Which Reports Do I Need

Which reports an equestrian use in the Green Belt needs

7 min readBy PlanScope Editorial Team

Keeping horses is not agriculture, so none of the shortcuts open to a working farm apply. Here is the report pack a Green Belt equestrian application usually needs, and why the pack is larger than owners expect.

Keeping horses on Green Belt land almost always needs planning permission, and the report pack is usually larger than owners expect. The core documents are a planning statement that addresses Green Belt policy directly, a landscape and visual appraisal, a drainage note for any hard surface, and a lighting assessment if you want floodlights. Ecology and access evidence follow depending on the site. The reason the pack is not smaller is that equestrian use sits outside the agricultural exemptions, so none of the shortcuts available to a working farm apply.

Start from the use, not the buildings. Get that wrong and the rest of the application answers the wrong question.

Whether keeping horses counts as agriculture

Section 336 of the Town and Country Planning Act 1990 defines agriculture to include the use of land as grazing land. That has produced a long-standing distinction that catches people out. Land grazed by horses, where the animals are simply eating the grass, can be agricultural. Keeping horses for riding, exercise, training or livery is not, because the land is being used for the horses rather than for the grass.

In practice the line is crossed by the paraphernalia. Jumps in the field, a field shelter used for stabling rather than shelter, feed brought in because the grazing cannot sustain the animals, a manege, hardstanding, a horsebox parked permanently: each pushes the use towards recreation. A change from agricultural grazing to equestrian keeping is a material change of use and needs permission.

Livery is a further step. Taking horses belonging to other people, for payment, is a business. Depending on scale and what else happens on the holding, an authority may treat it as a sui generis use rather than a variant of private horse keeping, and it will ask about traffic, hours and staff.

The agricultural permitted development rights in Part 6 of Schedule 2 to the General Permitted Development Order 2015 do not extend to equestrian buildings. A stable block put up under a Part 6 prior notification, on the basis that it is an agricultural building, is vulnerable to enforcement.

Green Belt policy and what counts as appropriate

The Green Belt chapter of the National Planning Policy Framework, in the edition published on 17 August 2026, treats the construction of new buildings as inappropriate development subject to a closed list of exceptions. One of those exceptions covers facilities for outdoor sport and outdoor recreation, provided the facilities preserve the openness of the Green Belt and do not conflict with the purposes of including land within it. Verify the current policy reference at the time you write, because the Framework was reorganised in August 2026 and older citations no longer match.

Equestrian use is normally accepted as outdoor sport and recreation. That does not mean the buildings are automatically acceptable. The exception is conditional on preserving openness, so the assessment turns on the scale, height, footprint and grouping of what you propose. A single low field shelter in the corner of a paddock reads very differently from a courtyard of twelve boxes, a hay barn, a horsebox hardstanding and a floodlit arena.

Engineering operations are treated separately and are not inappropriate where they preserve openness, which is the route a manege usually takes. Where the works cannot preserve openness, you are into very special circumstances, and personal need rarely clears that bar on its own.

A practical point that saves argument later. Draw the whole holding, show every existing structure, and describe the cumulative effect. Authorities assess openness across the site, not building by building, and a proposal that ignores three existing shelters invites a refusal on cumulative impact.

Stables, hardstanding and manege construction

Stables need a drainage solution for washdown water and muck storage that does not rely on the field. Where there is no mains foul connection, set out the storage and disposal arrangement and how it avoids pollution of a watercourse.

A manege is an engineering operation with three planning issues. The surface, usually a sand and fibre or waxed composition, is impermeable to a degree that depends on the construction, so the drainage design has to be shown rather than asserted. The retaining kickboards and fencing add apparent bulk, especially on sloping ground where one side stands proud. And the cut and fill needed to get a level platform on a sloping paddock can change ground levels enough to affect openness in its own right.

Show existing and proposed levels on a section. An arena that looks flush in plan and sits a metre above the adjoining field in section is the commonest reason these applications are refused on landscape grounds. A Drainage Strategy covering the arena base, the perimeter drainage and the discharge point is usually expected, and on a site near a watercourse it will be read closely.

Floodlighting and the evidence it needs

Floodlighting is the single most contentious element of an equestrian application in open countryside. Dark rural areas fall into the most sensitive environmental zones in the Institution of Lighting Professionals guidance on obtrusive light, which sets tighter limits on sky glow, light into windows and luminaire intensity than a suburban setting.

A usable Lighting Assessment gives the environmental zone, the luminaire specification, mounting heights, aiming angles, an isolux plot showing spill at the boundary, and the proposed hours of operation. Expect a condition limiting use to defined hours and requiring the lights off outside them. Expect also to be asked about bats, because lighting a previously dark corridor is an ecological effect as well as an amenity one.

If lighting is not essential, leave it out of the first application. Adding it later as a separate application is often easier than defending it alongside everything else.

Access, parking and horsebox movements

Highway authorities care about three things here: the visibility available at the existing field gate, whether a horsebox or a trailer can turn within the site so it leaves in forward gear, and where vehicles park when several people ride at once.

