Removing a hedgerow to create a site access
A countryside hedgerow needs a removal notice, unless planning permission already requires the removal. Get the order wrong and you argue a retention notice on appeal first.
Removing a hedgerow to create a site access runs through two separate consent routes, and which one applies depends entirely on the order you do things in. Before planning permission exists, a countryside hedgerow of 20 metres or more usually needs a hedgerow removal notice to the local planning authority, which then has six weeks to decide whether the hedgerow is important and should be retained. Once planning permission has been granted and removal is required to carry out that development, the notice procedure falls away under an exemption in the Hedgerows Regulations 1997.
That sequencing matters, because an applicant who serves a notice first can be handed a hedgerow retention notice that then has to be argued through an appeal before the scheme can proceed.
Two consent routes for one hedge
The Hedgerows Regulations 1997 apply to a hedgerow that is 20 metres or more in length, or shorter where it meets another hedgerow at each end, and which grows on or adjacent to land used for agriculture, forestry or horse breeding, common land, a local nature reserve, or a site of special scientific interest. Hedgerows within the curtilage of a dwelling, or marking its boundary, are outside the Regulations altogether, which is why garden hedges can be grubbed out without notice.
Where the Regulations apply, removing a hedgerow without going through the notice procedure is an offence, and in England the fine on conviction is unlimited. The authority can also serve a notice requiring you to replant.
Regulation 6 lists the exemptions. The ones relevant to an access are removal to make a new opening in substitution for an existing opening of the same or greater width, removal to obtain access where no other reasonable means of access is available, and removal required for carrying out development for which planning permission has been granted.
So for a site with permission, the hedgerow removal is authorised by the permission. For a site without it, the practical order is: assess the hedgerow, include its loss and replacement in the planning application, obtain permission, then remove. Serving a removal notice as a separate first step is almost always the wrong move.
Assessing whether the hedgerow is important
The test in Schedule 1 to the Regulations has two limbs and both must be met. The hedgerow must have existed for 30 years or more, and it must satisfy at least one of the criteria in the archaeology and history group or the wildlife and landscape group.
The archaeology and history criteria include marking a pre-1850 parish or township boundary, incorporating an archaeological feature, being part of a field system or an integral part of a pre-enclosure field system, and containing specified features. The wildlife and landscape criteria are largely about species richness and associated features, counting woody species along a 30 metre length and adding points for associated features such as a bank, wall, ditch, standard trees, or a connecting hedgerow at each end.
The assessment is a survey exercise. Someone walks the hedge, records woody species in 30 metre sections, records associated features, and checks historic mapping for the age and boundary question. The first edition Ordnance Survey mapping is the usual evidence for pre-1850 boundaries, and the county Historic Environment Record holds the archaeological side.
Do this survey even where an exemption applies. An important hedgerow is a material consideration in the planning decision whatever the Regulations say, and an officer who discovers the significance after refusing to accept your loss justification will not be sympathetic.
Notice procedure and timing
Where a notice is needed, it goes to the local planning authority with a plan showing the hedgerow and the length to be removed, the reasons for removal, and evidence on the age and the Schedule 1 criteria. The authority has six weeks. It can agree, in which case removal may proceed within two years, or it can serve a hedgerow retention notice.
An appeal against a retention notice goes to the Secretary of State. That adds months, which is the practical reason to deal with the hedgerow inside the planning application rather than through a parallel notice.
Two timing traps. The six weeks runs from receipt of a valid notice, so an incomplete notice simply restarts the clock. And the two year permission to remove, once given, does not extend, so a notice served too early can expire before the scheme starts.
Where the planning permission authorises removal
For the exemption to apply, the removal has to be required to carry out the permitted development. That means the access position shown on the approved plans has to be the access you build. Move the bellmouth 15 metres along the frontage during construction and the exemption no longer covers the length you are taking out.
The planning application therefore needs to fix three things. The exact length of hedgerow to be removed, dimensioned on a plan. The visibility splays that drive that length. And the replacement planting. Visibility is usually what sets the figure, and the geometry comes from the highway authority's standards and the sight distances in Manual for Streets. A 2.4 metre by 43 metre splay on a 30 mile per hour road removes far more hedge than most applicants expect, and the splay has to be kept clear in perpetuity, which rules out replanting inside it.
