Planning Process

Conditions that restrict occupancy and how they work

7 min readBy PlanScope Editorial Team

An occupancy condition runs with the land until it is formally removed. Section 73 and a lawfulness certificate are the only routes, and each needs different evidence.

An occupancy condition limits who may live in a dwelling, and it runs with the land until it is formally removed. The commonest form is the agricultural occupancy condition, which restricts occupation to a person solely or mainly working, or last working, in the locality in agriculture or forestry, their surviving spouse or civil partner, and resident dependants. Breaching it is a breach of condition, and a breach of condition notice carries no appeal to the Planning Inspectorate.

For a rural owner the two live questions are usually whether the condition can be removed and what it does to the value of the house in the meantime.

Why occupancy conditions are imposed

They exist because the permission would not have been granted without them. A dwelling in open countryside, away from a settlement, conflicts with the plan-led approach to where housing goes. National policy allows an exception where there is an essential need for a rural worker to live permanently at or near their place of work.

The condition is what converts that justification into something enforceable. Without it, a farm worker's house becomes an unrestricted house in the countryside the day it is finished, and the exception becomes a route to open market housing.

The same logic produces other restrictions. A principal residence condition exists because the authority concluded that second home ownership was harming the local housing market. A holiday occupancy condition exists because permanent residential use in that location would have been refused.

Read the officer's report that accompanied the original permission. It tells you what the condition was for, and that purpose is what a later application to remove it has to address.

Agricultural and rural worker conditions

The standard wording has four parts worth separating.

Occupation is limited to a person solely or mainly employed in agriculture or forestry. Someone with a full-time job elsewhere and a few acres at home does not satisfy it.

The employment must be in the locality. Locality is not defined, and the practical test applied by authorities and inspectors is whether the dwelling serves a functional need within a sensible travelling distance.

A person last working in agriculture or forestry is included, so retirement does not end compliance. This is the part owners most often miss, and it means a retired farm worker can remain lawfully.

Surviving spouses, civil partners and resident dependants are included, which gives the household continuity after a death.

Some conditions are tied to a particular holding rather than to agriculture generally. Those are much tighter, and the wording on the decision notice governs, not the standard form.

Local connection and principal residence conditions

Principal residence restrictions require the dwelling to be occupied as the occupier's sole or main residence, and they are used in areas where second home ownership has been identified as a problem in the adopted plan.

Enforcement works through evidence of residence: council tax records, the electoral roll, registration with a local doctor or dentist, utility accounts and school enrolment. An authority asking the question will usually ask for several of these together.

Local connection restrictions go further and limit occupation to people with a defined link to a parish or area, by residence, employment or family. These are more often secured by a planning obligation than by condition, because an obligation can set out eligibility criteria, a cascade of priority groups and a mechanism for the authority to approve an occupier. Where the restriction sits in an agreement rather than a condition, the route to change it is different, as varying a section 106 agreement after permission explains.

Restriction Usual mechanism Tested by
Agricultural or rural worker occupancy Condition Employment in agriculture or forestry in the locality
Principal residence Condition or obligation Evidence that the dwelling is the sole or main residence
Local connection Planning obligation Defined eligibility criteria and a cascade
Holiday occupancy Condition Register of occupiers and maximum length of stay
Personal permission Condition Identity of the named occupier

Personal permissions and their limits

A condition can make a permission personal to a named individual, so that the permission lapses when that person ceases to occupy. National guidance treats these as exceptional, because planning permission normally runs with the land and attaches to the development rather than the person.

They turn up where the planning case rests on personal circumstances: a dwelling justified by the care needs of a particular person, or a site granted on the basis of a named family's accommodation needs. The condition is only lawful where those circumstances are what actually makes the development acceptable.

Two practical consequences follow. A personal permission is close to unsellable while the condition stands, because the buyer gets nothing. And where the named person dies or moves, the lawful use may simply end, leaving the building without a permitted use.

Removing an occupancy condition

There are two routes, and they are not alternatives so much as answers to different situations.

The first is an application under section 73 of the Town and Country Planning Act 1990 to vary or remove the condition. The question for the authority is whether the condition is still necessary, measured against the six tests in national guidance. Evidence of no continuing functional need in the locality, supported by marketing, is what carries that application. A refusal can be appealed, and where the authority fails to decide, the options are set out in appealing non-determination, and whether to wait.

The second is a certificate of lawful existing use or development under section 191. Where the dwelling has been occupied in breach of the condition continuously for the relevant immunity period, the breach can no longer be enforced against, and the certificate records that. Under section 171B(3) the period for a continuing breach of condition is ten years, and section 115 of the Levelling-up and Regeneration Act 2023 moved the former four year limits in England to ten years, so establish which regime applies to the facts before advising anyone.

