Budgeting a permission in principle application

7 min readBy PlanScope Editorial Team

Permission in principle settles location, use and amount, then technical details consent does everything else. Two fees, two consultations, and an area-based charge at stage one.

Permission in principle costs two fees rather than one, and that is the first thing to understand before choosing the route. The permission in principle establishes that the location, the land use and the amount of development are acceptable. Everything else, which is to say the design, the access, the drainage, the ecology and the materials, is dealt with afterwards in a separate technical details consent application with its own fee and its own determination period.

For the right site, usually a small infill plot where the only real question is whether a house belongs there at all, the route is quick and gives a landowner something to market. For the wrong site it is two sets of consultation, two sets of objections and a bill larger than a single outline application would have been.

What permission in principle establishes

The route comes from sections 58A and 59A of the Town and Country Planning Act 1990, inserted by the Housing and Planning Act 2016, and it is deliberately narrow.

A permission in principle settles three matters and no others: the location of the development, the land use, and the amount of development expressed as a number of dwellings, usually as a minimum and a maximum. It cannot be granted subject to conditions, which removes the ability to agree a holding position on a matter that is nearly resolved.

Technical details consent then deals with everything else, and it has to be consistent with what the permission in principle established. Propose a different quantum or a different use at the second stage and you are outside the permission, which means a fresh application.

A permission in principle granted on application runs for a default period, commonly three years, unless the authority specifies longer. An entry on a brownfield land register, which is the other way a site can acquire permission in principle, runs on its own timescale. Check the current Order for both, because the figures have been amended.

Which sites the route is open to

The application route is restricted to minor housing-led development. In broad terms that means fewer than ten dwellings on a site below the major development threshold, with any non-residential element limited, and it excludes development requiring environmental impact assessment or appropriate assessment under the habitats regulations.

So the route is closed to most of the schemes that would benefit from staged consent. A site of twelve units cannot use it. Neither can a site where screening indicates likely significant effects, and the cost of establishing that is the subject of environmental impact assessment screening and scoping request costs in its own right.

Check the exclusions before paying anything. An invalid permission in principle application wastes the fee and several weeks, and the authority is not obliged to tell you in advance that the route is unavailable.

The fee basis and what it buys

The fee for a permission in principle application is calculated by reference to the site area, charged for each 0.1 hectare or part of it, rather than per dwelling. The technical details consent fee is then charged on the basis that applies to the development itself.

Both figures sit in the national fee regulations, which were uplifted in December 2023 and are indexed annually on 1 April, so take the current schedule rather than a number from a file note. The practical consequence of the area basis is that a large plot with one house on it pays more at the first stage than a tight plot with four, which is the opposite of how most people assume planning fees work.

Cost line Permission in principle stage Technical details stage
Application fee By site area, per 0.1 hectare On the normal basis for the development
Plans Site location plan, red line Full drawing package
Technical reports None required by the Order Whatever the validation list requires
Agent time Short Equivalent to a full application
Determination Statutory period for minor development Shorter statutory period than a full application

The honest summary is that the first stage buys certainty on principle and nothing else. It does not reduce the work at the second stage, and it does not reduce the evidence the authority will eventually require.

Documents at the first stage

The statutory requirement is light: the application form, a site location plan identifying the land, a statement of the amount of development, and the fee. No design and access statement, no technical reports, no elevations.

Light does not mean nothing, though, and this is where applicants misjudge the route. The authority has to publicise the application and consult, and it can refuse the principle where a constraint cannot be resolved. A plot in flood zone 3 with no sequential test, or a site with no demonstrable access, invites refusal on principle even though the Order required no evidence about either.

So the judgement is tactical. Where a constraint is visible on a map and will be raised, submit a short note dealing with it voluntarily, even a paragraph with a plan extract. Where the site is unconstrained, submit the minimum and hold the budget back for stage two. A brief planning statement addressing the development plan position costs little and heads off the objection that the principle is contrary to policy.

Technical details consent is a full application in everything but name. Expect to provide the drawings, the levels, the access arrangements, the drainage, the ecology and biodiversity information, the arboricultural material and whatever else the authority's local validation list requires.

Two features distinguish it. The determination period is shorter than for a comparable full application, which is the route's main practical benefit. And the authority cannot revisit the principle: location, use and amount are settled, so the argument is confined to detail.

Watch the sequencing. Site investigation and seasonal survey work still has to be done, and budgeting ground investigation on a brownfield plot is a cost that falls at the second stage however little the first stage cost. Levy liability arises on the technical details consent as the operative permission, so claim any self-build exemption against that application and before commencement.

Where the two-stage route costs more

Five situations where the arithmetic goes the wrong way.

