The cost of a refusal: resubmission against appeal
Design out what can be designed out and appeal only what turns on planning judgement. A comparison of fees, deadlines, professional time and the risk of a section 70A refusal to determine.
Whether to resubmit or appeal a planning refusal is a question about the refusal reasons, not about how annoyed you are with the council. A fresh application costs a fee and a round of professional time but lets you change the scheme. An appeal costs no fee to the Planning Inspectorate but takes months and locks you to the drawings that were refused. The rule of thumb that survives contact with reality is this: design out what can be designed out, and appeal only what turns on planning judgement. Everything below is about working out which of those you are holding.
Reading the refusal reasons for what they say
A decision notice gives reasons in a fixed form, usually a policy reference followed by a sentence of harm. The policy reference tells you what was breached. The sentence of harm tells you what the officer thought the consequence was. The second part is the one that matters.
Separate the reasons into three piles.
The first pile is evidence gaps. No ecology survey, no drainage calculations, no measured survey of the existing building. These are not really objections to the scheme. They are objections to the pack.
The second pile is design and layout. Scale, massing, overlooking distances, parking numbers, the position of a bin store. Most of these move.
The third pile is principle. The site is in the Green Belt, the use is unacceptable in that location, the development plan allocates the land for something else. These do not move for a resubmission, because the next scheme runs into the same policy.
Watch for a reason that looks like design but is really principle. "The scale and form of the proposed dwelling would be at odds with the pattern of development" sometimes means a slightly smaller house would be fine, and sometimes means no house at all.
What a fresh application costs
The fee itself is the smaller part. Fees are set by the national fee regulations, were uplifted in December 2023 and have been indexed each April since, so take the figure from the current schedule rather than from a quote you were given last year. The article on how planning fees are indexed each April covers that mechanism, and full application fees by floorspace and site area covers how the band is worked out.
A fee concession for a second application of the same character on the same site has existed in the fee regulations for many years, but the fees regime has been amended repeatedly. Check the current regulations and the authority's own published fee page before you budget on a free second attempt.
The real cost is professional time. Revised drawings, an updated design and access statement, a new location plan, possibly a survey that was missing the first time. On a single dwelling that is usually a few days of work. On a scheme with a technical evidence base it can be most of the original fee again, because the specialists have to revisit their reports against the changed layout.
Against that, a fresh application gets you a decision in eight weeks for a minor scheme or thirteen for a major, a case officer you can talk to, and a chance to pre-apply and agree the fix before you spend the money.
What an appeal costs and how long it takes
There is no fee to the Planning Inspectorate for a planning appeal. That is the single most misunderstood point in this whole decision.
The deadlines are tight and they are jurisdictional. A householder appeal must be lodged within 12 weeks of the decision date. Most other planning appeals must be lodged within six months. Miss the date and there is no appeal, whatever the merits.
| Route | Fee to lodge | Deadline from the decision | Can the scheme change |
|---|---|---|---|
| Fresh application | Yes, per the current fee schedule | None, subject to section 70A | Yes, freely |
| Appeal under section 78 | None | 12 weeks for householder, six months for most others | Only immaterial amendments |
The cost sits in the statement of case. A written representations appeal on a householder scheme can be run on a well-argued statement and the existing drawings. A hearing or an inquiry brings in advocacy, proofs of evidence and sometimes expert witnesses, and that is where appeal costs overtake resubmission costs comfortably.
On timing, the Inspectorate publishes current performance statistics by procedure type. Use those rather than an anecdote, because the figures move with casework volumes.
Costs awards exist but they are not a funding plan. An award is made only where a party has behaved unreasonably and that behaviour caused wasted expense, and it runs in both directions.
Reasons capable of being designed out
Some refusals are fixable, and the fix costs less than the argument.
A refusal for overlooking usually responds to obscure glazing, a rooflight instead of a window, or a one metre setback. A refusal for parking shortfall responds to a layout change or a parking survey that nobody commissioned first time round. A refusal for want of a bat survey responds to a survey, though the emergence survey season runs May to September, so the calendar may decide your programme rather than your budget.
Where the officer's report says what would be acceptable, that is a gift. Build the resubmission to it. Officers rarely write that sentence unless they mean it.
Reasons that are matters of judgement
Harm to the character of an area, less than substantial harm to a heritage asset weighed against public benefits, the acceptability of a dwelling in open countryside. These are planning judgements, and the person who gets to make them afresh is an inspector.
Resubmitting into the same judgement with a marginally different scheme is how applicants spend two fees to collect two refusals. Worse, it hands the authority the ability to decline to determine. Section 70A of the Town and Country Planning Act 1990 lets an authority refuse to entertain a similar application where an appeal has been dismissed, or where a similar application was refused, within the preceding two years. That power exists precisely to stop the cycle.
Running both routes at once
It is legally possible to appeal one refusal and submit a revised application at the same time. It is almost always a poor idea on a small scheme.
The authority is then defending a decision while assessing your replacement, and the two pieces of work are done by the same officer. The revised scheme, if it is better, undermines your own appeal case that the refused scheme was acceptable. And section 70B gives the authority a power to decline to determine applications that overlap with others already under consideration.
Where it does make sense is a large scheme with a long programme, where losing six months matters more than the duplicated fee, and where the revised application is materially different rather than a tweak.
Making the call
Three questions settle most cases.
Can the harm identified in the reason be removed by a change you are willing to make? If yes, resubmit. Does the reason depend on a value judgement about character, heritage or policy balance where a second opinion is worth having? If yes, appeal. Is the reason an evidence gap you can close? If yes, resubmit, because an inspector cannot grant permission on evidence that does not exist.
One more practical point. An appeal decision is published and durable. A dismissal on your site becomes the first thing the next officer reads, and it will be quoted at you for years. A withdrawn application leaves no such trace.
Budget both routes properly before choosing. Set the professional time out alongside the application fee and any survey costs, and compare the total against the delay each route carries. The piece on PlanScope pricing sets out what the drafting side of that budget looks like.
This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.
PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
Does it cost anything to appeal a planning refusal?
There is no fee payable to the Planning Inspectorate for a planning appeal. The cost is the professional time spent preparing the statement of case and, on a hearing or inquiry, advocacy and expert evidence. Costs awards between the parties are possible but only where one side has behaved unreasonably and caused the other wasted expense.
How long do I have to appeal?
A householder appeal must be lodged within 12 weeks of the date on the decision notice. Most other planning appeals must be lodged within six months. These deadlines are jurisdictional, so an appeal submitted late cannot be accepted whatever its merits. Check the current deadline on the appeal service before relying on any summary.
Can I change the scheme on appeal?
Only in immaterial respects. An appeal under section 78 is determined on the scheme that was refused, so an inspector cannot consider a materially different design. Minor amendments that cause no prejudice to anyone who commented may be accepted, but anything that changes the substance of the proposal needs a fresh application instead.
Can the council refuse to deal with a repeat application?
Yes. Section 70A of the Town and Country Planning Act 1990 allows a local planning authority to decline to determine an application that is similar to one refused within the preceding two years, or similar to one where an appeal was dismissed in that period. Section 70B covers applications that overlap with others already under consideration.
Should I appeal and resubmit at the same time?
Rarely on a small scheme. The same officer handles both, a better revised scheme weakens your own appeal case, and section 70B allows the authority to decline to determine overlapping applications. It can make sense on a major scheme with a long programme, where the revised application is materially different rather than a minor adjustment.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.