AI and Planning

Describing AI assistance in a fee proposal to a client

6 min readBy PlanScope Editorial Team

Clients are not troubled by AI-assisted drafting. They are troubled by not knowing who is responsible. Wording for the scope, exclusions and fee basis in a planning fee proposal.

Say in the fee proposal what the client is paying you for, and say where the drafting sits inside it. An ai assistance fee proposal that hides the method invites the awkward question later. One that describes it plainly, alongside the review you carry out and the parts that stay excluded, usually ends the conversation in a sentence.

Clients are not troubled by the method. They are troubled by not knowing who is responsible for what.

Why the wording earns its place

Three audiences read a fee proposal. The client, who wants to know the price and the deliverable. The client's lender or funder, who may ask who prepared the supporting documents. And, later, a case officer or an inspector, if the document's provenance ever comes up at a hearing.

A sentence that covers the method protects all three readings. It also protects you, because a proposal that is silent on the point can be read as implying that every word was drafted from scratch by the named author.

What to say about the process

Keep it factual and short. Describe the sequence rather than the technology.

A workable form of words: the supporting statements are prepared using structured drafting tools against the adopted development plan and national policy, then checked, edited and completed by this practice using the site information, the survey data and our own professional judgement on the matters that require it.

That tells the client three things. The structure comes from a tool. The site specific content comes from evidence. The judgement comes from a person whose name is on the document.

Avoid two temptations. Do not overclaim by describing the tool as doing policy analysis it cannot do. And do not undersell by calling it a template, because a client who later sees a cited policy and a flagged assumption will wonder what else you were vague about.

What to say about review and sign-off

This is the part clients read twice. Be specific about who does what.

  • the named person in your practice who reviews and issues the document
  • the scope of that review, for example policy coverage, factual accuracy against the drawings and the site survey, and internal consistency
  • where an external specialist is required by law or by the council, and that their report is a separate commission

Where the project needs a report that a licensed or competent professional must prepare, say so in the proposal rather than in a later variation. A Biodiversity Net Gain Assessment under the Environment Act 2021 regime expects the statutory metric to be completed by a competent person, with the biodiversity gain plan approved by the local planning authority. A Protected Species Survey needs a suitably licensed ecologist under the Wildlife and Countryside Act 1981 and the Conservation of Habitats and Species Regulations 2017. An Environmental Statement must be prepared by competent experts under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017. An AI-assisted draft of any of these is a starting point for that professional, never a substitute.

PlanScope's own professional directory exists for that step, and you can send a draft for review and sign-off through it. See the professional directory for how the review and sign-off route works.

Scope, exclusions and assumptions

The exclusions list is where disputes are prevented. For a planning submission supported by drafted statements, the usual exclusions are:

  1. Measured survey, topographical survey and any site investigation.
  2. Specialist reports requiring a licensed or competent author.
  3. Validation of the council's local list requirements after submission, unless separately instructed.
  4. Negotiation of conditions and obligations after a resolution to grant.
  5. Appeal work.

Assumptions matter as much. State that the statements rely on the drawings and site data supplied at a stated revision, and that material changes to either will need the documents revisiting. Drafts flag missing facts with a marker rather than inventing them, which is a safeguard rather than a defect, and the proposal should say that those markers get resolved before submission.

A worked proposal paragraph

Illustrative wording for the scope of services section of a fee proposal:

"We will prepare the Planning Statement and Design and Access Statement for the application. These documents are drafted with structured AI-assisted tools against the adopted local plan and the National Planning Policy Framework, then reviewed, edited and issued by [the named planner], who takes responsibility for the content. Site specific inputs come from your survey and from our site visit. Where the council requires a report that must be prepared by a licensed or competent professional, we will identify it and obtain a fee for that separate commission. Reports should be reviewed before submission and we do not guarantee planning approval."

Adapt it to your practice. The elements to keep are the method, the named reviewer, the source of site facts, the carve-out for specialist authors and the honest statement about outcome.

Pricing the review rather than the draft

Here is the commercial consequence most practices work out late. Once drafting time falls, the fee cannot sensibly be built on the hours spent typing. Price the judgement.

