Capacity tables in a retail impact assessment

7 min readBy PlanScope Editorial Team

The capacity and diversion tables decide whether a retail impact assessment is taken seriously. Here is what each input needs, where the figures come from, and the assumptions officers challenge.

A retail capacity table in a Retail Impact Assessment has to show three things. How much convenience and comparison expenditure the catchment will generate, how much of that the existing centres can absorb, and what is left over for new floorspace. If the arithmetic is wrong, nothing else in the assessment carries weight. The National Planning Policy Framework (August 2026 edition) keeps a default floor of 2,500 m2 of gross floorspace for impact assessment on retail and leisure proposals outside a defined centre that are not in accordance with an up-to-date plan, and plenty of authorities set a lower local figure in their adopted plan.

So the first question on any scheme is not how big the table should be. It is which threshold applies, and whether the authority has set one of its own.

What the quantitative case has to establish

The impact test in national policy asks about two effects. The first is impact on existing, committed and planned public and private investment in a centre in the catchment. The second is impact on town centre vitality and viability, including local consumer choice and trade in the centre and the wider area.

Capacity arithmetic answers neither question directly. What it does is set up the answer, by showing whether the proposal is drawing on spending growth that no existing operator has claimed, or taking turnover away from shops that are already trading.

A table that shows surplus expenditure of several million pounds in the design year is a different case from one that shows the catchment is already over-provided. Both can be presented honestly. Only one of them supports a straightforward application.

Study area definition and zones

The study area is the single most contestable input, and officers know it. Draw it too wide and the proposal looks modest against a large expenditure pool. Draw it too narrow and the diversion percentages climb.

Conventional practice is to define a primary catchment from drive-time isochrones or from household survey results, then split it into zones that follow postcode sectors or ward boundaries so that population and expenditure data can be attached to each one. Convenience catchments are tight. Comparison and bulky goods catchments stretch much further.

Three points usually decide whether a study area survives scrutiny:

  1. Whether the zones match those used in the authority's own retail study, so the two can be read side by side.
  2. Whether the boundary follows a defensible travel pattern rather than an administrative line.
  3. Whether a household survey was commissioned, and if not, what evidence stands in for observed shopping patterns.

Where an authority has a recent retail and leisure study, adopting its zones costs nothing and removes an argument. Where the study is old, say so and explain what has changed since.

Expenditure, market share and turnover inputs

Four inputs drive every capacity table. Population by zone over the assessment period, per capita expenditure on convenience and comparison goods, the proportion of that expenditure spent through the internet rather than in shops, and the turnover efficiency of existing floorspace.

Each one needs a named source and a stated year. Population should come from the relevant subnational projections. Expenditure per head, growth rates and the special forms of trading allowance come from a published commercial data series, and the assessment should name the series and the edition rather than describing it vaguely. Turnover efficiency for existing stores should be drawn from company average sales densities where the operator publishes them.

Then comes the part that attracts most of the challenge. Market share, or penetration rate, is the percentage of each zone's expenditure the proposal expects to capture. There is no published figure for a store that does not yet exist, so the assumption has to be reasoned from comparable stores of similar size and fascia in similar catchments, and the comparison has to be shown.

Input Typical source Common failing
Zonal population Subnational population projections Using an outdated base year
Expenditure per head Named commercial retail data series Series and edition not stated
Special forms of trading Same series, forecast deductions Applied to the base year only
Existing turnover Published company sales densities Benchmark applied to all stores alike
Proposal market share Reasoned comparison with similar stores Asserted without any comparator

Trade diversion and its presentation

Trade diversion is where the table becomes an impact assessment rather than a demand study. The proposal's design year turnover has to be allocated between the centres and stores it will draw from, zone by zone, and expressed both in pounds and as a percentage of each affected centre's convenience or comparison turnover.

Present it as a matrix. Rows for the centres and stores affected, columns for the source of trade, and a clear statement of the residual percentage impact on each centre. A single headline figure invites the objection that the detail is hidden.

Two conventions matter. Diversion should sum to the whole of the proposal's turnover, with nothing unallocated, and it should be reported before and after any assumed growth in expenditure. Officers will test whether growth has been used to absorb impact that would otherwise fall on an existing centre.

Illustrative example. A 3,200 m2 foodstore in an edge-of-centre location might draw 45 per cent of its convenience turnover from two existing supermarkets in the same town, 30 per cent from stores in an adjoining district centre, and the balance from smaller shops and from expenditure currently leaking out of the catchment. If the district centre convenience turnover is modest, a 30 per cent draw could be a very large proportionate impact even though the absolute sum looks small. These figures are illustrative only and are not drawn from any real scheme.

Impact on committed and planned investment

The investment limb of the test is routinely underdone. It asks about specific investment, not general health, so the assessment has to identify the schemes concerned and say something about each.

