AI and Planning

Daylight and sunlight results need a model of the site

6 min readBy PlanScope Editorial Team

Daylight results are geometric outputs, not estimates. Here is the survey information a model needs, where the 45 degree check still works and what a draft can prepare.

A daylight and sunlight assessment is a geometric calculation. Vertical sky component, no sky line and annual probable sunlight hours are all derived from a three-dimensional model of the proposal, the existing buildings around it and the windows in them. The daylight assessment model requirement is therefore absolute: without measured geometry there are no results, only estimates dressed up as results. That is the honest limit of what any desk exercise, however well structured, can contribute.

What a draft can do is everything around the calculation, which on a typical submission is most of the document.

What the guidance method involves

The current Building Research Establishment guidance on site layout planning for daylight and sunlight sets out the tests councils apply.

Vertical sky component measures the amount of visible sky at the centre of a window on the outside face of the wall, expressed as a percentage of unobstructed hemisphere. The familiar benchmark is 27 per cent, with a further test comparing the proposed value against 0.8 times the existing value.

No sky line, also called daylight distribution, assesses how much of the floor area of a room can see the sky. It requires the internal layout of the room, which is why it is harder to apply to neighbouring properties than vertical sky component is.

Annual probable sunlight hours measures the proportion of available sunlight hours received at a window across the year and in winter, applied to windows within 90 degrees of due south.

Sunlight to amenity space is assessed separately, usually by testing how much of a garden or open space receives two hours of sun on 21 March.

Each of these is computed from geometry. None can be inferred from a photograph or a street view.

Why geometry cannot be estimated

The sensitivity of the results to small changes is the reason.

Move a window 500 millimetres down a facade and the vertical sky component changes. Add a 1.2 metre balcony above it and the value drops sharply, because the overhang removes the upper part of the visible sky that contributes most. Raise the ground level by 300 millimetres and every section changes.

Published mapping does not carry this information. Building height data is approximate, roof forms are generalised, and window positions are absent entirely. A model built from that data produces numbers that look authoritative and are wrong by margins that matter, because the thresholds are narrow.

There is a professional dimension too. Results are submitted to a council, relied on by neighbours and tested at appeal. An assessment that cannot be traced to survey information is not something a competent assessor would put their name to.

Survey information the model needs

The model needs the following, and gathering it is usually the longest item in the programme.

  • A topographic survey of the application site and the immediate surroundings, with levels to a stated datum
  • Measured elevations of every affected neighbouring facade, with window positions, sizes and cill heights
  • Balconies, overhangs, recesses and any projecting features on those facades
  • Roof forms and heights of surrounding buildings
  • Room uses and internal layouts behind affected windows, where no sky line is to be assessed
  • The proposed scheme geometry at the stage being assessed, including any later design changes

Internal layouts of neighbouring properties are the hardest to obtain and are often unavailable. Where that is so, the assessment states the assumption made, usually a reasonable room depth, and reports vertical sky component as the primary measure. Our note on window mapping and which neighbouring rooms count covers how to decide what to include.

Photogrammetry or a laser survey from the public footway can capture neighbouring facades where access is refused, which it frequently is. Budget for it rather than hoping the neighbour will agree.

And fix the stage at which the model is built. Running the assessment on a massing study and then changing the elevation treatment, the balcony depths or the floor-to-floor height means rerunning it, because each of those changes the geometry the calculation depends on. Assessors would rather model once at the right stage than three times at the wrong ones.

Where the 45 degree check still helps

Many council householder design guides use a 45 degree test, applied in plan and in elevation from the centre of a neighbouring window, as a quick screen for extensions. The published guidance also includes a preliminary section check based on the angle to the top of an obstruction.

These are screening tools and they remain useful. On a small householder extension they are often the only assessment anyone needs, and an officer applying the council guide will reach a view in minutes.

They stop being adequate where the obstruction is large, where the relationship is oblique, where there are balconies involved, or where the council has asked for the full method. Using a 45 degree sketch to answer a question about a seven storey building next to a block of flats will not persuade anyone.

A Daylight and Sunlight Assessment to the full method is the document a council expects for anything above householder scale in a constrained urban setting.

Presenting results an officer can read

The common failing is a 200 page appendix with no narrative.

