What the guided wizard asks and why each answer matters

7 min readBy PlanScope Editorial Team

Nine steps, from postcode to summary. Each answer changes which reports appear and what the drafts say, so understating a constraint costs more time than the extra report.

The PlanScope wizard asks nine sets of questions, and each one narrows the list of reports the system recommends. Location, project, building, work, issues, known constraints, documents, reports, summary. Answering them accurately matters more than answering them quickly, because an understated constraint produces a draft that reads well and misses the document the council will actually ask for.

The planning wizard questions are not a form for the sake of a form. Each answer either changes which reports appear or changes what the drafts say.

Location, and why the postcode comes first

Everything begins with where the site is. You can enter a postcode or address, upload a site photograph so the coordinates are read from it where the image carries them, or upload your existing planning documents.

Once the location is fixed, the property picker lets you confirm the building in one of three ways: Auto, which selects the footprint it believes is yours, Pin, which drops a marker, and Draw, which lets you trace the footprint yourself over satellite imagery. Street level imagery and building footprints from open mapping data are available within 500 metres.

Take the time to get this right. The point of the exercise is to fix a precise location, because the automatic constraint check that follows is spatial. It queries Environment Agency flood data, Historic England listed buildings and conservation areas, and Natural England SSSI layers against the point you confirm. A pin dropped on the wrong side of a boundary gives you the wrong answer.

If the pin lands on a neighbouring plot, the flood zone and conservation area findings may be wrong in both directions, and you will not know it.

Property type and work type

Two drop-downs do a surprising amount of work. Property type offers house, flat or apartment, commercial, land, mixed use and other. Work type offers extension, conversion, new build, change of use, demolition, renovation or refurbishment, and other.

The pairing drives the report list. A new build triggers a different set from an extension, because new dwellings bring biodiversity net gain, energy and drainage questions that an extension usually does not. A change of use brings transport and waste questions instead.

Work type Reports the engine adds
Extension Planning Statement and Design and Access Statement as the base set
New build Biodiversity net gain, energy, sustainability, construction management, drainage
Change of use Transport assessment and waste management strategy
Commercial project Retail impact, economic impact and travel plan

If your project is genuinely two things, a conversion with a small extension for example, choose the one that describes the main operation and explain the rest in the project description. The description is read by the drafting step, so a clear sentence there improves every document that follows.

Known issues, and the cost of understating them

The issues step asks about trees nearby, listed building, conservation area, flood risk, neighbour concerns, noise issues, access or highways, and land contamination. These are the answers that change the report list most.

Trees add an arboricultural assessment and a landscape strategy. Heritage answers add a heritage statement, an archaeological desk-based assessment and a townscape and visual assessment. Flood risk adds a flood risk assessment, a drainage strategy and a sequential test. Noise adds a noise assessment. Neighbour concerns add a statement of community involvement and an overshadowing study. Access issues add a transport assessment and a parking survey.

There is an understandable temptation to leave boxes unticked to keep the list short. It is a false economy. The council's validation list does not shrink because you did not mention the oak in next door's garden, and an application returned as invalid costs more time than the extra report would have.

The opposite error is also worth avoiding. Ticking every box produces a long list and a wider set of drafts than the project needs, and some of them will sit half-finished.

Answer what is true on site. Where you are unsure whether the building is listed or the site is in a conservation area, the automatic check will tell you, and you can correct the answer.

Documents and photographs

The upload step accepts PDF, JPG, PNG, DOC, DOCX and DWG files, and the guided flow reads PDFs, images and Word documents. Existing drawings, a measured survey, a previous decision notice, a pre-application response: all of these give the drafting step facts it would otherwise have to flag as missing.

That flagging is deliberate. Where a site-specific fact is not available, the draft inserts a [TO BE CONFIRMED] marker rather than inventing a figure. Every one of those markers is a job for you or your professional, and the fewer you leave the more useful the draft is. Our note on closing flagged gaps in a draft sets out how to work through them.

Photographs earn their place. A photograph of the rear elevation, the boundary treatment and any tree within influencing distance answers questions that a plan cannot.

The reports step and the review panel

The reports step shows the recommendation, the credit total, and a panel marking each report as professional review legally required or recommended. That panel is the honest part of the exercise.

Some reports cannot be produced by a drafting tool and should not be. A protected species survey needs a licensed ecologist under the Wildlife and Countryside Act 1981 and the Conservation of Habitats and Species Regulations 2017. A biodiversity net gain assessment needs the statutory metric completed by a competent person under the Environment Act 2021 regime. An Environmental Statement must be prepared by competent experts under the EIA Regulations 2017. A fire statement at Planning Gateway One needs fire engineering competence under the Building Safety Act 2022 framework. For those, a draft is a starting point for the professional rather than a substitute for them, and the professional directory is the route to a reviewer who can sign off.

