Commercial Occupiers

Converting an office to a co-working club

7 min readBy PlanScope Editorial Team

Desk rental sits in Class E(g)(i) and needs no application. The bar, the events programme and the membership model are what decide whether you are in sui generis territory.

A co-working space in an existing office usually needs no planning permission at all, because desk rental is office use and sits in Class E(g)(i) alongside conventional offices. The permission question arrives with the club part: a licensed bar open into the evening, ticketed events, a restaurant open to the public, or a membership model that is really a private club with desks attached. Those elements can take the use out of Class E and into sui generis, and that changes everything about what you can do next.

Work out which side of the line your business model sits on before the fit-out, not after an enforcement complaint.

Why most co-working stays within Class E

The Town and Country Planning (Use Classes) Order 1987, as amended in 2020, puts offices in Class E(g)(i): use as an office other than a use within Class E(c). Hot desks, private offices, meeting rooms, phone booths and a staffed reception are all office use, however the floorspace is sold.

Class E brings a useful freedom. Movement between the sub-uses of Class E is not development, so an E(g)(i) office can add a café for members and staff under E(b), a gym under E(d), or a clinic room under E(e), without an application. Internal works that do not materially affect the external appearance also fall outside development control under section 55 of the Town and Country Planning Act 1990.

Two qualifications. A condition on an earlier permission may restrict the use of the building regardless of the class, so check the planning history. And the building may have conditions limiting hours or requiring a specific parking provision that your operating model breaks.

Where a members club crosses into sui generis

The 2020 amendments took drinking establishments out of the use class system, so a pub or bar is now sui generis, as is a drinking establishment with expanded food provision and a hot food takeaway. A private members club with a bar as a substantial part of its offer is a long way from Class E office use.

The test is the character of the use as a matter of fact and degree, judged on the whole picture: what proportion of floorspace, what proportion of turnover, what hours, who can come in, and what the premises look and sound like from outside on a Thursday evening.

Model Likely position
Desks, meeting rooms, member-only café closing at 6pm Within Class E, no application
Desks plus a bar serving members, open to 11pm, events twice a week Mixed use, with a sui generis element
Desks by day, ticketed public events and bar by night Mixed use or sui generis, application needed
Members club with desks as a minor facility Sui generis

The consequence of landing in sui generis is larger than the application itself. A sui generis use loses the internal flexibility of Class E, so every later change needs permission. It also forfeits the Class MA prior approval route to residential, which requires the building to have been in Class E use for at least two continuous years and vacant for at least three months. For a landlord holding the building as a long term asset, that is a material loss of optionality.

Food, drink and events as ancillary uses

Ancillary use is a question of subordination, not of labelling. A café inside a co-working building that serves members and their guests, during working hours, at a scale matched to the occupancy, is ancillary to the office use and needs no separate consent.

It stops being ancillary when it acquires its own trade. Street frontage signage, a separate entrance, opening hours independent of the workspace, delivery platforms and a public menu are the markers an enforcement officer looks for. The same analysis applies to event space, and the point at which an ancillary room becomes a separate planning unit is covered in our note on turning a function room into a separate unit.

Cooking introduces a second set of issues regardless of use class. Extraction, odour control and the external flue route all need resolving, and most authorities will want a Ventilation/Extraction Statement where commercial cooking is proposed in a building that did not previously have it. On a city centre building with residential above or behind, the flue termination point is often the hardest physical problem in the whole scheme.

Alcohol is a licensing matter under the Licensing Act 2003, decided by the licensing authority on separate grounds. A premises licence does not grant planning permission and planning permission does not grant a licence. Apply for both, and expect the licensing representations to reach the planning file. Off-sales raise their own planning questions, as our note on off-sales from a brewery or bottle shop explains.

Hours, access and security

Twenty-four hour access is the single most common condition problem for co-working operators. An office building permitted with no hours restriction may still have an access or servicing condition that assumes a nine to six pattern, and a condition restricting hours of opening is routine where residential neighbours are close.

Say what you actually need in the application. A condition drawn to allow 7am to 8pm is hard to vary later, and an application to vary it under section 73 is a fresh planning decision with fresh publicity.

Three operational points worth describing:

  • Staffed hours against unstaffed access, and how out of hours entry is controlled.
  • Servicing and deliveries, including the time of the first delivery and where the vehicle stands.
  • Waste storage and collection, which for a building with food and drink output is larger than the previous office use generated.

Cycle parking and end-of-trip facilities

Cycle parking standards are set locally, and in London by Policy T5 of the London Plan 2021 with the standards in its tables. Co-working buildings attract higher cycling mode shares than conventional single-tenant offices, so the long-stay provision in the existing building is frequently inadequate.