Lead with a table of affected windows, each identified on a plan, showing the existing value, the proposed value, the ratio and whether the relevant test is met. Group by property and by floor. Then explain the exceptions.

Where a window falls below the benchmark, say by how much, say what the room is used for, and say whether the existing value was already low because of the character of the area. Dense Victorian terraces and inner city blocks frequently start below 27 per cent, and the guidance is explicit that it should be applied flexibly in such settings rather than as a pass mark. A window at 18 per cent falling to 16 is a different proposition from one at 32 falling to 20, and the guidance itself recognises that context matters.

Do not describe a shortfall as compliant. Officers read these documents regularly and the credibility of the whole submission turns on the honesty of the exceptions table. Our explainer on vertical sky component and no sky line sets out what each measure actually shows.

What a draft can and cannot contribute

An AI-assisted draft is useful here, within clear limits.

It can set out the development plan and national policy context, describe the method and the tests, list the neighbouring properties likely to be affected from the site context, set out the survey information required, structure the results tables ready for figures, draft the assumptions and limitations section, and prepare the commentary framework for the exceptions.

It cannot produce vertical sky component values, no sky line areas or sunlight hours, and it should never present an estimate as a result. PlanScope inserts a flag reading TO BE CONFIRMED wherever a site-specific fact is missing, and in a daylight report that covers every numerical output. Our note on closing the flagged gaps in a draft explains how to work through them.

Councils usually expect a suitably qualified author for this report type and professional review is strongly advised, because the judgement about context and the handling of exceptions are matters of experience rather than calculation. The professional review route exists for exactly that step.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Can daylight results be produced without a survey?

No. Vertical sky component, no sky line and annual probable sunlight hours are all geometric outputs from a three-dimensional model of the proposal, surrounding buildings and their windows. Published mapping lacks window positions, accurate heights and roof forms, so a model built from it produces numbers that are wrong by margins that matter.

What is vertical sky component?

The amount of visible sky at the centre of a window measured on the outside face of the wall, expressed as a percentage of an unobstructed hemisphere. The familiar benchmark is 27 per cent, with a further test comparing the proposed value against 0.8 times the existing value for that window.

What survey information does the model need?

A topographic survey with levels to a stated datum, measured elevations of affected neighbouring facades with window positions, sizes and cill heights, balconies and overhangs, roof forms and heights of surrounding buildings, and internal layouts behind affected windows where no sky line is to be assessed.

Is the 45 degree check still useful?

Yes as a screening tool, and on a small householder extension it is often the only assessment needed. It stops being adequate where the obstruction is large, where the relationship is oblique, where balconies are involved, or where the council has asked for the full published method.

What can an AI-assisted draft contribute to a daylight report?

The policy context, the method description, the list of likely affected properties, the survey information schedule, the results table structure, the assumptions and limitations section and the commentary framework. It cannot produce any numerical result, and every figure should be flagged as outstanding until the model is run.

Sources and further reading

daylightsunlightbre 209vertical sky componentai draftingamenity

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in AI and Planning

View all →
AI and Planning6 min read

Where AI drafting saves a householder time, and where not

AI drafting saves hours on the narrative documents in a householder application. It saves nothing on measuring the house or waiting for a survey tied to a season.

Read article →
AI and Planning7 min read

What the guided wizard asks and why each answer matters

Nine steps, from postcode to summary. Each answer changes which reports appear and what the drafts say, so understating a constraint costs more time than the extra report.

Read article →
AI and Planning7 min read

Why local plan policy numbers are the commonest draft error

There is one Framework and hundreds of development plans. Saved policies, supplementary guidance and emerging plans are where draft policy tables go wrong.

Read article →
AI and Planning7 min read

Citing the right Framework edition in a drafted report

A national policy reference is incomplete without its edition. How paragraph numbers from older Frameworks get into drafts, and a five step check before submission.

Read article →
AI and Planning6 min read

Checking a draft's policy references against the plan

A wrong policy reference is a substantive error under section 38(6), not a typo. Here is how to check an adopted plan, its saved policies, the neighbourhood plan and national policy citations before a draft goes out.

Read article →
AI and Planning7 min read

Quality checks to run before a draft reaches a client

A pre-issue routine for planning documents, covering the description of development, figure provenance, policy editions, internal consistency and the validation checklist.

Read article →