Where standard trees sit within the hedgerow, they need separate treatment. Any tree with a stem diameter above the threshold in the British Standard for trees in relation to design, demolition and construction should appear in a tree survey, and where a tree preservation order applies the hedgerow exemption does not help you at all. An arboricultural impact assessment covering the hedgerow trees is normal on anything but the smallest access.
Nesting birds and the season
Cutting or removing a hedge between March and August risks an offence under section 1 of the Wildlife and Countryside Act 1981, which protects nests in use or being built. The offence is absolute in the sense that lack of intention is not a defence if a nest is destroyed, and prosecutions do happen.
The practical approach: remove hedgerow outside the breeding season, which in practice means September to late February. Where the programme cannot wait, an ecologist inspects immediately before the works, the inspection is recorded, and any active nest is left with a protective buffer until the young have fledged. That buffer can sit in the middle of your access, so the September start is usually the better plan.
Farmers working under the agricultural management rules have a separate hedge cutting restriction running from 1 March to 31 August, which is worth knowing where the landowner is also farming the field.
Bats, dormice and reptiles use hedgerows as commuting and foraging habitat, so a preliminary ecological appraisal should scope whether species-specific survey is needed. A hedgerow connecting woodland blocks across an otherwise open field is a corridor, and the loss of a 20 metre gap in it reads differently from the loss of 20 metres at the end of a hedge against a road.
Replacement planting and the metric
Hedgerows are handled as a separate module in the statutory biodiversity metric, measured in length rather than area, and the trading rules mean hedgerow loss has to be made good with hedgerow rather than with area habitat elsewhere. A scheme that grubs out 40 metres of species-rich hedge and offers a wildflower meadow in exchange will not balance.
What does balance, usually:
- Replanting an equivalent or greater length of native species-rich hedgerow, outside the visibility splay, in a position shown on the landscape plan.
- Improving the condition of retained hedgerow elsewhere on the site, since condition uplift generates units.
- Gapping up existing hedge lines, which is cost-effective and generally welcomed.
Translocation of hedgerow is sometimes proposed and rarely succeeds at a scale worth the money. Where the hedge has genuine historic value it is better to redesign the access than to move the hedge.
The biodiversity net gain assessment has to be completed by a competent person under the Environment Act 2021 regime, with the biodiversity gain plan approved by the authority before development begins.
The documents to assemble
For an access through a countryside hedgerow, expect to submit a hedgerow assessment against the Schedule 1 criteria with the survey data and historic mapping, a preliminary ecological appraisal, a biodiversity net gain assessment with the hedgerow module completed, a tree survey where standards are affected, an access drawing with dimensioned visibility splays, and a landscape plan showing replacement planting with species mix and protection details.
Where a pond sits near the access, add the newt position, covered in the piece on what to submit when a pond on site may hold newts. Browse the report types to check nothing else on your site triggers a survey.
This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
Do I need a hedgerow removal notice if I have planning permission?
Generally no. Regulation 6 of the Hedgerows Regulations 1997 exempts removal required for carrying out development for which planning permission has been granted. The exemption only covers the removal actually required by the approved scheme, so if you shift the access position on site the exemption no longer covers the extra length taken out.
Does the Hedgerows Regulations procedure apply to my garden hedge?
No. Hedgerows within the curtilage of a dwelling house, or marking its boundary, are excluded from the Regulations. The procedure applies to hedgerows of 20 metres or more, or shorter lengths meeting another hedgerow at both ends, growing on or adjacent to agricultural, forestry or horse breeding land, common land, a local nature reserve or an SSSI.
What makes a hedgerow important?
Both limbs of the Schedule 1 test must be met. The hedgerow must have existed for 30 years or more, and it must satisfy at least one criterion in either the archaeology and history group, such as marking a pre-1850 parish boundary, or the wildlife and landscape group, which counts woody species along 30 metre sections plus associated features.
When can I remove a hedgerow without risking a bird nesting offence?
Outside the breeding season, which in practice means September to late February. Section 1 of the Wildlife and Countryside Act 1981 protects nests in use or being built, and lack of intention is no defence. If the programme cannot wait, an ecologist inspects immediately beforehand and any active nest is left with a buffer until the young fledge.
Can I offset hedgerow loss with other habitat?
Not directly. Hedgerows sit in a separate module of the statutory biodiversity metric, measured in length, and the trading rules mean hedgerow loss has to be made good with hedgerow rather than with area habitat. Replanting an equivalent or greater length outside the visibility splay, improving retained hedge condition and gapping up existing lines are the usual answers.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.