Planning Process

Applications on a site that straddles two council boundaries

7 min readBy PlanScope Editorial Team

An authority can only permit development in its own area, so a cross-boundary site needs two applications. Here is how to keep the two determinations aligned on fees, conditions, obligations and levy liability.

A site that crosses a local planning authority boundary needs two applications, one to each authority, because an authority can only grant permission for development in its own area. There is no single-decision route for an ordinary application under the Town and Country Planning Act 1990, and a permission from one council authorises nothing on the other side of the line.

That produces a scheme with two decisions, two fees, two validation lists, two development plans and, if you do not manage it, two different sets of conditions. The work is in making the two determinations arrive at the same answer at roughly the same time.

Why two applications are usually needed

An application is made to the authority for the area in which the land is situated. Where land sits in two areas, each authority has jurisdiction over its part and none over the other, so the standard practice is parallel applications describing the same development, each seeking permission for the works within that authority's area.

In a two-tier area the position can simplify. For county matters such as minerals and waste, the county council is the authority, so a site crossing two district boundaries within one county produces one application rather than two. Inside a National Park the Park authority holds the function for its side of the line.

Some neighbouring authorities have arrangements to discharge planning functions through a joint committee under the Local Government Act 1972. Where that exists it is worth knowing about at pre-application stage, because it changes the committee route even if it does not remove the need for two applications.

Dividing the description of development

The two descriptions have to describe the same scheme without either authority appearing to grant something outside its area.

The approach that causes least trouble is to describe the whole development in both applications, with a clear statement of which elements fall within that authority's area, and to show the full site on the location plan with the authority boundary and the relevant portion outlined. Officers then assess the whole scheme as a planning unit while granting only what they can.

Say it explicitly in the planning statement: that a parallel application has been submitted to the named adjoining authority, with its reference number once known, that the development is indivisible, and that the applicant seeks consistent determination. Cross-reference the reference numbers in both submissions as soon as both are validated.

Ownership certificates need care as well, since the land interests and any agricultural holdings differ across the boundary and each application needs its own correct certificate, as set out in ownership certificates A to D.

Fees payable to each authority

Do not guess this one. The national fees regulations contain a specific provision for development on land straddling a boundary, and the calculation is not simply the full fee twice.

Write to both authorities before submitting, set out the floorspace or unit numbers falling in each area and the total, state the figure you intend to pay each of them, and ask for written confirmation. An underpaid fee leaves the application invalid and the clock does not start, which on a cross-boundary scheme means the two determinations fall out of step before they have begun. Exemptions and reductions follow the national categories, covered in planning fee exemptions and reductions.

Co-ordinating consultation and committee dates

The determination periods run separately, and so do the publicity arrangements, so left alone the two applications will drift apart.

Six things are worth agreeing in writing at pre-application stage.

  1. A single set of submission documents prepared to the union of both validation lists.
  2. A target validation date so the eight or 13 week periods start together.
  3. Aligned consultation start dates, since the 21 day period is the same but the start is not.
  4. One set of consultee approaches, with a single technical submission to the highway authority, lead local flood authority and water undertaker where those bodies cover both areas, and two where they do not.
  5. Joint officer meetings, with both case officers present.
  6. Target committee dates in the same cycle, or confirmation that both will be determined under delegated powers.

A Planning Performance Agreement covering both authorities, or two agreements with matching milestones, is the mechanism that makes this real rather than aspirational. It costs money. And on a cross-boundary scheme it is almost always worth paying.

Chasing consultees is harder when two case files exist, and the approach set out in getting consultee responses and the officer's case file needs doing twice, with the responses cross-copied so neither officer is working from half the picture.

Inconsistent decisions and managing the risk

The realistic failure modes are these.

Outcome Effect
Both grant, matching conditions The scheme is deliverable
Both grant, different conditions Conflicting obligations on one development, often unbuildable as consented
One grants, one refuses The permission is worthless until the refusal is overturned
One determines months later The first permission's conditions may already be unworkable

Mismatched conditions are the quiet problem. A construction management plan condition requiring one access route in one authority's decision and a different one in the other cannot both be discharged. Ask both authorities to work to an agreed draft condition schedule before determination, and provide it yourself rather than waiting to see what arrives.

