Applying for an award of costs at appeal

7 min readBy PlanScope Editorial Team

An award of costs at planning appeal turns on unreasonable behaviour that caused wasted expense, not on the outcome. Here is the test, when to apply, how partial awards work and which evidence persuades.

An award of costs at appeal turns on behaviour, not on who wins. A successful appellant with a well-argued case gets no costs if the authority defended its refusal properly, and an appellant who loses can still recover costs where the council behaved unreasonably on a discrete issue. For anyone preparing a costs application in a planning appeal, that distinction is the whole discipline: you are building a case about conduct and wasted expense, running alongside the case about planning merits.

What an award of costs covers

An award requires the losing party on the costs question to pay some or all of the other party's costs of the appeal process. It covers professional fees, the preparation of evidence and attendance, so far as those costs were unnecessarily incurred because of the behaviour complained of.

It does not cover the application fee you paid to the council, which is a different matter calculated on floorspace and site area, and it does not cover the cost of the original application work. Nor does it compensate for delay, lost development value or financing cost. The award is about the appeal.

The statutory basis sits in two places. For inquiries and hearings, section 250(5) of the Local Government Act 1972 applies through section 322 of the Town and Country Planning Act 1990. For appeals decided without an inquiry or hearing, section 322C of the 1990 Act supplies the power, which is why written representations appeals can also produce an award.

Unreasonable behaviour as the test

The Planning Practice Guidance on appeals sets the test in two limbs. There must be unreasonable behaviour, and that behaviour must have caused the party applying to incur unnecessary or wasted expense.

Both limbs need evidence. An application that establishes the first without the second fails, because there is nothing to compensate. An application that shows wasted expense arising from an honest disagreement also fails, because disagreement is not unreasonable behaviour.

The guidance divides unreasonable behaviour into procedural and substantive. Procedural conduct concerns the running of the appeal. Substantive conduct concerns the planning merits of the position a party took and maintained.

Type What it concerns Typical consequence
Procedural Timetable failures, late evidence, non-attendance, causing a postponement A partial award limited to the costs thrown away
Substantive Maintaining a position on the merits that cannot be supported by evidence A full award where the whole appeal was unnecessary

Examples the guidance treats as unreasonable

For a local planning authority, the recurring categories are recognisable to anyone who has run appeals.

  • Failing to produce evidence to substantiate a reason for refusal
  • Making vague or generalised assertions about the effect of a proposal without evidence
  • Refusing a scheme that plainly accords with the development plan where no material considerations indicate otherwise
  • Failing to review the case promptly after a relevant change, such as a new appeal decision on a comparable site or the adoption of a new policy
  • Determining a case differently from a materially similar one without explanation
  • Adding a reason for refusal late, or withdrawing one so late that the appellant has already paid for the evidence to answer it

The last two are where most successful applications live. A reason for refusal withdrawn in the authority's appeal statement, after the appellant has commissioned a noise survey or a daylight assessment to answer it, is the clearest case of wasted expense there is. Keep the invoice.

Where a reason for refusal was added by members against officer advice and the authority then produces no evidence for it, that too falls squarely in the guidance. The committee minute and the officer report are your evidence, and a well-prepared Planning Statement submitted with the original application helps because it shows the policy case was before the authority all along.

Timing of the application during the appeal

Make the application at the right point and in writing, because a late application is usually refused on that ground alone.

  1. At an inquiry or hearing, make the application orally before the close, and hand in a written note setting out the grounds.
  2. In written representations, make it in writing within the appeal timetable, by the final comments stage at the latest and before the decision is issued.
  3. Set out which behaviour you rely on, which limb of the guidance it falls under, and what expense it caused.
  4. Quantify the expense in outline, by reference to invoices or fee quotes, even if the exact sum is left to assessment.
  5. Serve a copy on the other party so they can respond, since they are entitled to do so.

The inspector deals with costs either in the appeal decision or in a separate costs decision issued alongside it. There is no appeal against a costs decision. Judicial review is the only challenge, and it is rarely proportionate.

Partial awards and how they are assessed

Partial awards are common and are often the realistic objective. Where only part of a party's conduct was unreasonable, the inspector can award the costs attributable to that part, described in the decision as the costs thrown away by the withdrawn reason or the postponed hearing.

The decision establishes entitlement. It does not fix the figure. The parties are expected to agree quantum between themselves, and where they cannot, the costs are referred for detailed assessment in the Senior Courts Costs Office. That process has its own cost, so a pragmatic settlement at eighty per cent of a modest sum usually beats an assessment.

Keep the records that make agreement possible. Time records by issue rather than by week, specialist invoices tied to specific refusal reasons, and a short schedule showing what would not have been spent had the authority behaved differently.

Costs against an appellant

The regime runs both ways, and consultants advising on a weak appeal should say so in writing.

