Levy abatement for existing lawful floorspace

6 min readBy PlanScope Editorial Team

Existing floorspace only reduces a levy liability where the building passes the in-use test: lawful use for six continuous months within the preceding three years.

Community infrastructure levy is charged on net additional floorspace, so existing floorspace on the site can be deducted from the chargeable amount. The deduction is not automatic. Regulation 40 of the Community Infrastructure Levy Regulations 2010 only allows floorspace in an in-use building to be offset, and a building is in use for this purpose only if a part of it has been in lawful use for a continuous period of at least six months within the three years ending on the day planning permission first permits the chargeable development. Fail that test and you pay the levy on the whole of the new floorspace, including the part that replaces a building you have just knocked down.

The amounts involved are large enough that the evidence of occupation is worth assembling before the application goes in, not after a demand notice arrives.

How abatement reduces the chargeable amount

The levy calculation takes the gross internal area of the chargeable development, deducts qualifying existing floorspace, applies the charging authority's rate for the relevant use, and indexes the result. The deduction covers floorspace in an in-use building that is to be demolished, and retained parts of such a building, measured on the same basis as the new floorspace.

Measure consistently. Gross internal area is the measurement convention, and a floor area taken off an old set of drawings at a different convention will not match the new scheme. Where the figures are contested, the difference is almost always a measurement convention rather than a dispute about walls.

The practical effect on a conversion or redevelopment can be the whole liability. A scheme replacing a 900 m² occupied building with 1,100 m² of new floorspace pays on the net addition where the test is met, and on the full 1,100 m² where it is not. That is the figure to put in front of a client before they agree to demolish anything.

The in-use building test

Three elements have to line up, and each is a place where authorities refuse the offset.

The use must be lawful. A building in unauthorised use, or in a use that has never had permission and has not become lawful through the passage of time, does not qualify however long it has been occupied.

The use must have run for a continuous period of at least six months. Six separate months across the three years is not the same as six continuous months, and a building emptied and re-let repeatedly can fail on continuity alone.

The period must sit within the three years ending on the day planning permission first permits the chargeable development. That date is not the date of the application, and on an outline permission with reserved matters it may be considerably later, which can work in either direction.

Evidence of lawful use and occupation

Charging authorities want documents, not assertions. Build the file as you would for a lawful development certificate.

  • Business rates records showing the rateable occupier and the period
  • Utility bills with consumption, not just standing charges
  • Tenancy agreements, licences and rent demands with payment records
  • VAT returns or trading accounts referable to the premises
  • Employee records, payroll addresses or delivery records
  • Dated photographs of the interior in use, and signage
  • The planning history establishing that the use was lawful

The weakest evidence is a statutory declaration with nothing behind it. The strongest is rates records plus metered consumption, because the two together show both liability and actual occupation. Where the building was partly occupied, say which part and for how long, since the test is satisfied by a part of the building being in use rather than the whole.

Floorspace that cannot be offset

Several categories sit outside the deduction and are worth checking before relying on a number.

Floorspace Position
Unlawful floorspace or unlawful use No deduction
Buildings failing the six month continuous use test No deduction
Structures into which people do not normally go, or go only for maintenance Outside the definition of building
Floorspace already deducted on an earlier permission for the same land Check the interaction before assuming
Open sided or unenclosed areas Not gross internal area

The structures point catches industrial sites. Silos, tanks, plant enclosures and open sided canopies often make up a large share of a site's apparent floorspace and contribute nothing to the deduction, so an early measured survey that separates qualifying from non-qualifying area avoids a nasty revision to the appraisal.

Buildings demolished before the application

This is the expensive mistake. The deduction works from a building situated on the land on the day planning permission first permits the chargeable development, so demolishing under an earlier consent, or clearing a site to make it more marketable, can forfeit the offset entirely.

The sequence that protects the position is to obtain the permission that will carry the levy liability first, then demolish. Where demolition has to happen earlier for safety or practical reasons, take advice on the current regulation before instructing the contractor, and record the floor areas, the occupation evidence and the condition of the building before it goes.

The same logic applies to vacancy. A building left empty while a scheme is designed can slide out of the three year window, and the longer the design programme runs the greater the risk. Keeping a building in genuine lawful occupation during that period, through a short term letting or a meanwhile use, protects the deduction as well as generating income. The valuation consequences of that are a separate question, covered in meanwhile use and its effect on benchmark land value.

