food element | Extraction and odour details if provided |
| Shopfront in a sensitive location | Heritage justification and detailed elevations |
Retail tests and whether they apply
A small convenience store in a local centre or an established parade generally raises no retail policy issue, and the sequential test applies to main town centre uses proposed in out of centre locations rather than to every shop.
Where the site is in fact out of centre, a sequential approach is needed and, above the floorspace threshold in the adopted plan or the national default where none is set, an impact assessment. For most pub conversions the floorspace is well below any threshold, so a Retail Impact Assessment is not required and a short paragraph explaining why is enough. Our note on garden centre outdoor sales and the retail tests covers how those thresholds are applied where the floorspace is larger.
Local plans sometimes protect the retail function of a parade in the opposite direction, restricting the proportion of non-retail uses, and a conversion to a shop usually helps rather than hinders there.
Licensing, hours and the conditions to expect
Alcohol sales need a premises licence under the Licensing Act 2003, and that is a separate application to the licensing authority with its own tests and its own objectors. The planning permission does not grant it and the licence does not grant planning permission, a point worth explaining to a client who assumes the pub's existing licence transfers to the new operation unchanged.
On the planning side, expect conditions on opening hours, delivery and servicing hours, plant noise limited to a stated level at the nearest noise sensitive facade, details of external plant and its acoustic treatment, a servicing management plan, cycle parking, and details of the shopfront and signage where the setting warrants it.
The delivery hours condition is the one to negotiate properly. A store that needs a 6am delivery and holds a permission allowing deliveries from 8am has a problem on day one, and varying the condition means a section 73 application and a fresh round of objections from the neighbours who asked for it.
You can see the documents a commercial change of use is likely to need on the report index.
This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.
PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
Can I change a pub to a shop under permitted development?
No. The permitted development rights allowing a drinking establishment to become a shop were removed in May 2017, and since the 2020 changes pubs are a sui generis use outside Class E. A full planning application is needed for the change of use, and demolition of a pub also requires permission.
What marketing evidence will the council want?
Marketing of the premises as a going concern pub, through an agent experienced in licensed property, for the period specified in the local plan policy, at a price reflecting the pub's trading value rather than its value for an alternative use. Supply dated particulars, portal listings and an enquiry log with reasons each approach failed.
Does an asset of community value listing stop the conversion?
It does not prevent permission, and it has two effects. A listing under the Localism Act 2011 triggers a moratorium on disposal so community groups can prepare a bid, and the listing is a material consideration in the planning decision. Check the council's register early, because an organised objection usually follows.
Will deliveries be a problem?
Often, because a convenience store takes daily deliveries where a pub took two or three a week. Show the delivery vehicle on a swept path drawing entering, standing and leaving without reversing onto the carriageway, with the standing position clear of the access. Where the only option is stopping on a classified road, the highway authority's view is usually decisive.
Does the pub's alcohol licence carry over?
Licensing and planning are separate regimes. Alcohol sales for consumption off the premises need a premises licence under the Licensing Act 2003, applied for from the licensing authority with its own tests and objectors. Planning permission does not grant the licence, and the existing licence does not authorise the change of use.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.