Climate-based daylight modelling in a planning submission
BS EN 17037 target illuminance and vertical sky component answer different questions. An assessment that explains which is doing what fares better than one with more numbers.
Climate based daylight modelling planning submissions work from an hourly climate file rather than from an overcast sky, and they report how much of a room reaches a target illuminance for how much of the year. That is a different question from the one vertical sky component answers, and the two now sit side by side in a well-prepared assessment rather than one replacing the other.
Officers are still getting used to seeing both. An assessment that explains why each method is present, and what each one is being asked to decide, does better than one that simply produces more numbers.
Why illuminance methods sit alongside the older ratios
The older approach treats daylight as a geometric ratio under a standard overcast sky. Vertical sky component measures how much sky a window can see from a reference point. Average daylight factor expresses interior illuminance as a percentage of simultaneous exterior illuminance. Both are quick, both are reproducible, and neither says anything about the actual sky over the site during the year.
BS EN 17037 introduced illuminance-based provision criteria, and the 2022 third edition of the BRE guidance on site layout planning for daylight and sunlight brought those methods into the mainstream for assessing daylight inside new rooms. The older ratios kept their role for a different task: judging the effect of a proposal on daylight reaching the windows of existing neighbouring buildings.
So the division of labour in a submission is usually this. Illuminance methods for the daylight the new scheme provides to its own occupants. Vertical sky component and the no-sky line for the daylight the new scheme takes away from the neighbours. Confusing the two produces an assessment that answers neither question properly.
Target illuminance levels and exceedance
BS EN 17037 expresses daylight provision as a target illuminance achieved over a proportion of the reference plane for a proportion of daylight hours, with three recommendation levels.
| Recommendation level | Target illuminance over 50 per cent of the plane | Minimum target over 95 per cent of the plane |
|---|---|---|
| Minimum | 300 lux | 100 lux |
| Medium | 500 lux | 300 lux |
| High | 750 lux | 500 lux |
The time criterion is that the target is met for at least half the daylight hours in the year.
The UK National Annex modifies this for dwellings, recognising that applying a 300 lux target to every room in a British flat produces results nobody would accept. It sets room-specific target illuminances for dwellings, lower for bedrooms, higher for kitchens, with living rooms between. Quote the National Annex values and say that you are using them, because an assessment that reports against the 300 lux European target without mentioning the Annex invites a question about whether the right criteria were applied.
Spatial daylight autonomy is the metric most software reports, expressing the percentage of the reference plane meeting the target for the required share of occupied hours. It is close to the BS EN 17037 provision criterion but not identical, because the hours and the definitions differ. State which you have calculated.
Weather file and location inputs
A climate-based calculation is only as good as the climate file behind it, and this is where assessments quietly go wrong.
Use a file representative of the site's location. A London file applied to a scheme in Manchester or Newcastle changes the result, and reviewers do check. Name the file, its source and its reference period in the methodology section.
Three further inputs belong in the same paragraph. The sky model used, since different implementations handle the diffuse distribution differently. The ground reflectance assumed outside the window, commonly 0.2, which matters more for lower floors than people expect. And the treatment of surrounding buildings, which should include the existing context, any consented schemes, and the proposal's own massing.
Leaving a consented neighbouring tower out of the model is the single most common criticism a reviewer makes, and it is the hardest to recover from once pointed out.
Room-by-room reporting conventions
Report every habitable room, not a selection. The table that works has one row per room and the following columns: room reference, room use, floor level, aspect, floor area, reference plane height, target illuminance applied, percentage of the plane meeting the target, percentage meeting the minimum target, and the recommendation level achieved.
Two conventions need stating explicitly. The reference plane height, commonly taken at 0.85 m above floor level in dwellings. And the exclusion of a border around the room perimeter from the calculation grid, which BS EN 17037 provides for and which changes the percentages materially in small rooms.
Keyed floor plans showing the calculation grid and the room references are worth more than any amount of text. An officer reading a 60-room table without a plan cannot check anything.
Where the scheme includes an overheating assessment, the glazing assumptions have to be consistent between the two. A high transmittance glass that helps the daylight numbers makes the Overheating Risk Assessment harder, and submitting the two with different specifications is an obvious inconsistency.