Recording the position on the forms

The existing floorspace claim is made on the additional information form submitted with the planning application. Complete it properly rather than leaving it to be sorted out later, because the charging authority calculates the liability from what the form says.

  1. Submit the additional information form with the application, with the existing floorspace stated and the use identified
  2. Attach the occupation evidence rather than offering to supply it on request
  3. Assume liability in writing before development starts, using the assumption of liability form
  4. Serve the notice of the start of works before anything begins on site, because missing it loses instalment rights and triggers a surcharge
  5. Check the liability notice when it arrives, against your own calculation

If the liability notice is wrong, there is a formal route. A request for review of the chargeable amount goes to the charging authority within the prescribed period, and an appeal on the chargeable amount then lies to the Valuation Office Agency. Both have short deadlines, so diary them when the notice arrives.

Where authorities refuse the offset

The common refusals are predictable. Insufficient evidence of occupation. A use that was lawful in fact but never authorised in planning terms. A gap in occupation that breaks continuity. A building demolished before the relevant date. And floorspace that was never gross internal area in the first place.

Two of those are curable by better record keeping and one by better sequencing, which is why the levy position belongs in the appraisal at acquisition rather than at the point of submission. A viability assessment that assumes an offset the evidence will not support is a viability assessment that will be unpicked.

Browse the report types to see which documents a redevelopment scheme is likely to need alongside the levy paperwork.

This is general guidance, not legal advice. Check the position with your charging authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What is the in-use building test for CIL?

Under regulation 40 of the Community Infrastructure Levy Regulations 2010, a part of the building must have been in lawful use for a continuous period of at least six months within the three years ending on the day planning permission first permits the chargeable development. Six non-continuous months do not satisfy it.

Does demolishing a building before applying lose the offset?

Usually yes. The deduction works from a building on the land on the day planning permission first permits the chargeable development, so clearing a site under an earlier consent can forfeit it. Obtain the permission that will carry the liability first, then demolish, and record floor areas and occupation evidence beforehand.

What evidence proves lawful occupation?

Business rates records showing the rateable occupier and period, utility bills with metered consumption rather than standing charges, tenancy agreements with payment records, trading accounts, employee or delivery records, dated interior photographs, and the planning history establishing the use was lawful. Rates plus metered consumption is the strongest combination.

Does all the floorspace on a site count towards the offset?

No. Unlawful floorspace, buildings failing the in-use test, structures into which people do not normally go such as silos, tanks and plant enclosures, and open sided areas that are not gross internal area are all excluded. Separate qualifying from non-qualifying area with a measured survey early.

What can I do if the liability notice is wrong?

Request a review of the chargeable amount from the charging authority within the prescribed period, and if that does not resolve it, appeal on the chargeable amount to the Valuation Office Agency. Both routes have short deadlines, so put the dates in the diary as soon as the liability notice arrives.

Sources and further reading

community infrastructure levycilexisting floorspaceredevelopmentviability

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Viability, Obligations and Commercial

View all →
Viability, Obligations and Commercial7 min read

Nomination agreements and why providers reject drafts

A stalled nomination agreement becomes a planning problem when occupation is tied to it. What providers need in the drafting, and when to involve them.

Read article →
Viability, Obligations and Commercial7 min read

Phasing triggers in a section 106 and what they key to

On a phased site the triggers in a section 106 matter more than the totals. How each type behaves, and the definitions that make them work when the programme slips.

Read article →
Viability, Obligations and Commercial7 min read

Overage and clawback in a planning obligation

Section 106 overage shares scheme upside with the authority, usually as affordable housing. This covers early, mid and late stage triggers, defining the uplift, why a cap matters to funders, and the drafting traps that surface years later.

Read article →
Viability, Obligations and Commercial6 min read

The retail sequential test: available, suitable and viable

A sequential test asks three questions of every alternative site. This covers catchment definition, evidencing availability with dated agent enquiries, the flexibility national policy expects, and the 300 metre edge of centre definition.

Read article →
Viability, Obligations and Commercial6 min read

Levy stop notices and what they prevent

A levy stop notice halts the whole site, not just part of it, and breaching one is a criminal offence. Here is the warning notice sequence, how an instalment default creates an overdue balance, and the contractual damage that follows.

Read article →
Viability, Obligations and Commercial6 min read

Appealing a levy surcharge to the Planning Inspectorate

Surcharge appeals under regulation 117 go to the Planning Inspectorate within 28 days, while chargeable amount disputes go to the Valuation Office Agency. The grounds are narrow and factual.

Read article →