AI and Planning

Drafted condition wording and why authorities rewrite it

7 min readBy PlanScope Editorial Team

Offer a condition schedule tied to drawing numbers and reasons. Which phrases get rewritten, and why the statutory agreement rule matters to consultants.

Suggested planning conditions get rewritten for three reasons, and only one of them is about quality. Authorities keep condition libraries and house styles, their legal teams have views about wording, and a condition has to be enforceable by someone who was not involved in the negotiation. Offer wording anyway. A condition schedule appended to the supporting statement, with each condition tied to a drawing number and a reason, shortens the officer's work and keeps you out of the conditions you cannot comply with.

Why applicants suggest conditions at all

Two practical reasons and one tactical one.

A condition can resolve an objection without changing the scheme. Where an officer is uneasy about hours, lighting or materials, the answer is often a condition rather than a redesign, and saying so early moves the conversation on.

A condition also defines your obligations. Vague wording that nobody reads at the decision stage becomes a problem at discharge, when the building control programme depends on a submission the condition does not clearly describe.

The tactical reason is anchoring. The first draft of a condition tends to survive in substance, so the party who writes it first has an advantage.

The six tests

National guidance is clear that conditions should only be imposed where they are necessary, relevant to planning, relevant to the development to be permitted, enforceable, precise and reasonable in all other respects. All six, not most of them.

Necessary is the test that does most work. If permission could reasonably be granted without the condition, it fails, which is why conditions restating a statutory requirement or duplicating another regime are objectionable. A condition requiring compliance with building regulations, or requiring a licence that another body issues, adds nothing and should be resisted.

Enforceable and precise usually fail together. An officer has to be able to decide, standing on site, whether the condition is being complied with. If two reasonable people could disagree, the condition is imprecise, and if nobody can tell, it is unenforceable.

Relevance to the development to be permitted is the one that catches offers from applicants. A generous offer unconnected to the scheme, such as works to an unrelated part of a site, cannot be imposed as a condition and belongs in an obligation if it belongs anywhere.

Wording that cannot be enforced

Some phrases are near-automatic rewrites.

  • "Where practicable" or "where reasonably possible", which hand the decision to the person being regulated.
  • "To the satisfaction of the council", which fixes no standard and no mechanism.
  • "Unless otherwise agreed in writing", which national guidance advises against, because varying a condition has a statutory route and a condition should not create an informal one.
  • "Appropriate", "adequate" and "suitable" used as the standard, with nothing to measure against.
  • A reference to industry guidance without naming the document, the edition and the clause.
  • A requirement on a third party, or on land outside the applicant's control, with no realistic prospect of delivery.

The replacement is nearly always a measurable thing: a document by title and date, a numbered drawing and revision, a figure with a unit, a date or a trigger event, and a named party who has to do it.

Conditions that must be agreed before they are imposed

Section 100ZA of the Town and Country Planning Act 1990 changed the dynamics here, and consultants who do not use it are giving away ground.

Where an authority wants to impose a condition requiring something to be done or approved before development starts, it cannot do so without the applicant's written agreement, except where it has followed the prescribed procedure of serving notice of the proposed condition and allowing the applicant a period to respond. The procedure and the period are set out in regulations made in 2018, so check the current wording and timescale before relying on the detail.

Use it properly rather than as an obstruction. Most of these conditions are reasonable, and agreeing them promptly keeps goodwill. The ones to push back on are those requiring a submission that cannot realistically precede the start on site, such as a material sample that depends on a specialist order, or a survey that can only be done once the site is cleared. Ask for those to be triggered before the relevant works rather than before any works, which is usually accepted and costs the authority nothing.

An illustrative materials condition

Illustrative example, using a common case.

The weak version: "The materials used shall match those of the existing building and shall be agreed in writing with the local planning authority prior to the start of works."

It fails on precision, because matching is a judgement. It fails on enforceability, because no standard is set. And it creates an approval step with no process attached.

The stronger version: "No external walling or roofing materials shall be installed until a schedule of materials, with product names, references and finishes, together with a sample panel of facing brickwork not less than 1 m by 1 m constructed on site showing the proposed brick, bond, mortar colour and joint profile, has been submitted to and approved in writing by the local planning authority. The development shall then be carried out in accordance with the approved schedule and panel. Reason: to secure an appearance appropriate to the character of the area, in accordance with policy [number] of the [plan name]."