The guidance treats as unreasonable, among other things, pursuing an appeal with no reasonable prospect of success, failing to provide information the Inspectorate has asked for, failing to attend a site visit or hearing, introducing new grounds late, and appealing against conditions that are plainly necessary and reasonable. Vexatious or repetitive appeals fall into the same territory.

The practical risk is concentrated in two situations. An appeal lodged to buy time on a site facing enforcement, and an appeal against a refusal that the appellant knows is unanswerable on the development plan. Both attract applications from authorities, and inspectors do grant them.

Interested parties can also apply for costs, and in limited circumstances can have costs awarded against them, though this is uncommon in practice.

Evidence needed to support the application

Treat the costs application as a separate evidential exercise from the appeal. The documents that win it are rarely the documents that win the appeal.

What tends to persuade: the decision notice and the officer report, showing what the authority relied on and when. The committee minute where members departed from the recommendation. Correspondence in which you asked the authority to substantiate a reason and it did not. The appeal statement where a reason was withdrawn, with the date. Invoices and fee notes for the evidence rendered unnecessary. And a one-page chronology tying each item to a date.

What tends not to persuade: assertions that the council was obstructive, complaints about officer conduct unconnected to the appeal, and arguments that the refusal was simply wrong. Being wrong is not unreasonable. Maintaining a position with no evidence is.

One honest uncertainty. Inspectors vary in how readily they find substantive unreasonableness, and the same facts can produce different outcomes, so treat a costs application as worth making on strong facts rather than as a reliable part of the appeal budget.

If you are putting the evidence base together for the appeal itself, check which reports the case is likely to need and see PlanScope pricing before you commission the specialists.

This is general guidance, not legal advice. Check the position with a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Can I get costs just because I won the appeal?

No. The outcome of the appeal is not the test. An award requires unreasonable behaviour by the other party and unnecessary or wasted expense caused by it. A successful appellant whose refusal was defended with proper evidence recovers nothing, while a party who loses the appeal can still recover costs thrown away on a discrete issue.

Are costs available in written representations appeals?

Yes. Section 322C of the Town and Country Planning Act 1990 supplies the power for appeals decided without an inquiry or hearing. For inquiries and hearings, the power comes from section 250(5) of the Local Government Act 1972 as applied by section 322 of the 1990 Act. The behavioural test is the same in both cases.

When should the application be made?

At an inquiry or hearing, orally before the close, supported by a written note. In written representations, in writing within the appeal timetable and no later than the final comments stage. Applications made after the decision is issued are normally refused on timing alone, so diarise it with the rest of the timetable.

Who decides how much is paid?

The inspector decides entitlement, not quantum. The parties are expected to agree the figure between themselves, and where they cannot the costs go for detailed assessment in the Senior Courts Costs Office. Because assessment has its own cost, a negotiated settlement at a discount usually beats pursuing the full sum.

Can the council recover costs from me?

Yes. Pursuing an appeal with no reasonable prospect of success, failing to supply information, missing a site visit, raising new grounds late or appealing conditions that are plainly necessary can all lead to an award against an appellant. Appeals lodged mainly to delay enforcement are a particular risk.

Sources and further reading

planning appealscosts awardunreasonable behaviourplanning inspectorateappeal procedurecosts

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Costs, Fees and Budgeting

View all →
Costs, Fees and Budgeting8 min read

Costing a stopping up order for a highway or footpath

Public rights do not lapse through disuse and planning permission does not override them. This covers the section 247 and 257 routes, what objectors actually argue about, and how to keep the order off the critical path.

Read article →
Costs, Fees and Budgeting7 min read

Costing an affordable housing review mechanism

Early and late stage review mechanisms are decided by their definitions, not their headline percentages. This covers the inputs that move the answer, who pays for the review and the caps to secure before signing.

Read article →
Costs, Fees and Budgeting7 min read

Costing an employment land assessment for an allocated site

On an allocated employment site the fee sits in evidence gathering, not analysis. This covers the marketing records councils expect, the suitability tests that decide it, and how to sequence the work.

Read article →
Costs, Fees and Budgeting7 min read

Costing an odour assessment for a kitchen or waste use

The fee for an odour assessment depends on whether the council accepts a qualitative risk based appraisal or expects dispersion modelling. Here is what sits behind each, and how to scope the work before you commission it.

Read article →
Costs, Fees and Budgeting6 min read

Costing a telecommunications compliance declaration for a mast

An ICNIRP declaration is produced by the operator's own radio engineers and closes the health issue. Siting and appearance are the only matters the council can decide on.

Read article →
Costs, Fees and Budgeting6 min read

Costing an equalities impact assessment for a public applicant

The public sector equality duty is continuing, so an equalities impact assessment has to be revisited at every material change. Budgeting for one document is the common mistake.

Read article →