Planning Process

Pre-application charging schedules and what the fee buys

8 min readBy PlanScope Editorial Team

The fee buys an officer's opinion, not a decision. How charging tiers are structured, whether specialist and consultee input is included, and the closed questions that produce substantive answers.

Pre-application advice is a discretionary service, not a statutory one, and the fee you pay buys an officer's opinion rather than a decision. Local planning authorities charge for it under the general power in section 93 of the Local Government Act 2003, which allows a charge for a discretionary service provided the income does not exceed the cost of providing it. That is the whole legal basis, and it explains why charging schedules vary so widely between authorities and why the service levels attached to each tier vary with them.

For a self-builder with a single plot, the question is usually worth asking: the principle of development is the entire project, and a written officer view on principle for a few hundred pounds costs far less than a refused application and an appeal.

Where the power to charge comes from

There is no duty on an authority to provide pre-application advice and no statutory service standard for it. National policy encourages early engagement and says that the more issues resolved before an application is submitted, the greater the benefits, and national guidance sets out what good pre-application engagement looks like. Neither creates an entitlement.

Because the charge is cost recovery for a discretionary service, authorities set their own tiers, their own prices and their own exclusions. Some publish a detailed schedule with response times and named inclusions. Some publish a single figure and a paragraph. The schedule is the contract, so read it before paying rather than afterwards.

Two practical points. Check whether VAT is added, because practice differs between authorities. And check whether the fee is refundable or creditable against the planning application fee, which a few authorities offer for minor schemes.

Reading the authority's published tiers

Schedules are usually banded two ways at once: by the scale of the proposal and by the level of service.

Band Typical scope Usual service
Householder Extensions, outbuildings, conversions of one dwelling Written response, sometimes a site visit
Minor 1 to 9 dwellings, small commercial Written response, often with a meeting option
Major 10 or more dwellings, 1,000 m² or more Written response, meeting, sometimes specialist input
Large major Strategic sites, 150 or more dwellings Bespoke quote or a planning performance agreement
Follow-up A second submission on the same scheme Discounted rate, often time limited

Within those bands, the service levels tend to run from a written response only, through a written response plus one meeting, to a package including a site visit, a meeting and specialist officer input. The step up in price between levels is often small relative to the value of a meeting, and the meeting is usually where the useful information is.

For major schemes, a planning performance agreement is a different product. It is a project management arrangement setting a timetable, naming the officers involved and committing resources on both sides, usually for a larger fee. It does not guarantee an outcome and it does buy predictability on timing.

What is included at each level

A written response at the minor or householder level typically identifies the development plan policies that apply, lists the constraints affecting the site, gives the officer's view on the principle of the development and on the main design or amenity issues, and sets out the documents the authority would expect with an application.

That last item is often the most valuable part. Every authority has its own local validation list on top of the national requirements, and the pre-application response is the least costly way to get a definitive list for your site before you commission anything. The supporting case then needs assembling, and for a small scheme that normally means a planning statement addressing the policies the officer identified.

What a written response usually does not include is a design solution. Officers will say whether something is acceptable and will rarely redesign it for you, and on a contentious site they may decline to give a view on principle at all, which is frustrating and is within their discretion.

At the higher tiers the response may also indicate the likely planning obligations, the probable conditions, whether the application would go to committee, and the officer's view on whether a sequential test, viability case or heritage justification would be needed.

Specialist input and whether it is covered

This is the single biggest variable between authorities and the most common source of disappointment.

Internal specialists, meaning conservation officers, urban designers, tree officers, ecologists and landscape officers, are sometimes included in the fee and sometimes charged separately. External statutory consultees, meaning the highway authority, the lead local flood authority, the Environment Agency, Natural England and Historic England, are frequently not consulted at pre-application stage at all.

That matters because highways and drainage are where minor applications most often fail. Many highway authorities operate their own separate pre-application service with its own fee and its own timetable, and on any scheme involving a new access it is worth using, independently of the planning pre-app.

Ask the question directly before paying: which officers and which external consultees will see this, and will their comments be reported to me. An answer naming the consultees is worth having in writing, and a response that reports only the planning officer's view on a site with a flood constraint is an incomplete picture. How consultee comments arrive and sit on the file once an application is live is covered in the note on consultee responses and the officer's case file.

Questions that get a useful answer

The quality of the response correlates almost exactly with the quality of the questions. Open questions produce generic answers.

Ask closed, policy-anchored, numbered questions:

  1. Is the principle of one dwelling on this plot acceptable having regard to the settlement boundary policy and the housing policies in the adopted plan?
  2. Of the two access arrangements shown on the enclosed plan, which would the authority prefer and on what basis?
  3. Would the authority require a transport statement or a transport assessment for this scale of development?
  4. Which documents on the local validation list apply to this application, and are any of the national requirements not needed here?
  5. Does the authority consider the site to be previously developed land for the purposes of the relevant policy?
  6. Would the authority expect a biodiversity gain plan with on-site or off-site delivery on a site of this size?
  7. Are there any constraints on the site that we have not identified in the enclosed constraints summary?