End-of-trip facilities, meaning showers, lockers and changing space, are expected on larger schemes and are an easy thing to offer. Where the change of use needs permission, include them in the proposal rather than waiting to be asked. Where it does not, they are still worth providing because the condition is otherwise imposed on the next application you make.

Car parking usually goes the other way. A co-working occupancy per square metre is higher than a traditional office, so an existing parking allocation looks thin, and most urban authorities will resist adding spaces. A Transport Statement setting out the trip pattern and the mode share is the right place to make that argument.

Noise from evening events

Where events are proposed, the acoustic case is what decides the hours condition. Two different assessments are involved and applicants often supply only one.

Plant and building services noise is assessed under BS 4142:2014+A1:2019 against a measured background level. Entertainment noise, meaning music and amplified speech, needs separate consideration of breakout through the facade and through party walls, plus patron noise outside the entrance at closing time.

A Noise Impact Assessment with measured background levels taken at the proposed event times, rather than during a weekday afternoon, is the version that answers the question. Environmental health officers check the measurement period first.

Offer a management plan with the application: a dispersal policy, a limit on external areas after a stated time, a noise limiter set to an agreed level, and a named responsible person.

How to describe the use accurately

The description of development on the decision notice defines what you are permitted to do, so draft it with care and do not let it be shortened for you.

An honest description of a mixed use states the components and their relationship. Something in the form of "use as a shared workspace (Class E(g)(i)) with ancillary café, and a members bar and events space, with associated external alterations" tells the officer what is proposed and gives the conditions something to attach to.

Understating the bar or the events programme to make the application simpler produces a permission that does not cover the business, and the first noise complaint turns into an enforcement investigation with a retrospective application at the end of it.

Describe the model as it will actually operate, and get the acoustic baseline measured at the hours you intend to open. Browse all 66 PlanScope report types and start a draft.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. This is general guidance, not legal advice: check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

Does a co-working space need planning permission?

Usually not, where it occupies an existing office. Desk rental, private offices and meeting rooms are office use within Class E(g)(i) of the Use Classes Order, and movement between Class E sub-uses is not development. Check the planning history for conditions restricting use, hours or parking, because a condition binds regardless of the use class.

At what point does a members bar need permission?

When the drinking element becomes a substantial part of the character of the use rather than a facility for workspace members. Drinking establishments were taken out of the use class system in 2020 and are now sui generis, so a bar open into the evening with its own trade creates a mixed use and needs an application.

Why does falling into sui generis matter beyond the application?

Because it removes future flexibility. Class E allows movement between office, retail, café, gym and clinic uses without an application, and a sui generis use loses that. It also forfeits the Class MA prior approval route to residential, which requires at least two continuous years of Class E use and three months vacancy.

Is a premises licence enough to run evening events?

No. Licensing under the Licensing Act 2003 and planning control are separate regimes decided on different grounds. A premises licence does not grant planning permission and planning permission does not grant a licence. Apply for both, and expect representations made in the licensing process to find their way onto the planning file.

What noise evidence does an events programme need?

Two assessments. Plant and building services noise is assessed under BS 4142:2014+A1:2019 against a measured background level. Entertainment noise needs separate consideration of breakout through the facade and party walls, plus patron noise at closing time. Take the background measurements at the hours you intend to open, not on a weekday afternoon.

Sources and further reading

change of useclass eco-workingsui generislicensing

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Commercial Occupiers

View all →
Commercial Occupiers7 min read

A microbrewery's effluent and the undertaker's consent

Brewing effluent is far stronger than domestic sewage. The sewerage undertaker, not the council, decides whether it can go down the drain, and on what terms.

Read article →
Commercial Occupiers6 min read

A pet crematorium and the environmental permit

Animal cremation sits outside the use classes, needs an environmental permit as well as planning permission, and is normally decided on stack height, odour and the visitor element.

Read article →
Commercial Occupiers6 min read

A seasonal food kiosk on private land: the planning rules

Part 4 of the GPDO allows temporary use of land for 28 days a year, including a moveable kiosk. The curtilage exclusion, the day count across the planning unit and any hardstanding or services decide whether you need to apply.

Read article →
Commercial Occupiers6 min read

Reopening a nightclub after years of closure

A sui generis nightclub use does not lapse through non-use alone, but it can be abandoned. Physical condition, length of closure, intervening use and the owner's intentions decide it, and a certificate of lawfulness settles it.

Read article →
Commercial Occupiers6 min read

Betting shops, sui generis use and the change of use case

Betting offices left Class A2 in 2015 and never joined Class E, so a full application is always needed. Frontage clustering policy, shopfront design and the gambling premises licence decide the outcome.

Read article →
Commercial Occupiers7 min read

A sandwich shop moving into hot food and extraction

Adding hot food may or may not be a change of use. The Class E boundary, the extraction design that councils accept, and the evidence a lawfulness certificate needs.

Read article →