Private use of a few horses rarely generates enough movements to need a transport assessment. A short Transport Statement covering the access geometry, visibility splays and on-site turning is usually proportionate, and a livery or a riding school will need more than that. Widening a field access onto a classified road is itself development and may need a separate agreement with the highway authority.

Landscape, ecology and soils evidence

Green Belt openness and landscape character are different tests, and an application on Green Belt land in or near a National Landscape has to answer both. A proportionate landscape appraisal, or a full Landscape and Visual Impact Assessment on a prominent site, should identify the receptors, show views from public rights of way, and be honest about winter visibility when hedges are bare.

Ecology usually means a preliminary appraisal of the paddocks and any building to be converted or demolished, with further survey only if something is found. Where the paddocks are improved grassland, biodiversity net gain may still be engaged depending on the extent of habitat lost to hardstanding, so check the exemptions early.

Where the land is better quality agricultural land, expect a question about the loss of best and most versatile soils. An Agricultural Land Classification survey answers it properly, and a desk review of published grade data may be enough on a small site.

What to submit

For a private equestrian use of modest scale in the Green Belt, a realistic pack is a planning statement addressing the Green Belt test and the use change, a site plan showing the whole holding with existing structures, existing and proposed levels, a drainage note for the arena and the stables, a landscape appraisal with viewpoints, a preliminary ecological appraisal, and a lighting assessment only if lights are proposed.

Talk to the case officer before you submit. Ask two questions: does the authority accept the use as outdoor sport and recreation, and what level of landscape evidence does it want for this site. The answers will tell you whether you are writing a four document application or a ten document one.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required.

Frequently asked questions

Do I need planning permission to keep horses on my paddock?

Usually yes. Grazing land can be agricultural, but keeping horses for riding, exercise, training or livery is a material change of use because the land is used for the animals rather than for the grass. Jumps, a field shelter used as stabling, imported feed, hardstanding and a manege all push the use across the line. A lawful development certificate is the only formal way to confirm an existing use is lawful.

Are stables inappropriate development in the Green Belt?

Not automatically. The Green Belt chapter of the National Planning Policy Framework includes an exception for facilities for outdoor sport and outdoor recreation, provided they preserve openness and do not conflict with Green Belt purposes. Equestrian use normally falls within that exception, but the scale, height, footprint and grouping of buildings decide whether openness is preserved. Cumulative effect across the whole holding is assessed.

Can I build stables under agricultural permitted development?

No. The agricultural rights in Part 6 of Schedule 2 to the General Permitted Development Order 2015 apply to agricultural use, and equestrian keeping is not agriculture. A stable block erected under a Part 6 prior notification on the basis that it is an agricultural building is exposed to enforcement action. Apply for planning permission for equestrian buildings instead.

What does a manege application need to show?

Existing and proposed ground levels on a section, the surface construction, the perimeter drainage and the discharge point, the height of kickboards and fencing, and the cut and fill needed to form the platform. An arena that appears flush in plan but stands proud in section is the most common reason for refusal on landscape grounds. A drainage strategy is normally expected.

Will floodlighting for an arena be approved?

It is the most contested element and is never automatic. Dark rural areas sit in the most sensitive environmental zones in the Institution of Lighting Professionals guidance on obtrusive light, so the limits on sky glow and spill are tight. Submit luminaire specifications, mounting heights, aiming angles, an isolux plot at the boundary and proposed hours. Expect a condition limiting operating hours.

Sources and further reading

green beltequestrianstableschange of userural planninglighting

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Which Reports Do I Need

View all →
Which Reports Do I Need7 min read

Reports for a rooftop pool on a flat conversion

A rooftop pool on a converted block turns on three pieces of evidence: the weight of water on the existing structure, the noise of wet plant, and what the enclosure does to the roofline.

Read article →
Which Reports Do I Need7 min read

Reports for a sand and gravel extension of six hectares

A six hectare gravel extension is decided by the mineral planning authority, needs an EIA screening opinion, and turns on hydrogeology and restoration rather than on blasting.

Read article →
Which Reports Do I Need6 min read

Reports for a traveller site with four pitches

A four pitch traveller site is a minor application with a major policy test. Need evidence, pitch separation and flood vulnerability decide most of these cases.

Read article →
Which Reports Do I Need7 min read

Reports for a micro hydro scheme on a weir

Micro hydro at a weir needs planning permission plus abstraction, impoundment and flood risk permits. The fish pass is often the costliest item, and it has to be settled before the drawings.

Read article →
Which Reports Do I Need7 min read

Reports for a student accommodation scheme of 200 beds

A 200 bed student scheme is a major application with two documents that have no equivalent on a standard residential pack: the institutional need case and the student management plan.

Read article →
Which Reports Do I Need7 min read

Reports needed for a church hall replacement

Rebuilding a church hall means answering three questions at once: the community facility replacement test, the setting of the adjoining listed church, and what lies under a churchyard.

Read article →