Three approaches that hold up:

  • a fixed fee per document, with the review and issue explicitly included
  • a fixed fee for the submission pack, with a schedule of what is in it
  • a time charge for the policy and negotiation work, with documents at fixed prices

Clients compare your fee against the cost of doing it another way, so it helps to be open about the tooling cost. PlanScope's published prices are one free report, £50 per report on Pay Per Report, and £150 per month or £600 per year on Professional, which removes branding and adds your own logo. See PlanScope pricing for what each tier includes. Quoting that alongside your own fee makes the value of the review visible rather than hidden, which is usually the stronger position.

Do not discount the review. It is the part that carries your professional indemnity exposure.

The questions clients ask

Four come up again and again, and short answers work better than long ones.

Who is responsible if the document is wrong. You are, as the issuing practice, in the same way as for any document you sign.

Will the council know. The council assesses the content against policy and does not ask how a statement was typed. Content that is accurate, cited and specific to the site reads as competent regardless of method.

Does this mean I do not need surveys. No. A draft cannot measure a site, count traffic or identify a bat roost.

Can the fee come down if a tool did the drafting. Sometimes, which is why the fixed fee per document approach is cleaner than an hourly rate.

Our note on explaining an AI-assisted draft to a client or a committee covers the verbal version of this conversation, and the limits of what a draft can establish about a site are set out in our piece on where site judgement cannot be drafted.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Do I have to tell a client that a planning statement was AI-assisted?

No professional rule compels a particular form of words, but a proposal that is silent on method can imply something that is not true. A short factual sentence in the scope of services costs nothing and prevents the conversation happening later, when the document is already with the council and the client feels misled.

Who is responsible for the content of an AI-assisted report?

The practice that reviews and issues it. Naming the reviewer in the fee proposal makes that explicit, and it is the same position as for any document a practice signs. Where a report must by law be prepared by a licensed or competent professional, responsibility for that report sits with that professional.

How should the fee be structured if drafting takes less time?

Price the review and the judgement rather than the typing. A fixed fee per document, or a fixed fee for the submission pack with a schedule of contents, holds up better than an hourly rate that shrinks as drafting speeds up. Keep the review explicitly inside the fee rather than as an extra.

What should the exclusions list cover?

Measured and topographical survey, site investigation, any specialist report needing a licensed or competent author, post-submission work on local list queries, negotiation of conditions and obligations after a resolution to grant, and appeal work. State the drawing revision the statements rely on, so that later design changes trigger a revisit rather than a dispute.

Will a council treat an AI-assisted statement differently?

Councils assess the content against the development plan and material considerations. A statement that cites the right policies, deals with the site's constraints and matches the drawings is judged on that basis. Vague, generic or internally inconsistent content is penalised whoever or whatever produced it.

Sources and further reading

ai and planningfee proposalsscope of servicesprofessional reviewarchitectsplanning consultants

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in AI and Planning

View all →
AI and Planning7 min read

Flagged gaps in a draft and how to close them properly

An AI draft that stops and flags a missing site fact is safer than one that estimates it. How to close each kind of flag from the source a council would check.

Read article →
AI and Planning6 min read

When a draft must flag a consultee rather than answer for it

A supporting statement that asserts the Environment Agency will not object has answered a question it has no standing to answer. Name the consultee, name the trigger, state the evidence, then stop.

Read article →
AI and Planning7 min read

Drafted construction management plans and the highway input

A drafted construction management plan gets you a usable framework. The routing, the swept paths and the highway licences are decided by people with local knowledge you cannot draft around.

Read article →
AI and Planning7 min read

National development management policies: status now

The Levelling-up and Regeneration Act 2023 created national development management policies but none have been designated. How to cite policy now and structure for the change.

Read article →
AI and Planning6 min read

What a draft can say about five year housing land supply

A draft can set out the five year housing land supply test and structure a site-by-site critique. It cannot know an authority's current position, and a plausible wrong figure costs more than a blank one.

Read article →
AI and Planning7 min read

Drafted transport statements and the trip rate question

An AI-assisted draft can assemble the policy framework and the site description for a transport statement. It cannot extract trip rates from a licensed database or make the site selection judgements that justify them.

Read article →