The evidential burden on a certificate application sits with the applicant and the standard is the balance of probabilities. Continuous occupation means exactly that, and a two year gap part way through usually destroys the claim.

Marketing evidence for removal

Where removal rests on there being no need, the authority will want to see that the restricted dwelling was offered to the restricted market and found no buyer.

What a well-prepared marketing exercise looks like:

  1. A period of continuous marketing, commonly twelve months, agreed with the authority in advance where possible.
  2. A price that reflects the restriction rather than the open market value, with a valuer's justification for the figure.
  3. Advertising through channels the restricted market actually uses, including agricultural and rural property agents and local trade press rather than a general portal listing alone.
  4. A full record of enquiries, viewings, offers and the reason each one did not proceed.
  5. Evidence addressed to the wider locality, since the condition is not limited to the holding.
  6. Evidence on need, such as the absence of farm businesses in the area seeking accommodation.

A marketing campaign at an open market price produces no buyers and proves nothing. Authorities know this, and an application built on it tends to be refused and then lost on appeal. A short Planning Statement that sets out the original justification, what has changed, and the marketing evidence against each limb of the condition gives the officer something to recommend.

Effect on value and mortgageability

A restricted dwelling is worth less than the same house unrestricted, and the discount is real rather than theoretical. Valuers apply it, and lenders take different views: some will lend on an agricultural occupancy dwelling at a reduced loan to value, others decline the sector entirely.

Three practical points for owners.

Tell a buyer early. A sale that collapses at mortgage offer stage because the restriction was buried in the title wastes months on both sides.

Do not attempt to deal with a restriction by informal agreement with the council. Officer correspondence does not remove a condition, and a buyer's solicitor will not accept it.

Budget for the process. The fee for a section 73 or certificate application is modest against the value uplift, and the cost that matters is the twelve months of marketing and the professional evidence. Some fee reductions and exemptions do apply to applications of this kind, and planning fee exemptions and reductions is worth checking before paying.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

Enter the property postcode on PlanScope to see which documents an application to vary a condition is likely to need. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Who can live in a house with an agricultural occupancy condition?

In the standard form, a person solely or mainly working, or last working, in the locality in agriculture or forestry, that person's surviving spouse or civil partner, and resident dependants. Retirement does not end compliance because of the last working limb. Some conditions are tied to a named holding, which is far tighter, so read the decision notice.

How do I get an agricultural occupancy condition removed?

Either apply under section 73 of the Town and Country Planning Act 1990 to vary or remove it, supported by marketing and need evidence, or apply for a certificate of lawful existing use or development if the dwelling has been occupied in breach continuously for the relevant immunity period. The two routes answer different situations.

How long does the marketing have to run?

There is no statutory period and twelve months of continuous marketing is the common expectation. What matters more is the price, which must reflect the restriction rather than open market value, the channels used, which should reach the restricted market, and a full written record of enquiries, viewings and offers.

Will a lender give a mortgage on a restricted dwelling?

Some will, often at a reduced loan to value, and others decline the sector. Valuers apply a discount against the unrestricted value. Tell a prospective buyer about the restriction early, because a sale that collapses at mortgage offer stage because the condition was buried in the title costs both sides months.

Can the council simply agree to ignore an occupancy condition?

No. A condition can only be varied or removed by a formal application, and officer correspondence does not change it. A letter saying the council will not enforce may indicate current intentions, but it does not bind the authority, it does not survive a change of officer, and a buyer's solicitor will not accept it.

Sources and further reading

occupancy conditionsagricultural occupancysection 73rural housingprincipal residence

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Planning Process

View all →
Planning Process7 min read

Varying a permission for development already begun

Section 73B of the Town and Country Planning Act 1990 allows a permission to be varied where the effect is not substantially different, including for works already carried out. How the test works, and how to choose between the routes.

Read article →
Planning Process7 min read

Planning history searches before you buy a site

The standard search misses more planning risk than it finds. Here is what to check on the register, and what to ask before you exchange.

Read article →
Planning Process6 min read

Accompanied and unaccompanied inspector site visits

The inspector will visit your site before deciding the appeal. Knowing whether it is accompanied, and what you are allowed to say, changes how you prepare.

Read article →
Planning Process6 min read

The appeal questionnaire and what the council must supply

The council's appeal questionnaire arrives within days of the start date and carries the officer report, policy extracts and consultation responses. Read it before you draft a word.

Read article →
Planning Process6 min read

What stops the eight week clock on an application

The determination period runs from the day after a valid application is received. Consultee silence and amended drawings do not pause it; only a written extension does.

Read article →
Planning Process7 min read

Writing a consultation response an officer can use

Objections that cite a policy number and show evidence get addressed in the officer's report. Objections that express concern get summarised in a sentence.

Read article →