Planning Process

Fee exemptions for works to help a disabled person

7 min readBy PlanScope Editorial Team

The fee regulations exempt applications made solely for disabled access or facilities, at a home or a public building. The word that decides most cases is solely.

There is no planning application fee for works carried out solely to help a disabled person get into, or move around, their own home. The planning fee exemption for disabled adaptation sits in the Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits) (England) Regulations 2012, as amended, and it covers two distinct situations: alterations or extensions to a dwellinghouse, or works in its curtilage, carried out to provide access for a disabled person who lives there or proposes to live there, or to provide facilities for that person's greater safety, health or comfort; and works to a building to which the public are admitted, carried out to provide or improve disabled access.

The word that decides most cases is "solely". The exemption applies where the application relates only to those works. Fold a new kitchen or a second bedroom into the same application and the authority will charge the full fee on the whole thing.

What counts as qualifying work

The first limb is about the home of a disabled person. Ramps, a level threshold, widened doorways, a through-floor lift enclosure, a ground-floor wet room, a single-storey extension containing a bedroom and bathroom for a disabled resident, a hardstanding and dropped access to allow a wheelchair-accessible vehicle to park, a hoist gantry over an entrance. All of these have been accepted as qualifying work by authorities where the link to the resident's needs is evidenced.

The second limb is about buildings the public use. A ramped entrance to a village hall, a platform lift into a shop, an accessible WC in a church, a handrail and level landing at a surgery entrance. Here the test is about access for disabled people generally rather than a named individual, which makes the evidence simpler.

Two things fall outside. Work that is for the general benefit of the household rather than the disabled person, and work where the disabled person neither lives at the property nor intends to. The second catches purchasers who adapt a house before moving in and forget to say so in writing.

The evidence an authority asks for

Councils do not take the exemption on trust, and the member of staff deciding it is usually a validation officer working from a checklist. Give them a short covering letter that states which limb of the exemption you rely on and attaches proof. In practice the material that works is:

  1. A letter from an occupational therapist, community nurse or consultant describing the functional need and the works that address it.
  2. Confirmation that the disabled person resides at the property, or a statement of intention to reside with a date.
  3. A Disabled Facilities Grant approval or application reference where one exists, because the grant process has already tested the need.
  4. Annotated drawings that show which elements of the scheme serve the access or facility purpose.
  5. For a public building, a short access statement explaining the barrier being removed.

The annotated drawing matters more than people expect. Where an officer can see on the plan that the whole of the extension is the wet room and the bedroom it serves, the exemption is straightforward. Where the drawing shows a 30 m² extension with a utility, a study and a shower room, they will ask questions.

A Design and Access Statement is not required for a householder application, but a page on access, approach and internal circulation makes the purpose of the works obvious and costs nothing to produce. For the wider set of fee reliefs, including resubmissions and alternative schemes, see the guide to planning fee exemptions and reductions.

Mixed proposals and how to split them

A client who wants a ground-floor wet room for a disabled parent and a loft conversion for a teenager has a choice. One application covering both attracts the full fee. Two applications, one for the adaptation and one for the rest, attract no fee on the first and the householder fee on the second.

Splitting is legitimate, and authorities are used to it. The caution is that the two schemes must be capable of standing alone in their own right. If the loft conversion depends on structural work that is only being done because of the extension, describing them as separate proposals invites a validation query about whether the applications are properly framed. Where the works are physically interdependent, apply once, pay the fee and stop arguing about it.

Listed building consent carries no fee in any event, so an adaptation to a listed dwelling needs only the planning fee question answered where planning permission is also required. Where the adaptation affects the character of a listed building, a Heritage Statement explaining the harm and the alternatives considered is the document that carries the application.

Where the exemption stops and other reliefs start

The planning fee is only one of several charges. The Building (Local Authority Charges) Regulations 2010 allow a local authority to exempt building control charges for work to a dwelling for the benefit of a disabled person, and most do. The Community Infrastructure Levy regulations contain a separate relief for residential extensions and for self-build, which is claimed before commencement and has its own forms and deadlines.

Value added tax relief on certain adaptations for a disabled person is a separate matter again, handled through the contractor rather than the council. Do not assume one relief implies another. Each is claimed in its own process, and missing the CIL deadline is a far more expensive mistake than a householder planning fee.

Mentioning the Equality Act 2010 in a fee letter rarely helps. The Act's duties bite on service providers and public bodies, not on the fee regulations, and the exemption you are relying on is the fee regulations themselves.