It names the trigger, the deliverable, the standard, the approval mechanism and the reason. The figures illustrate the structure rather than a fixed requirement. An officer can copy it into the decision notice with a policy reference and move on.

Giving the officer wording they can use

Format matters more than people expect. Put the schedule in a table or a numbered list at the end of the supporting document rather than scattering suggestions through the text, and give each condition a short heading, the wording, and the reason with a policy reference.

Keep the list honest. Twelve offered conditions on a householder application reads as padding. Three or four that deal with the real issues reads as competence.

Where a draft has been generated with assistance, condition wording is the section to check hardest, because this is exactly where a drafted document produces plausible text that will not survive a legal read. A drafting tool knows the shape of a condition. It does not know whether your authority has a standing condition for the same thing, or that the policy number was superseded, which is the division described in what drafts get right about structure and wrong about evidence. A planning statement is the natural home for the schedule, and explaining the suggested conditions to a client is its own task, covered in explaining an AI-assisted draft to a client or a committee.

Reading the draft decision notice

Ask for it. Many officers will share a draft list before issue, and it is far easier to fix a condition then than afterwards.

Check five things. The approved plans list, with every drawing number and revision, because an omitted drawing creates a dispute about what was permitted. The trigger of each condition, especially anything required before any works rather than before the relevant works. The compliance period for anything with a deadline. Whether any condition duplicates another regime or restates a statutory duty. And whether a reason is given for each one, since authorities are required to state their reasons.

If something is wrong after issue, the routes are a section 73 application to vary or remove the condition, or a section 96A application for a non-material amendment, both of which cost money and time. For technical conditions a specialist has to discharge, the professional directory is the route to someone who can prepare and sign that submission.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required.

Frequently asked questions

What are the six tests for a planning condition?

National guidance requires conditions to be necessary, relevant to planning, relevant to the development to be permitted, enforceable, precise and reasonable in all other respects. All six have to be met. Necessity does most of the work: if permission could reasonably be granted without the condition, it should not be imposed.

Why is unless otherwise agreed in writing a problem?

Because varying a condition has a statutory route through a section 73 application, and that phrase creates an informal alternative with no process, no publicity and no record. National guidance advises against it. The same objection applies to where practicable and to the satisfaction of the council, which set no measurable standard.

Can a council impose a condition requiring work before development starts?

Only with the applicant's written agreement, or after following the prescribed procedure of serving notice of the proposed condition and allowing a period to respond, under section 100ZA of the Town and Country Planning Act 1990. The procedure and timescale are set out in regulations made in 2018, so check the current detail.

How many conditions should an applicant suggest?

Three or four that deal with the real issues, presented as a schedule with wording and a reason for each, tied to drawing numbers. Twelve suggestions on a householder application reads as padding and invites the officer to ignore the lot. The first draft of a condition tends to survive in substance.

What should I check on a draft decision notice?

The approved plans list with every drawing number and revision, the trigger for each condition, compliance periods, whether any condition duplicates another regime or restates a statutory duty, and whether a reason is stated for each one. Fixing a condition before issue is far easier than a later section 73 application.

Sources and further reading

planning conditionsdecision noticeplanning consultantai draftingsection 73wording

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in AI and Planning

View all →
AI and Planning7 min read

Drafted construction management plans and the highway input

A drafted construction management plan gets you a usable framework. The routing, the swept paths and the highway licences are decided by people with local knowledge you cannot draft around.

Read article →
AI and Planning7 min read

National development management policies: status now

The Levelling-up and Regeneration Act 2023 created national development management policies but none have been designated. How to cite policy now and structure for the change.

Read article →
AI and Planning6 min read

What a draft can say about five year housing land supply

A draft can set out the five year housing land supply test and structure a site-by-site critique. It cannot know an authority's current position, and a plausible wrong figure costs more than a blank one.

Read article →
AI and Planning7 min read

Drafted transport statements and the trip rate question

An AI-assisted draft can assemble the policy framework and the site description for a transport statement. It cannot extract trip rates from a licensed database or make the site selection judgements that justify them.

Read article →
AI and Planning7 min read

Reworking an England draft for a Welsh application

Swapping the policy names is the smallest part of converting an England drafted statement for Wales. Different permitted development order, different use classes, no mandatory biodiversity net gain and a SuDS approval body.

Read article →
AI and Planning7 min read

Drafted reports and the public sector equality duty

No document an applicant submits discharges the public sector equality duty. Your job is to give the authority the facts it needs to do its own assessment.

Read article →