Where a report is marked recommended rather than required, councils usually expect a suitably qualified author, and professional review before submission is strongly advised.

What the thresholds are doing

Behind the questions sit numeric triggers. Major development at ten or more units, 1,000 m² or more of floorspace, or 0.5 hectares or more. A transport assessment at 50 or more units or 2,500 m². A flood risk assessment in Flood Zone 2 or 3 or on a site of one hectare or more. An affordable housing statement at ten or more units. A statement of community involvement at 50 or more units.

Those are the thresholds PlanScope uses to flag reports. They are a guide, and your council's own validation list and national policy thresholds take precedence over them. Where the two differ, follow the council.

A householder extension sits well below all of them, which is why the base set for a domestic project is short.

After the summary

The summary step is the last chance to correct an answer before generation. Read the project description and the constraint findings back, because the drafts take them as given.

Generation produces Markdown drafts you can export as PDF on every tier, and edit, regenerate section by section, save and version on the paid tiers. The guided flow needs an account, so create one before you start if you want to keep the work. One report is free, individual reports are £50 each, and the Professional tier at £150 a month or £600 a year removes PlanScope branding, adds your own logo and gives unlimited reports: the detail is on the pricing page.

Then read the drafts properly. A draft that cites a policy you have not checked, or that leaves a consultee question unanswered, is not ready, and our note on when a draft must flag a consultee rather than answer for it explains where that line falls.

Answer the nine steps as if a planning officer were reading your answers. Because in effect, they will be.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required. This is general guidance, not legal advice; check the position with your local planning authority before relying on it.

Frequently asked questions

Why does the wizard start with a postcode?

Because the automatic constraint check is spatial. Once you confirm the building footprint, the system queries Environment Agency flood data, Historic England listed buildings and conservation areas, and Natural England SSSI layers against that location. A pin dropped on a neighbouring plot can return the wrong flood zone and the wrong heritage designation.

Should I tick every known issue to be safe?

No. Ticking everything produces a longer report list than the project needs and a wider set of drafts, some of which will sit half-finished. Understating an issue is worse, because the council's validation list does not shrink to match your answers. Answer what is true on site and let the automatic check correct you.

What does a TO BE CONFIRMED marker in a draft mean?

It means a site-specific fact was not available, so the draft flagged the gap rather than inventing a figure. Each marker is a task for you or your professional: a measurement, a survey result, a policy reference to verify. Uploading existing drawings, surveys and decision notices before generation reduces how many appear.

Which reports need a qualified professional?

A protected species survey needs a licensed ecologist, a biodiversity net gain assessment needs the statutory metric completed by a competent person, an Environmental Statement must be prepared by competent experts under the EIA Regulations 2017, and a fire statement needs fire engineering competence. For those, a draft is a starting point for the professional rather than a substitute.

Do the thresholds in the wizard override my council's requirements?

No. The thresholds PlanScope uses to flag reports, such as major development at ten units or 1,000 m², are a guide. Your council's own validation list and national policy thresholds take precedence, and where the two differ you should follow the council. Download the authority's current local list before you submit.

Sources and further reading

planscopeguided wizardai draftingconstraintshouseholderreport recommendations

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in AI and Planning

View all →
AI and Planning6 min read

Where AI drafting saves a householder time, and where not

AI drafting saves hours on the narrative documents in a householder application. It saves nothing on measuring the house or waiting for a survey tied to a season.

Read article →
AI and Planning7 min read

Why local plan policy numbers are the commonest draft error

There is one Framework and hundreds of development plans. Saved policies, supplementary guidance and emerging plans are where draft policy tables go wrong.

Read article →
AI and Planning7 min read

Citing the right Framework edition in a drafted report

A national policy reference is incomplete without its edition. How paragraph numbers from older Frameworks get into drafts, and a five step check before submission.

Read article →
AI and Planning6 min read

Checking a draft's policy references against the plan

A wrong policy reference is a substantive error under section 38(6), not a typo. Here is how to check an adopted plan, its saved policies, the neighbourhood plan and national policy citations before a draft goes out.

Read article →
AI and Planning7 min read

Quality checks to run before a draft reaches a client

A pre-issue routine for planning documents, covering the description of development, figure provenance, policy editions, internal consistency and the validation checklist.

Read article →
AI and Planning6 min read

Daylight and sunlight results need a model of the site

Daylight results are geometric outputs, not estimates. Here is the survey information a model needs, where the 45 degree check still works and what a draft can prepare.

Read article →