Claiming it at submission

Tick the fee exemption box on the application form, state the limb relied on, and upload the supporting letter as a separate document with a clear filename. Applications submitted through the Planning Portal will still generate a fee calculation, so expect to explain the zero figure to the validation team.

Three habits save a fortnight:

  • Name the exemption in the covering letter's first line rather than burying it in the Planning Statement.
  • Put the clinical letter in as its own document so it is not missed inside a drawings pack.
  • Ask the validation team to confirm the exemption in writing before the statutory period starts.

Where a case is not straightforward, a short Planning Statement setting out the resident's needs, the works proposed and the policy support for accessible housing gives the officer a single place to look.

If the authority refuses the exemption

There is no statutory appeal against a fee decision. The practical routes are to supply better evidence, to ask the validation manager to review the decision against the regulations, or to pay the fee and seek a refund once the exemption is accepted. Refunds are possible where a fee has been paid that was not due, and authorities do make them.

If none of that works, the council's own complaints procedure and then the Local Government and Social Care Ombudsman are the escalation routes. Both are slow. Paying a householder fee to keep an adaptation moving for a resident who needs it is often the better call, and the fee itself is set by national regulations and indexed annually from 1 April, so check the current schedule rather than a figure quoted in an old article.

One honest uncertainty: authorities differ in how much clinical evidence they want, and a few treat "proposes to reside" with real scepticism. Ask the validation team what they need before you submit, and get the answer in an email.

Drafting the covering material is quick. Browse the PlanScope report types to see which supporting documents a householder adaptation in a conservation area or to a listed building is likely to need.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is the planning fee exemption automatic?

No. You claim it on the application form and the validation officer decides whether the works qualify. Supply a letter from an occupational therapist or consultant, confirmation that the disabled person lives at the property or intends to, and drawings that mark which parts of the scheme serve the access purpose. Ask for written confirmation before the statutory period starts.

Does the exemption apply if the disabled person has not moved in yet?

It can. The exemption covers works for a disabled person who resides at the dwelling or proposes to reside there. Put the intention in writing, with a date, and support it with the clinical evidence. Some authorities apply more scepticism to this limb than to works for an existing resident, so expect to be asked for more than a bare statement.

What happens if my application also includes other work?

The exemption applies where the application relates solely to the qualifying works, so a mixed scheme attracts the full fee. Where the elements can stand alone, submitting two applications is legitimate: one for the adaptation at no fee, one for the rest at the normal householder rate. Physically interdependent work should go in a single application.

Do I still need permission at all for a ramp or a wet room?

Often not. Many ramps, level thresholds and internal alterations fall within permitted development or are not development at all, and single-storey rear extensions may be covered by Class A limits. Check the position with your council first. A Lawful Development Certificate is the only formal way to confirm that works are lawful.

Are building control charges and the levy exempt too?

They are handled separately. The Building (Local Authority Charges) Regulations 2010 let an authority exempt charges for disabled adaptation work, and most do. The Community Infrastructure Levy has its own relief for residential extensions, claimed before commencement on its own forms. Missing the levy deadline costs far more than a planning fee.

Can I appeal if the council refuses the exemption?

There is no statutory appeal on fees. Supply better evidence, ask the validation manager to review the decision against the fee regulations, or pay and request a refund once the exemption is accepted. Beyond that the council's complaints procedure and the Local Government and Social Care Ombudsman are the routes, and both take months.

Sources and further reading

planning feesdisabled accesshouseholder applicationsvalidationadaptations

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Planning Process

View all →
Planning Process7 min read

Varying a permission for development already begun

Section 73B of the Town and Country Planning Act 1990 allows a permission to be varied where the effect is not substantially different, including for works already carried out. How the test works, and how to choose between the routes.

Read article →
Planning Process7 min read

Planning history searches before you buy a site

The standard search misses more planning risk than it finds. Here is what to check on the register, and what to ask before you exchange.

Read article →
Planning Process6 min read

Accompanied and unaccompanied inspector site visits

The inspector will visit your site before deciding the appeal. Knowing whether it is accompanied, and what you are allowed to say, changes how you prepare.

Read article →
Planning Process6 min read

The appeal questionnaire and what the council must supply

The council's appeal questionnaire arrives within days of the start date and carries the officer report, policy extracts and consultation responses. Read it before you draft a word.

Read article →
Planning Process6 min read

What stops the eight week clock on an application

The determination period runs from the day after a valid application is received. Consultee silence and amended drawings do not pause it; only a written extension does.

Read article →
Planning Process7 min read

Writing a consultation response an officer can use

Objections that cite a policy number and show evidence get addressed in the officer's report. Objections that express concern get summarised in a sentence.

Read article →