Which Reports Do I Need

Reports needed for a funeral directors in a shop parade

7 min readBy PlanScope Editorial Team

Funeral directing falls within Class E, so a move within the class may need no permission. The preparation room, trade effluent, cortege standing and refrigeration noise are the real issues.

A funeral directors in a shop parade is usually a Class E use, which means the premises question is often simpler than people expect and the operational questions are harder. The direction of funerals was expressly listed in the old Class A1, and since the 2020 amendment to the Use Classes Order the activity sits within Class E, most comfortably as a service appropriate to provide in a commercial, business or service locality. Movement within Class E is not development, so a former shop, bank or office in Class E can often become a funeral directors without a planning application at all.

The part that attracts argument is what happens behind the front office. A chapel of rest, refrigerated storage and a preparation room go beyond a counter service, and that is where the council's interest starts.

Which use class a funeral directors falls into

Three checks before you assume no application is needed.

Check the lawful use of the unit. A unit in Class E can accommodate a funeral directors as a Class E service without a further consent. A unit that is sui generis, such as a former hot food takeaway or a betting office that pre-dates the 2020 changes, cannot, and a change from it needs permission.

Check the conditions on the planning history. Conditions restricting a unit to retail sale of goods, or to a named use, survive the Use Classes Order and will stop an otherwise free movement within Class E. This is the trap that catches operators who rely on class flexibility, so read the decision notices as well as the register entry.

Check whether an Article 4 direction has removed the relevant permitted development rights in the centre. Several authorities have made directions covering ground floor units in designated frontages.

Where the position is uncertain, a Lawful Development Certificate for proposed use under section 192 of the Town and Country Planning Act 1990 is the only formal way to settle it. For a scheme with a preparation room, that certificate is worth the fee, because the composite use may be argued to fall outside the class.

Chapel of rest and preparation facilities

A small chapel of rest used by families for viewings is ancillary to the funeral directing use. It is not a place of public assembly, it has low and irregular occupancy, and it needs no separate classification.

A preparation room is different in kind. It involves refrigerated storage, a sluice or preparation table, a discharge to drainage, clinical waste and mechanical extraction. Councils look at it as an environmental health matter rather than a use class matter, and the requirements that follow are specific.

Drainage from a preparation room is trade effluent. Discharge to the public foul sewer needs the sewerage undertaker's consent under section 118 of the Water Industry Act 1991, and the application has to describe the volume, the composition and any pre-treatment. That consent is separate from planning permission and is not secured by it.

Extraction has to be designed to remove formaldehyde and other agents used in preparation, and to discharge at a point that does not affect flats above or neighbouring windows. A ventilation and extraction statement setting out the duct route, the termination point, the filtration and the discharge velocity is what an environmental health officer will want to see. Clinical and offensive waste storage needs a secure, refrigerated or sealed arrangement and a registered carrier, under the duty of care in the Environmental Protection Act 1990.

Hearse and limousine access and standing

This is the issue the highway authority raises, and it is worth getting ahead of.

A funeral directors needs three separate vehicle movements to work. Collections, often at night or early morning, from homes, hospitals and care homes. Deliveries of coffins and supplies. And the cortege, which forms up outside the premises, waits, and departs as a convoy.

Parades are the worst setting for the third of those. A hearse and two limousines standing on a classified road outside a parade of shops, with mourners boarding from the footway, will draw an objection unless the arrangement is designed. The options are a rear service yard with internal access to the premises, an off-street forecourt where one exists, a loading bay with a defined arrangement, or a cortege management plan that forms the convoy away from the frontage and arrives in sequence.

Set the detail out in a Transport Statement: vehicle dimensions, swept paths for the hearse at the access, where each vehicle stands and for how long, and how mourners reach the vehicles without crossing a live carriageway. Where a new or widened crossover is needed, that is a separate consent from the highway authority under the Highways Act 1980.

Refrigeration plant noise and drainage

Refrigerated storage runs continuously, which makes it the most complained-about element of the whole operation when there are flats above.

Source What the assessment needs
Refrigeration condenser Rating level under BS 4142 against the night-time background measured at night, at the nearest bedroom window
Extract fan Same method, plus a check on tonality from fan blade passing frequency
Structure-borne vibration Anti-vibration mounts, isolated plinth, flexible duct connections where plant is fixed to a party structure
Night collections Hours, vehicle movements and door operation described rather than averaged into a daytime figure

The common failure is a night-time background level estimated from a daytime reading. Residential background sound in a suburban parade falls a long way between 11pm and 3am, and a condenser that passes against a daytime background fails against the real one. A Noise Impact Assessment with unattended monitoring across at least one full night, positioned at the nearest affected window rather than at ground level, is the only version worth submitting where there are flats above.

Vibration from plant mounted on a shared wall or slab is the second issue, and it is not solved by an acoustic enclosure. It is solved by isolation at the fixings.

