Wales, Scotland and Northern Ireland

Infrastructure contributions in Wales, and how England differs

7 min readBy PlanScope Editorial Team

The Community Infrastructure Levy applies in Wales, but the English amendments made since 2010 largely do not. What that means for pooling, monitoring fees, affordable housing and the contributions budget on a Welsh scheme.

The Community Infrastructure Levy exists in Wales. It rests on the same Planning Act 2008 powers and the same 2010 Regulations as in England, because the levy was made for England and Wales together. What has diverged is almost everything that happened to those Regulations afterwards, and a developer who prices a Welsh scheme from English experience will get the contributions position wrong in both directions.

This article is about Wales. Welsh applications are determined under Planning Policy Wales, Future Wales and the adopted Local Development Plan.

Whether a levy applies at all in Wales

The first question on any Welsh site is whether the charging authority has adopted a charging schedule. Not every Welsh authority has, and the answer decides how your contributions will be secured.

Where a schedule exists, the levy operates in the familiar way: a rate per square metre set by zone and use, applied to net additional floorspace, with the chargeable amount calculated under Schedule 1 to the Regulations and indexed. Where no schedule has been adopted, everything comes through planning obligations under section 106 of the Town and Country Planning Act 1990.

Check the authority's own planning policy pages rather than a national list, because schedules are adopted, reviewed and occasionally revised, and a stale list will mislead you.

The England-only reforms, and why they matter

Part 4 of the Levelling-up and Regeneration Act 2023 created powers for a new Infrastructure Levy. Those powers extend to England and have not been brought into force, and the policy position on whether they will be has shifted more than once since the Act was passed. Verify the current position on gov.uk before advising a client, and treat anything written about it in 2023 as out of date.

For a Welsh scheme the point is simpler. The 2023 Act's levy powers do not apply in Wales at all. Wales continues with the Community Infrastructure Levy and section 106, and there is no Welsh equivalent of the new levy in prospect.

Separately, the Infrastructure (Wales) Act 2024 created a unified consenting process for significant infrastructure projects in Wales. It deals with how those projects are consented, not with how contributions are collected, and the two are easily confused because of the word in the title.

How contributions are mostly secured

Section 106 does the heavy lifting in Wales. An obligation has to satisfy the tests in regulation 122 of the 2010 Regulations, which apply across England and Wales: the obligation must be necessary to make the development acceptable in planning terms, directly related to the development, and fairly and reasonably related in scale and kind to it.

In practice a Welsh major application negotiates the same heads of terms an English one would. Affordable housing. Education contributions where the authority can evidence capacity pressure. Open space and play. Highway works under section 278 of the Highways Act 1980. Ecological management and biodiversity measures. Community facilities where the Local Development Plan supports them.

Where a levy schedule is in place, work out early which items are levy-funded and which remain in the agreement, because the authority should not be collecting twice for the same infrastructure.

Pooling, and a divergence worth checking

Here is the trap for anyone working across the border.

The restriction that prevented an authority from pooling more than five planning obligations towards a single infrastructure project was lifted in England by amendment regulations made in 2019. That amendment was made for England. Before you assume the restriction has gone on a Welsh site, check whether any Welsh equivalent has since been made, because the starting position is that English amendments to the 2010 Regulations do not extend to Wales.

The same caution applies to the restriction on using obligations for infrastructure that a charging schedule was intended to fund. If the restriction still operates, an authority seeking a sixth contribution towards a named project is asking for something it may not be able to take into account, and that is a point worth making politely and early rather than at committee.

Ask the authority to identify, in writing, how many obligations it has already pooled towards each project it wants you to contribute to. The answer is sometimes illuminating.

Affordable housing in Welsh obligations

Affordable housing is secured by obligation rather than by levy, and the Welsh policy framework is its own. Planning Policy Wales sets the strategic requirement and Technical Advice Note 2 on planning and affordable housing provides the method, with the site-specific target coming from the adopted Local Development Plan and any viability evidence behind it.

The tenure definitions, the intermediate housing products and the local connection conditions used in Wales differ from the English ones. Drafting a Welsh agreement using an English affordable housing schedule produces obligations the registered social landlord cannot work with, which then has to be renegotiated after the committee resolution.

An Affordable Housing Statement for a Welsh scheme therefore needs the Welsh tenure terms and the Local Development Plan policy, not the English equivalents. Where you are arguing that the policy target is undeliverable, the Viability Assessment has to be built on Welsh policy inputs and benchmark land value evidence as well.

Transparency and monitoring

Annual infrastructure funding statements, which tell you what an authority collected and spent, were introduced in England by the 2019 amendments. There is no automatic Welsh equivalent, so the evidence of what has been collected and committed is harder to assemble.

Where you need it, the places to look are the authority's committee reports, its capital programme, any section 106 monitoring report it chooses to publish, and a request under the Environmental Information Regulations 2004 if nothing is published. That evidence matters when you are resisting a contribution on the basis that the project it funds is already fully funded or has not been delivered.