That means searching the authority's register for extant permissions in and around the relevant centres, checking allocations in the adopted plan and any emerging plan, and asking the authority directly what investment it considers at risk. A scheme with planning permission but no sign of commencement carries different weight from one under construction. Say which is which, and give the application reference.

Where an authority refuses on investment grounds without identifying the investment, that is a weakness worth testing. The reason for refusal has to be founded on something an inspector can examine.

Vitality and viability indicators alongside the numbers

The second limb is qualitative, and the capacity table cannot answer it alone. The usual indicators are the vacancy rate and how it compares with the national figure, the mix of comparison, convenience and service uses, the proportion of multiple retailers, footfall counts where the authority or a partnership collects them, rental levels and the state of the environment.

Collect them from a health check survey of your own, carried out on a named date, and compare them with the authority's last published health check. Where the two disagree, explain the difference rather than ignoring it.

An honest assessment will sometimes conclude that a centre is already weak. That does not automatically defeat the proposal. A centre losing a modest share of comparison trade while gaining linked trips may be in a better position than one protected on paper and declining anyway. But the argument has to be made with evidence, not asserted.

Where a quantitative case gets undermined

The failures repeat. A study area drawn to flatter the scheme. Market shares with no comparator. Design year growth doing the work that mitigation should do. Diversion that does not sum. Existing turnover benchmarked at a single sales density for every store regardless of fascia or age. And a sequential test treated as a formality rather than as the prior question it is.

That last one deserves attention, because the retail Sequential Test (Retail) comes before impact in the policy sequence. If a sequentially preferable site is available and suitable, the capacity arithmetic never gets reached. Scope the two together from the start, and keep the same catchment definition in both.

Where a scheme also generates enough trips to need traffic work, the retail catchment and the transport catchment should be consistent, which is one reason the assumptions behind trip distribution and assignment in a Transport Assessment are worth settling early. The same applies to the employment and expenditure claims in an Economic Impact Assessment, which should not contradict the turnover figures in the retail tables.

A Retail Impact Assessment drafted in PlanScope gives you the section structure, the policy framing and the places where site-specific figures belong, with TO BE CONFIRMED flags where the data has to come from your own survey or data subscription. Enter your postcode on PlanScope to see which reports the site is likely to need before you commission the retail work.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

When is a Retail Impact Assessment required?

National policy sets a default floor of 2,500 m2 gross for retail and leisure proposals outside a defined centre that do not accord with an up-to-date plan. Many adopted local plans set a lower local threshold, sometimes a few hundred square metres. Check the adopted plan and the authority's validation list, because the local figure takes precedence over the national default.

What is the difference between capacity and impact?

Capacity arithmetic estimates how much expenditure growth is unclaimed by existing floorspace. Impact measures what the proposal takes away from existing centres and investment. A scheme can be within capacity and still cause unacceptable impact if the trade it draws falls disproportionately on one weak centre, so both have to be reported.

Do I need a household shopper survey?

Not always, but it is the strongest evidence of where people actually shop. Without one you have to justify market shares and existing patterns from the authority's own retail study, operator data or comparable catchments. Larger and more contested schemes usually justify commissioning a survey, because the alternative is an argument about assumptions.

How should trade diversion be presented?

As a matrix showing each affected centre and store, the pounds diverted from each, and the residual percentage impact on that centre's convenience or comparison turnover. The diversion should sum to the whole of the proposal's turnover with nothing unallocated, and the figures should be shown both before and after assumed expenditure growth.

Does the sequential test come before the impact test?

Yes. The sequential approach asks whether a sequentially preferable site is available and suitable. If one is, the impact arithmetic is not reached. Scope both together, use the same catchment definition in each, and avoid treating the sequential test as a short formality attached to the end of the retail evidence.

Sources and further reading

retail impact assessmenttown centressequential testretail capacitymajor development

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Report Deep Dives

View all →
Report Deep Dives7 min read

The maintenance section of a landscape strategy

The maintenance section is where a landscape strategy is won or lost. It has to name who does the work, for how long, paid from what, with what happens when planting fails.

Read article →
Report Deep Dives7 min read

The viability appraisal inputs section explained

A reviewer reads the land value derivation and the developer return first. How to set out every input with its source, and test the conclusion honestly.

Read article →
Report Deep Dives7 min read

The mitigation section of a protected species survey

Officers read the mitigation section asking whether the measures can be conditioned and whether a licence is likely. How to write one that answers both.

Read article →
Report Deep Dives7 min read

The sequential test section of a flood submission

The area of search and the list of reasonably available sites decide whether a sequential test survives review. Land ownership is not a filter.

Read article →
Report Deep Dives7 min read

The root protection area section of a tree survey

The root protection area is calculated as 12 times stem diameter and capped at 707 square metres. Everything in the arboricultural submission follows from that figure.

Read article →
Report Deep Dives7 min read

The significance of effects section of an EIA chapter

Matrices do not do the thinking. Here is how to write a significance section a decision maker can follow and a reviewer can test, chapter by chapter.

Read article →