Reflectance and glazing transmittance assumptions
Internal surface reflectances drive the result more than most people assume, and optimistic values are the easiest way to flatter a scheme.
- Ceiling: commonly 0.7.
- Walls: commonly 0.5.
- Floor: commonly 0.2, sometimes 0.3.
- External ground: commonly 0.2.
Use those or justify a departure. A wall reflectance of 0.8 assumes a brilliant white matt finish maintained for the life of the building, which is not a fair representation of a lived-in flat.
Glazing visible light transmittance should come from the actual product data rather than from a default, and it should be the value for the complete glazing unit including any coating. State the frame factor and the net glazed area, since a slim-profile window and a chunky one with the same structural opening deliver different results. A maintenance factor for dirt accumulation should also be stated, and an assessment with no maintenance factor at all should say so rather than leaving it to be inferred.
Reporting shortfalls honestly
Some rooms will fall short. In a dense urban scheme, some will fall well short, and the guidance itself acknowledges that the recommendations are advisory and that context matters.
The approach that works is to report the shortfall, quantify it, and then make the case. A ground-floor single-aspect bedroom facing a 1.5 m light well in a conservation area has a reason for its performance, and the planning judgement is whether the overall quality of accommodation is acceptable rather than whether every room hits a target.
What fails is selective reporting. An assessment that tables 40 of 56 rooms, or that omits the floor levels that perform worst, destroys its own credibility and invites an independent review commissioned by the authority.
A Daylight and Sunlight Assessment should also carry the sunlight criteria and, where relevant, an Overshadowing Study of amenity space. Councils usually expect a suitably qualified author for this work and professional review is strongly advised.
How officers weigh the two methods together
Expect an officer to look for four things.
Whether the right method has been applied to the right question, with illuminance methods for new internal provision and vertical sky component for effect on neighbours. Whether the inputs are stated fully enough to be checked. Whether every room is reported. And whether the shortfalls are explained in planning terms rather than buried.
Where a scheme performs below the recommendation levels, the argument belongs in the design narrative rather than in the technical appendix, which is the job described in what each section of a design and access statement must do.
As an illustrative example, a scheme of 56 flats on an urban infill site reported climate-based results for every room against the National Annex targets, with a keyed grid plan, stated reflectances at 0.7, 0.5 and 0.2, product transmittance from the window schedule, and a climate file named for the nearest city. Nine ground-floor rooms fell below the targets. The assessment said so, quantified the shortfall, and set the case out in the design statement alongside the dual-aspect provision and the communal amenity. The authority accepted the approach without commissioning its own review.
PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required. Enter your postcode on PlanScope to see which reports your scheme is likely to need.
Frequently asked questions
What are the BS EN 17037 recommendation levels?
Daylight provision is expressed as a target illuminance met over 50 per cent of the reference plane, with a minimum target over 95 per cent of it, for at least half the daylight hours. The minimum level is 300 lux and 100 lux, medium is 500 and 300, high is 750 and 500. The UK National Annex sets lower room-specific targets for dwellings.
Does climate-based modelling replace vertical sky component?
No. The two answer different questions. Illuminance methods assess the daylight a new scheme provides to its own occupants. Vertical sky component and the no-sky line assess the daylight a proposal removes from the windows of existing neighbouring buildings. A full submission usually needs both.
Which weather file should be used?
One representative of the site's location, named in the methodology with its source and reference period. A London file applied to a scheme in Manchester or Newcastle changes the result, and reviewers check this. State the sky model used and the external ground reflectance assumed alongside it.
What reflectance values are reasonable?
Commonly 0.7 for ceilings, 0.5 for walls, 0.2 or 0.3 for floors and 0.2 for external ground. Higher wall values assume a brilliant white matt finish maintained for the life of the building, which is not a fair representation of a lived-in flat. Any departure from the usual values should be justified.
Do I have to report rooms that fail?
Yes, and selectively reporting is the quickest way to lose credibility and invite an independent review commissioned by the authority. Report every habitable room, quantify the shortfall, and make the planning case for why the overall quality of accommodation is acceptable in its context.
Which modelling inputs should be disclosed?
The climate file and its reference period, the sky model, internal and external reflectances, glazing visible light transmittance from product data, frame factor and net glazed area, any maintenance factor, the reference plane height and the perimeter border excluded from the grid, plus the surrounding buildings included in the model.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.