Monitoring fees are the other divergence. The English basis for charging them was clarified in 2019. In Wales the position is less settled, so ask the authority to justify the fee by reference to the actual monitoring task rather than accepting a percentage.

England Wales
Levy powers under the 2023 Act Created, not brought into force Do not apply
Pooling restriction Lifted in 2019 Check whether a Welsh amendment has been made
Annual infrastructure funding statement Required No automatic equivalent
National affordable housing guidance Planning Practice Guidance Planning Policy Wales and TAN 2

Budgeting a Welsh scheme

Assume a section 106 heavy outcome unless you have confirmed a charging schedule, and price the obligation negotiation itself as a cost and a programme risk. Four practical steps:

  1. Confirm in writing whether a charging schedule has been adopted, and get the rate and zone plan if it has.
  2. Ask for the authority's standard section 106 template and its published contribution formulae at pre-application stage.
  3. Request the pooling position for each infrastructure project the authority names.
  4. Instruct Welsh solicitors on the deed. The drafting conventions, the registered social landlord sector and the local authority structures are not the English ones.

Wales runs 25 planning authorities including three National Park authorities, and practice between them varies more than the smaller number might suggest. Devolved systems are built differently rather than being variations on the English one, as our note on the two tier system in Northern Ireland shows from another angle.

For a Welsh site, start by asking the authority two questions in one email: is there an adopted charging schedule, and what is your standard set of heads of terms for a scheme of this scale. You can browse the report types by category to see which supporting documents the application will need, remembering that a Welsh submission needs its national policy references checked by whoever reviews the draft.

This is general guidance, not legal advice. Check the position with the local planning authority or a qualified Welsh planning solicitor before relying on it, and note that PlanScope's drafting is grounded in English policy, so Welsh applications need the relevant national policy checked by the reviewer. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Does the Community Infrastructure Levy apply in Wales?

Yes. The levy rests on Planning Act 2008 powers that cover England and Wales, and Welsh charging authorities may adopt a charging schedule. Not every authority has, so the first step on a Welsh site is to confirm whether a schedule exists, because that determines how contributions are secured.

Will the new Infrastructure Levy apply in Wales?

No. The levy powers in Part 4 of the Levelling-up and Regeneration Act 2023 extend to England, and they have not been brought into force there. There is no Welsh equivalent in prospect, so Wales continues with the Community Infrastructure Levy and section 106 obligations.

Does the five obligation pooling restriction still apply in Wales?

The amendment that lifted it was made for England in 2019, and English amendments to the 2010 Regulations do not automatically extend to Wales. Check whether a Welsh equivalent has since been made before assuming the restriction has gone, and ask the authority how many obligations it has already pooled.

How is affordable housing secured on a Welsh scheme?

By planning obligation rather than levy. Planning Policy Wales sets the strategic requirement and Technical Advice Note 2 provides the method, with site-specific targets from the adopted Local Development Plan. Welsh tenure definitions and intermediate products differ from the English ones.

Do Welsh councils publish infrastructure funding statements?

There is no automatic Welsh equivalent of the English annual statement, which was introduced by the 2019 amendments. To find out what has been collected and spent, look at committee reports, the capital programme and any voluntary monitoring report, or make a request under the Environmental Information Regulations 2004.

Can I use an English section 106 template in Wales?

Not safely. The affordable housing tenure terms, the registered social landlord sector, the local authority structures and the drafting conventions all differ. English schedules produce obligations the Welsh provider cannot work with, which then have to be renegotiated after the committee resolution.

Sources and further reading

walescilsection 106infrastructure levyaffordable housing

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Wales, Scotland and Northern Ireland

View all →
Wales, Scotland and Northern Ireland7 min read

Northern Ireland: development in areas of natural beauty

Development in a Northern Ireland area of outstanding natural beauty is judged on siting and integration as much as principle. The landscape test is where most schemes fail.

Read article →
Wales, Scotland and Northern Ireland6 min read

Scotland: the infrastructure levy power and its status

Scotland has an enabling power for an infrastructure levy and no regulations to bring it into effect. Section 75 obligations still carry developer contributions.

Read article →
Wales, Scotland and Northern Ireland7 min read

Wales: the sustainable transport hierarchy in applications

In Wales the sustainable transport hierarchy is national policy applying to site choice and layout, not just to the transport chapter. Active travel duties and maximum parking standards follow from it.

Read article →
Wales, Scotland and Northern Ireland7 min read

Scotland: open space and play provision policy

Scotland puts open space strategies and play sufficiency assessments on a statutory footing. What they mean for layout, standards and section 75 obligations.

Read article →
Wales, Scotland and Northern Ireland7 min read

Wales: minerals and aggregates policy in applications

Welsh minerals applications run on MTAN 1, the regional technical statements and the well-being duty. What to assess and what the submission has to contain.

Read article →
Wales, Scotland and Northern Ireland7 min read

Northern Ireland: the Department's call-in power explained

A call-in takes an application out of a council's hands and removes the appeal to the Planning Appeals Commission. The criteria, the process and the programme risk.

Read article →