A food hall with multiple traders: one planning unit or many

6 min readBy PlanScope Editorial Team

Shared seating, one occupier and common servicing usually make a food hall a single Class E unit. Subdivide the counters and the analysis changes completely.

A food hall planning unit question has one answer that matters for the application and a different answer that matters for the lease. For planning purposes, a food hall with shared seating, shared servicing and a single operator running the building is normally one planning unit, with one use, even though eight traders occupy the counters. Carve the counters up into separately let, separately accessed, separately serviced spaces and you create eight planning units, each with its own use, and the hot food ones among them may sit outside Class E altogether.

Which side of that line you are on is a question of fact. It is decided by how the building actually works, not by how the leases describe it.

What a planning unit is and why it matters here

The planning unit is the area of land or building taken as the relevant whole when deciding what the use is and whether it has changed. The usual starting point is the unit of occupation, unless within a single occupation there are physically separate areas with distinct and unrelated primary uses.

So the questions an officer asks are practical ones.

Is there one occupier of the whole, or several occupiers of defined parts?

Can a customer move freely between the counters and the seating without passing through a separate entrance?

Is the seating shared and managed by the operator, or allocated to individual traders?

Who controls the opening hours, the extraction, the waste, the cleaning and the security?

Answer all four in favour of the operator and you have one unit. Answer them in favour of the traders and you have several, and each one needs its own use assessment.

Shared seating and the primary use

Shared seating is what makes a food hall a single unit in most cases. If the seating is communal, managed by the operator and available to customers of every counter, the primary use of the building is the sale of food and drink for consumption on the premises, which falls within Class E of the Use Classes Order as amended in 2020, specifically the sale of food and drink principally to visiting members of the public where consumption is mostly on the premises.

That matters because movement within Class E does not involve development. A unit lawfully in Class E use can change between the sub-paragraphs of the class without permission, which gives a food hall operator genuine flexibility over the mix at the counters.

What it does not give is flexibility to drift out of the class. And the commonest way a food hall drifts is through takeaway trade.

Hot food and the sui generis trap

The sale of hot food for consumption off the premises is not in Class E. It is sui generis, which means it has no class and any material change to or from it needs planning permission.

Three situations to watch.

A counter that starts as part of a shared dining offer and ends up trading predominantly through delivery platforms and collection. The physical layout has not changed. The use may have.

A counter with its own street door, taking orders for collection, operating later than the hall. That looks like a separate planning unit in a sui generis use.

The whole hall shifting towards collection and delivery, where the primary use of the building is still arguably Class E but the character of the operation has changed materially.

The practical answer is to describe the proposal honestly and to accept conditions that define the boundary. A condition limiting the proportion of floor area given to counters trading for off-premises consumption, or limiting delivery rider numbers and waiting areas, is easier to live with than an enforcement notice two years in.

Extraction serving several kitchens

One building, several kitchens, one flue. This is where the technical evidence sits, and it is also where applications are refused.

A combined extraction system serving multiple cooking lines has to deal with a mix of cuisines, a higher total load than any single restaurant, and odour that varies through the day. Discharge at ridge height, with appropriate filtration and dispersion, is the usual expectation, and a system designed for one kitchen will not serve six.

The authority's environmental health officer is the audience here, and they want a scheme, not a statement of intent. A Ventilation and Extraction Statement covering the total cooking load, the filtration specification, the discharge point and maintenance is the document that answers it, and on a sensitive site an Odour Assessment may be required as well.

Two things to resolve early. The flue route through the building, which on a listed or upper-floor residential building is frequently the constraint that defeats the scheme. And who maintains the system under the leases, because a shared flue with no single responsible party fails within a year.

Hours, noise and management controls

Plant noise and customer noise are assessed separately and both come up.

Plant noise, from extraction, refrigeration and air conditioning, is assessed against the relevant industrial and commercial sound standard, with the background level measured at the nearest residential facade. A Noise Impact Assessment establishing that baseline before the plant is specified saves a redesign.

Customer noise is a management question: dispersal at closing time, external seating, deliveries before 7am, and the queue outside the door. Expect conditions on hours for the hall as a whole, on external seating separately, and on deliveries and waste collection times.