Frontage treatment and the active frontage policy

Many adopted plans require active frontages in designated centres, with display windows, views into the unit and a lit frontage after dark. A funeral directors needs privacy, which pulls the other way.

The workable answer is a frontage that reads as occupied without exposing the interior. Etched or manifested glazing to a defined height rather than blanked-out panels or vinyl film. A lit display with memorial or floral material. An entrance that is clearly in use. Internal screening set back from the glass rather than fixed to it.

Say in the planning statement which policy you are addressing and how the design responds. An application that ignores the frontage policy invites a refusal reason that is easy to write and awkward to answer at appeal.

Hours and amenity where flats sit above

Residential accommodation above a parade changes what is acceptable, and a set of conditions will follow.

Expect hours limits for the front office, separate provision for out-of-hours collections and returns, limits on deliveries, a noise limit for plant at a defined assessment position, and a requirement that the preparation room extraction operates as approved. Negotiate the collections condition carefully. A funeral director who cannot collect at night cannot do the job, and the right answer is usually an unrestricted collection and return arrangement with controls on how it is done, meaning no reversing alarms, no raised voices, lighting controlled and the vehicle door closed quietly rather than slammed.

A waste and servicing arrangement should cover refrigerated storage, clinical waste collection frequency and where bins stand, which is where a waste management strategy earns its place in the submission.

What to submit

Where an application is needed, the realistic bundle is a Planning Statement covering the use class position and the frontage policy, a Transport Statement with the cortege and servicing arrangement, a Noise Impact Assessment covering plant and night operations, a ventilation and extraction statement for the preparation room, a waste management strategy, existing and proposed floor plans showing the chapel, storage and preparation areas, and elevations showing the frontage treatment.

One practical sequence point. Settle the drainage consent and the extraction design before the fit-out is priced, because retro-fitting a duct route through a parade with flats above is the item that breaks the budget.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. A Lawful Development Certificate is the only formal way to confirm that a use is lawful.

You can browse all 66 report types and start a draft to build the submission. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What use class is a funeral directors?

Class E. The direction of funerals was listed in the former Class A1, and since the 2020 amendment it sits within Class E as a service appropriate to provide in a commercial, business or service locality. Because movement within a class is not development, a Class E unit can often become a funeral directors with no planning application.

Does a chapel of rest need separate permission?

Normally no. A small chapel used by families for viewings is ancillary to the funeral directing use, with low and irregular occupancy, so it needs no separate classification. A preparation room is treated differently, mainly as an environmental health matter covering drainage, extraction, refrigerated storage and clinical waste.

Do I need consent to discharge from a preparation room?

Yes. Discharge from a preparation room is trade effluent, and consent from the sewerage undertaker under section 118 of the Water Industry Act 1991 is required, describing the volume, composition and any pre-treatment. That consent is separate from planning permission and is not granted by it, so apply for both in parallel.

How should cortege standing be dealt with on a parade?

Design it rather than leaving it to chance. Options are a rear service yard with internal access, an off-street forecourt, a defined loading bay arrangement, or a cortege management plan forming the convoy away from the frontage. Show vehicle dimensions, swept paths and how mourners board without crossing a live carriageway.

What noise evidence do flats above require?

Unattended monitoring across at least one full night, at the nearest affected window rather than at ground level, with the refrigeration condenser and extract fan rated under BS 4142 against that measured night-time background. A daytime background estimate will understate the problem, and vibration through a party structure needs isolation at the fixings.

Sources and further reading

funeral directorsclass echange of usetrade effluentplant noiseshop parade

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Which Reports Do I Need

View all →
Which Reports Do I Need7 min read

Reports needed for 10 units on 0.4 hectares

Ten dwellings makes a scheme major even on 0.4 hectares, so affordable housing and the full biodiversity net gain regime apply while the area-based flood trigger does not.

Read article →
Which Reports Do I Need7 min read

Reports needed for a climbing wall in an industrial unit

Indoor climbing is Class E(d) and there is no permitted development route from an industrial unit. Employment land policy, the evening parking peak and impact noise through the party wall decide the application.

Read article →
Which Reports Do I Need8 min read

Reports needed for a sixth form block on a playing field

Building on a school playing field needs Sport England consultation under the DMPO 2015 and separate section 77 consent. The pitch evidence comes before the building evidence.

Read article →
Which Reports Do I Need7 min read

Reports needed for a holiday lodge park on a former quarry

A lodge park on a former quarry needs restoration conditions checked, faces and fill tested for stability, and the habitat that has colonised the site surveyed. This is the evidence base that follows.

Read article →
Which Reports Do I Need7 min read

Reports needed to deck an existing surface car park

Trip generation barely moves when parking goes vertical. Daylight, overlooking, vehicle fire risk, raised lighting and collected drainage are what decide the application.

Read article →
Which Reports Do I Need7 min read

Reports needed for a garden centre cafe and canopy

A cafe reached through the plant area is ancillary. A destination restaurant on an out-of-centre site is not. Here is the document list and the conditions that catch people.

Read article →