  1. A large plot with a small number of dwellings, where the area based fee at stage one exceeds what an outline application would have cost.
  2. A site where the principle was never in doubt, so the first stage bought nothing a pre-application enquiry would not have confirmed.
  3. A contested site, where two rounds of publicity produce two rounds of objection and two decisions capable of appeal.
  4. A site needing a Grampian condition or an obligation to make the principle acceptable, which permission in principle cannot deliver because it cannot carry conditions.
  5. A scheme whose quantum is likely to change, since a revised number of dwellings needs a new permission in principle rather than a variation.

That last point deserves emphasis. The flexibility developers are used to, varying a permission under section 73, does not apply here in the same way, so the amount of development stated at stage one needs to be right, with a range wide enough to cope with design evolution.

Comparing it with outline permission

Outline permission remains the better tool for most sites with any complexity.

An outline application can cover major development, can be granted subject to conditions, allows reserved matters to be approved in phases, and can be varied. It costs more at the outset and takes longer, and it requires more information up front, including a design and access statement and the technical material the authority insists on.

Permission in principle wins on three things: speed to a decision on principle, a low information burden at stage one, and a clean answer a landowner can show a buyer or a lender. For an owner selling a single plot, that is often exactly what is wanted.

An illustrative example. An owner of a garden plot inside a settlement boundary, with no designations and an existing vehicular access, applies for permission in principle for one to two dwellings on a 0.08 hectare site. The fee is one band of the area based charge, the submission is a form, a red line plan and a one page policy note, and the decision confirms the principle. The plot is then marketed with the permission, and the buyer commissions the design and brings the technical details consent application themselves.

That is the route working as intended. Use it for that, and use outline permission for anything where the detail and the principle cannot sensibly be separated.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What does permission in principle actually grant?

It settles three matters: the location of the development, the land use, and the amount of development expressed as a number of dwellings. Nothing else. Design, access, drainage, ecology and materials are dealt with in a separate technical details consent application, which must be consistent with what the permission in principle established.

Which sites can use the application route?

Minor housing-led development only: broadly fewer than ten dwellings on a site below the major development threshold, with any non-residential element limited, and excluding development requiring environmental impact assessment or appropriate assessment under the habitats regulations. Check the current Order for the precise limits before paying a fee.

How is the permission in principle fee calculated?

By site area, charged for each 0.1 hectare or part of it, rather than per dwelling. That means a large plot with one house pays more at the first stage than a tight plot with several. The figures sit in the national fee regulations and are indexed annually on 1 April, so use the current schedule.

Can a permission in principle be granted with conditions?

No. It cannot carry conditions, which removes the ability to agree a holding position on an outstanding matter. Where the principle depends on something being secured, such as a Grampian condition or a planning obligation, outline permission is the appropriate route instead.

Is permission in principle less expensive than outline permission?

At the first stage, usually yes for a small plot, because the information burden is low. Overall, often not, because you pay two fees and the technical details consent requires the same evidence a full application would. For a large plot with few dwellings, the area-based fee can exceed an outline application fee outright.

Sources and further reading

permission in principletechnical details consentplanning feesself-buildbudgeting

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Costs, Fees and Budgeting

View all →
Costs, Fees and Budgeting7 min read

Expert witness costs and proofs of evidence

Sitting days are the smallest part of an expert witness bill. Here is how proofs, appendices, rebuttals and common ground drive the cost, and where to cut it.

Read article →
Costs, Fees and Budgeting8 min read

When planning counsel is worth the fee at an inquiry

Counsel earns the fee when an inquiry turns on policy interpretation, lawfulness or cross-examination. Here is how to tell, and what to agree about fees first.

Read article →
Costs, Fees and Budgeting7 min read

Budgeting a demolition prior notification

Demolition runs through two regimes at once: a Part 11 prior approval on method and restoration, and a Building Act notice that can impose shoring and weatherproofing.

Read article →
Costs, Fees and Budgeting8 min read

Paying twice for surveys after a design change

A layout change after the pre-application meeting can cost a survey season rather than a fee. What survives a redesign, what does not, and how to sequence the work.

Read article →
Costs, Fees and Budgeting7 min read

What it costs to make a lawful start on a permission

The physical works that begin a development are small. The cost sits in discharging pre-commencement conditions, serving levy and building control notices, and proving afterwards that the start happened.

Read article →
Costs, Fees and Budgeting7 min read

Budgeting a BREEAM assessment across both stages

BREEAM costs split across registration, certification at two stages, assessor fees, design team time and specialist credits. Where appraisals come in short, and why a credit buffer pays.

Read article →