A management plan dealing with waste, cleaning, dispersal and complaint handling, offered with the application rather than extracted by condition, carries real weight with environmental health. Where the scheme affects a town centre with its own policy on food and drink concentration, the authority may also look at cumulative impact alongside any Retail Impact Assessment considerations for the wider frontage.

How to describe the proposal on the form

The description of development is the single most consequential sentence in the application, because it defines what you get.

A description that works for a food hall operated as one unit identifies the building, the use, the operating model and the controls: a flexible food and drink use within Class E comprising multiple serving counters with shared customer seating, operated as a single unit under one management, with associated extraction and plant.

Three things to avoid.

Describing it as a change of use to restaurant, which understates the operating model and invites argument about takeaway trade later.

Listing the individual traders, which ties the permission to tenants who will change within two years.

Leaving the number of counters and the seating arrangement out entirely, which leaves the officer unable to assess the extraction load or the noise.

Then explain the planning unit analysis in the Planning Statement, setting out the facts that make it one unit: single occupier, shared seating, common servicing, unified hours and management. Where you want flexibility to subdivide later, say so and seek a permission that contemplates it rather than relying on the argument afterwards.

Browse the 66 PlanScope report types to see which documents a food and drink proposal of this kind is likely to need, then send any draft for professional review.

This is general guidance, not legal advice. Whether a particular operation is one planning unit or several turns on the facts, so check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is a food hall one planning unit or several?

Usually one, where a single operator runs the building with communal seating, shared servicing and unified hours and management. It becomes several where the counters are separately let with their own entrances, allocated seating and independent servicing. The test is how the building actually works rather than how the leases are drafted.

Which use class does a food hall fall into?

Where the primary use is the sale of food and drink for consumption mostly on the premises, it falls within Class E of the Use Classes Order as amended in 2020. Movement between the sub-paragraphs of Class E does not involve development, which gives an operator real flexibility over the counter mix.

Does a takeaway counter need separate permission?

The sale of hot food for consumption off the premises is sui generis, outside Class E, so a material change to that use needs permission. A counter trading predominantly through delivery and collection, especially with its own street door and later hours, can amount to a separate planning unit in a sui generis use.

Can one extraction system serve several kitchens?

It has to be designed for the combined load, which is higher than any single restaurant and carries a mix of cuisines. Expect discharge at ridge height with appropriate filtration and dispersion. Resolve the flue route early, because on a listed building or one with flats above it is often the constraint that defeats the scheme.

How should the description of development be worded?

Identify the building, the use, the operating model and the controls: a flexible food and drink use within Class E comprising multiple serving counters with shared customer seating, operated as a single unit under one management, with associated extraction and plant. Avoid naming individual traders, who will have changed within two years.

Sources and further reading

food halluse classesclass echange of usecommercial

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Commercial Occupiers

View all →
Commercial Occupiers7 min read

Brewery tap in a railway arch: the planning route

Brewing plus a tap room is a mixed use including a sui generis drinking establishment, so a full application is unavoidable. The arch itself then sets the constraints.

Read article →
Commercial Occupiers6 min read

Planning permission for a barber or hairdresser

Moving into a former shop or office to open a barber shop usually needs no change of use permission. The applications you will need are for the shopfront and the sign.

Read article →
Commercial Occupiers7 min read

Opening a late-night bar: planning and licensing compared

A drinking establishment is sui generis and needs planning permission plus a premises licence. Here is what each regime controls, how hours conflicts arise, and which application to submit first.

Read article →
Commercial Occupiers7 min read

Converting an office to a co-working club

Desk rental sits in Class E(g)(i) and needs no application. The bar, the events programme and the membership model are what decide whether you are in sui generis territory.

Read article →
Commercial Occupiers7 min read

Planning for a place of worship in an industrial estate

Industrial floorspace has no permitted development route into Class F1 worship use. The application turns on peak parking evidence and the loss of employment land, with noise and hours handled by condition.

Read article →
Commercial Occupiers6 min read

A business storing hazardous substances

Consent under the Planning (Hazardous Substances) Act 1990 is separate from planning permission and is triggered by presence rather than use. Aggregation, consultation distances and conditions all catch operators out.

Read article →