Where one authority refuses, you have the usual appeal rights against that decision. The Planning Inspectorate can link appeals and deal with related cases together, and a linked appeal on a cross-boundary scheme is worth requesting explicitly. Where one authority simply does not determine, the trade-offs in appealing non-determination or waiting are sharper than usual, because appealing one half while the other half sits with a willing officer rarely helps.

Section 106 agreements with two authorities

Planning obligations are given to the authority for the area in which the land is situated, so a single deed with both authorities as parties, and obligations drafted to run to the relevant authority for the land in its area, is the clean structure. Two separate deeds work but create two sets of monitoring, two sets of triggers and two opportunities for drafting to diverge.

Contributions need allocating. Education, open space and affordable housing demand generated by a cross-boundary scheme does not divide neatly along the boundary, and each authority will reasonably want the contribution its own services require. Expect that conversation to be the slowest part of the process, and expect to need a variation later as the scheme evolves, which is where the mechanics in varying a section 106 agreement after permission become relevant.

Levy liability across the boundary

Each authority is the charging authority for its own area, with its own charging schedule and its own rates. Liability is calculated on the chargeable floorspace in each area, so two liability notices arrive and the rates may differ substantially for identical buildings a few metres apart.

Illustrative example, not a real scheme: a 120 dwelling development with 78 units in authority A and 42 in authority B, with the primary access and the attenuation basin in A and the public open space in B. Two applications, each describing all 120 units and identifying the split. Two fees, calculated under the straddling provision and confirmed in writing. One environmental statement serving both. One deed with both councils as parties. Two levy liability notices at different rates. One set of conditions, agreed in draft before either committee.

Claim any exemptions and submit the assumption of liability in both areas, and remember that the self-build and residential extension exemptions, where they apply, are claimed separately to each charging authority. Missing one is a common and expensive error.

But the single most useful thing you can do is the least technical. Get both case officers in the same room, early, and keep them there.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Can one council determine an application for a cross-boundary site?

Not for an ordinary application under the Town and Country Planning Act 1990. An application is made to the authority for the area in which the land is situated, and a permission authorises nothing outside that area. For county matters such as minerals and waste, the county council is the authority, so a site crossing district boundaries within one county produces a single application.

How much is the fee for a cross-boundary application?

The national fees regulations contain a specific provision for development on land straddling a boundary, so it is not simply the full fee twice. Set out the split in writing to both authorities before submitting, state what you intend to pay each, and get written confirmation. An underpaid fee leaves the application invalid and the periods never start.

What happens if one authority grants and the other refuses?

The permission is of no practical use until the refusal is overturned, because neither decision authorises development on the other side of the line. Appeal the refusal and ask the Planning Inspectorate to link the appeal to the related case. Aligning determination dates in advance is a far better remedy than dealing with the mismatch afterwards.

Do you need one section 106 agreement or two?

One deed with both authorities as parties is usually cleaner, with obligations drafted to run to the relevant authority for the land in its area. Two separate deeds work but create duplicate monitoring, duplicate triggers and two chances for the drafting to diverge. Allocating contributions between the authorities is normally the slowest negotiation.

How does the Community Infrastructure Levy work across a boundary?

Each authority is the charging authority for its own area, with its own schedule and rates, so liability is calculated on the chargeable floorspace in each part and two liability notices follow. Rates can differ substantially for identical buildings metres apart. Submit the assumption of liability and any exemption claims separately to each charging authority.

Sources and further reading

cross boundaryplanning processplanning feessection 106cilmajor development

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Planning Process

View all →
Planning Process7 min read

Varying a permission for development already begun

Section 73B of the Town and Country Planning Act 1990 allows a permission to be varied where the effect is not substantially different, including for works already carried out. How the test works, and how to choose between the routes.

Read article →
Planning Process7 min read

Planning history searches before you buy a site

The standard search misses more planning risk than it finds. Here is what to check on the register, and what to ask before you exchange.

Read article →
Planning Process6 min read

Accompanied and unaccompanied inspector site visits

The inspector will visit your site before deciding the appeal. Knowing whether it is accompanied, and what you are allowed to say, changes how you prepare.

Read article →
Planning Process6 min read

The appeal questionnaire and what the council must supply

The council's appeal questionnaire arrives within days of the start date and carries the officer report, policy extracts and consultation responses. Read it before you draft a word.

Read article →
Planning Process6 min read

What stops the eight week clock on an application

The determination period runs from the day after a valid application is received. Consultee silence and amended drawings do not pause it; only a written extension does.

Read article →