Submit a package rather than a paragraph. A site location plan with the red line, an existing and proposed sketch layout at a readable scale, photographs of the site and its surroundings, a short constraints summary showing what you have already checked, and the numbered questions. Officers given that material respond substantively. Officers given a postcode and a question respond with a policy list.

The weight the advice carries afterwards

Pre-application advice is officer advice. It is not a decision, it does not bind the authority, and the response will say so in terms. Members are not bound by it and neither is a different officer who inherits the case.

It can be a material consideration of limited weight, and it is most useful as a record. Where you have designed the scheme to officer advice and the application is then refused on a ground the advice did not raise, the advice is evidence worth putting in front of an inspector, both on the planning merits and on the reasonableness of the authority's conduct.

Do not assume the advice is confidential indefinitely. Authorities commonly treat pre-application advice as commercially sensitive for a period, and it may become disclosable in response to a request under the environmental information regime, which carries a public interest test. Write on the assumption that the advice and your submission could be read by an objector later.

Timescales and what to submit

Four to eight weeks for a written response is typical at the minor and householder levels, longer for majors, and some authorities offer an expedited service at a premium. Those are service targets rather than statutory periods, so there is no remedy if they slip, which argues for starting the pre-application process before you need the answer.

Diary a chase at the stated response date. Keep the correspondence, because if the application is later refused on a point the advice did not flag, the paper trail is useful.

Factor the fee into the project budget alongside the application fee itself, which is set by the national fee regulations and indexed annually, and check whether any of the fee exemptions and reductions apply to your scheme.

When to skip the pre-application stage

Not every scheme needs it, and the fee is real money on a small project.

Skip it where the authority publishes a householder design guide that answers your question, where a materially identical scheme was approved on an adjoining plot recently, where the proposal is plainly permitted development and a certificate under section 192 is the better product, or where the policy position is unambiguous and the only question is design detail that will be resolved by negotiation during the application anyway.

Use it where the principle of development is in doubt, which covers most self-build plots and most rural or constrained sites. Use it where you are about to spend money on specialist surveys and want to know which ones are actually required. And use it where the site has a constraint you do not understand, because an officer who knows the area will often tell you something that is not on any map.

See PlanScope pricing if you want to understand what the supporting documents themselves cost alongside the authority's fees.

This is general guidance, not legal advice. Pre-application charges, service levels and response times are set by each authority and change, so check the current published charging schedule before relying on anything here. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Why do councils charge for pre-application advice?

Because it is a discretionary service with no statutory duty behind it. Authorities charge under the general power in section 93 of the Local Government Act 2003, which permits a charge for a discretionary service provided the income does not exceed the cost of providing it. Each authority therefore sets its own tiers and prices.

Does pre-application advice bind the council?

No. It is officer advice rather than a decision, the response will say so, and members and other officers are not bound by it. It can be a material consideration of limited weight, and it is most useful as a record where an application is later refused on a ground the advice never raised.

Will the highway authority comment at pre-application stage?

Often not. Many authorities do not consult external statutory consultees before an application is submitted, so highways and drainage comments may be absent from the response. Several highway authorities run their own separate pre-application service with its own fee, which is worth using where a new access is involved.

What should I submit with a pre-application request?

A site location plan with the red line, existing and proposed sketch drawings at a readable scale, photographs of the site and its surroundings, a short constraints summary showing what you have already checked, and a numbered list of closed, policy-anchored questions. Officers given that material respond substantively.

When is pre-application advice not worth the fee?

Where the authority's householder design guide already answers the question, where a materially identical scheme was recently approved next door, where the proposal is plainly permitted development and a section 192 certificate is the better product, or where the only outstanding issue is design detail that negotiation will settle.

Sources and further reading

pre-applicationplanning processfeesself-buildplanning advicevalidation

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Planning Process

View all →
Planning Process7 min read

Varying a permission for development already begun

Section 73B of the Town and Country Planning Act 1990 allows a permission to be varied where the effect is not substantially different, including for works already carried out. How the test works, and how to choose between the routes.

Read article →
Planning Process7 min read

Planning history searches before you buy a site

The standard search misses more planning risk than it finds. Here is what to check on the register, and what to ask before you exchange.

Read article →
Planning Process6 min read

Accompanied and unaccompanied inspector site visits

The inspector will visit your site before deciding the appeal. Knowing whether it is accompanied, and what you are allowed to say, changes how you prepare.

Read article →
Planning Process6 min read

The appeal questionnaire and what the council must supply

The council's appeal questionnaire arrives within days of the start date and carries the officer report, policy extracts and consultation responses. Read it before you draft a word.

Read article →
Planning Process6 min read

What stops the eight week clock on an application

The determination period runs from the day after a valid application is received. Consultee silence and amended drawings do not pause it; only a written extension does.

Read article →
Planning Process7 min read

Writing a consultation response an officer can use

Objections that cite a policy number and show evidence get addressed in the officer's report. Objections that express concern get summarised in a sentence.

Read article →