Which Reports Do I Need

Reports needed for a boatyard expansion on a tidal river

6 min readBy PlanScope Editorial Team

A tidal boatyard sits in two consenting regimes. Plot mean high and low water first, then build the evidence base around flood levels, hull work noise and dust, antifouling contamination and designated intertidal habitat.

Expanding a boatyard on a tidal river puts the site in two consenting regimes at once, and the first job is to draw the line between them on a plan. Above mean high water springs you are dealing with the local planning authority. Below it you are dealing with the Marine Management Organisation and a marine licence under the Marine and Coastal Access Act 2009. Between mean high water and mean low water both apply, because a local planning authority's area in England extends to the low water mark. The boatyard planning reports follow from where each element of the scheme sits.

Draw that line first and the rest of the evidence base organises itself.

Where planning stops and marine licensing starts

Plot mean high water springs and mean low water springs on the site plan and colour the scheme against them. A new workshop on the hard stands in planning territory alone. A pontoon, a piled finger berth, dredging of the approach channel or the deposit of material below high water needs a marine licence, and may need both consents in the overlap.

Two consequences for programme. Marine licence determination runs on its own timetable and its own consultation, including the navigation authority and the statutory nature conservation body. And the two assessments should be consistent, because an inspector or a licensing officer reading contradictory descriptions of the same works will ask why.

Where a harbour or navigation authority holds powers over the river, its consent is a third strand again. Identify it early and ask what it needs.

Tidal flood risk and finished levels

The yard is in a tidal flood zone and nothing is going to change that, so the strategy is to design for it rather than to argue about it.

A Flood Risk Assessment for a tidal site has to use the Environment Agency's current climate change allowances for sea level rise over the lifetime of the development, which is a different set of figures from the fluvial allowances and is revised periodically. Check the current allowance at the date of the assessment rather than copying one from an earlier report.

One point in your favour: in the flood risk vulnerability classification, docks, marinas and wharves are water compatible development. That matters because the policy response to water compatible uses in a high risk zone is different from the response to housing, and the exception test is generally not engaged. The sequential test still has to be addressed, and the answer for a boatyard is usually straightforward, since the use has to be on the water.

What the assessment then needs to show is finished floor levels for any new building, flood resilient construction below the design level, safe access and egress, a flood warning and evacuation plan covering craft and staff, and the management of materials and fuel stored at ground level.

Noise and dust from hull work and blasting

Hull preparation is the operational issue neighbours raise. Grit blasting, needle gunning, grinding and sanding all generate noise with a character that attracts a correction under the assessment method for commercial sound, and blasting generates dust that can carry paint residues.

A Noise Impact Assessment should separate fixed plant from the hull work itself, measure the existing background over representative periods, and propose limits and hours rather than a description. The usual answer on a constrained site is to require open-air blasting to take place within a tented or boothed enclosure, to set hours that exclude early mornings and Sundays, and to add a verification requirement.

Dust and the particulate content of blast residue belong in an Air Quality Assessment where sensitive receptors are close, with the mitigation drawn from recognised construction and industrial dust guidance: enclosure, damping, sheeting, wheel washing and a monitoring regime with a complaints trigger.

Contamination from antifouling and fuel

Boatyards are classic contaminated land cases, and the sources are predictable: decades of antifouling residue in the hardstanding and the ground beneath it, historic tributyltin use, copper and other biocides, fuel storage, waste oil, and washdown water that was never intercepted.

Start with a Phase 1 desk study covering the site history, the conceptual model and the preliminary risk assessment, then a Phase 2 intrusive investigation where the desk study identifies potential pollutant linkages. Both should follow the recognised British Standard for the investigation of potentially contaminated sites, and national policy places responsibility on the developer with the authority expecting reports prepared by suitably qualified and experienced persons. A Land Contamination Assessment draft is a starting point for that person rather than a replacement for them.

Add the forward-looking controls to the application rather than waiting for the condition: an impermeable washdown pad with interceptor, bunded fuel and chemical storage, a spill response plan, and collection of blast residue for licensed disposal.

Ecology in intertidal habitat and designated sites

Estuaries are heavily designated. Expect some combination of a special protection area, a special area of conservation, a Ramsar site or a site of special scientific interest in or adjoining the river, and expect the scheme to need screening under the Conservation of Habitats and Species Regulations 2017.

Where a likely effect cannot be ruled out, the authority carries out an appropriate assessment, and mitigation cannot be used to screen the effect out. Build the time in.

Survey constraints drive the programme. Overwintering bird surveys run from October to March. Intertidal habitat survey and benthic sampling have their own windows and depend on tides. Lighting of the yard affects foraging and roosting birds and bats, so the lighting design belongs in the ecology discussion rather than as a later detail.

A Preliminary Ecological Appraisal commissioned before the layout is fixed is the single most useful early spend, because moving a pontoon on a drawing costs nothing.

Access and craneage movements

Boat movements are vehicle movements, and some of them are exceptional. A travel hoist crossing a public road, or a craft delivered by low loader, raises the same routing and swept path questions as any oversized load, and the highway authority will want to see them answered.

Deal with: the internal circulation for a hoist and its clearances, the number and timing of craft movements across any public highway, parking for staff, owners and visitors at peak season, and the servicing arrangements for deliveries of materials and collection of waste.

Conditions on hours and open-air works

Expect the permission to be conditioned tightly on the operational side, and negotiate the conditions rather than receiving them:

  1. Hours for hull preparation, often tighter than the hours for the yard as a whole.
  2. A requirement that blasting and spraying take place within an enclosure.
  3. Plant noise limits expressed numerically at the nearest sensitive facade, with post-installation verification.
  4. A surface water and washdown management scheme, with maintenance of interceptors.
  5. External lighting to an approved design, with a curfew.
  6. Storage of craft and materials restricted to identified areas, to protect the flood and visual position.

For a scheme on inland water the constraint profile is different again, and the note on which reports a site beside a canal needs covers that case.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required, and this is general guidance rather than legal advice.

Frequently asked questions

Do I need a marine licence as well as planning permission?

Below mean high water springs, yes, under the Marine and Coastal Access Act 2009. A local planning authority's area in England extends to mean low water springs, so works in the band between the two need both consents. Pontoons, piling, dredging and deposits below high water are the usual triggers.

Does a boatyard need a flood risk exception test?

Generally not. Docks, marinas and wharves are classed as water compatible development in the flood risk vulnerability classification, so the exception test is not usually engaged even in a high risk zone. The sequential test still has to be addressed, and the answer is normally that the use must be on the water.

How is noise from hull blasting assessed?

Separately from fixed plant. Grit blasting, needle gunning and grinding have an acoustic character that attracts a correction under the assessment method for commercial sound, so the assessment should measure the background over representative periods and propose numerical limits and hours rather than a description of the works.

What contamination should a boatyard site investigation look for?

Antifouling residues in the hardstanding and underlying ground, historic tributyltin, copper and other biocides, fuel and waste oil storage, and uncontrolled washdown water. Start with a Phase 1 desk study and conceptual model, then a Phase 2 intrusive investigation where pollutant linkages are identified, following the relevant British Standard.

What ecology surveys will the estuary designation require?

Expect screening under the Conservation of Habitats and Species Regulations 2017 where a special protection area, special area of conservation, Ramsar site or SSSI is in or adjoining the river. Overwintering bird surveys run October to March, and intertidal habitat and benthic work depends on tides, so survey timing drives the programme.

Sources and further reading

boatyardmarine licencetidal flood riskcontaminationwhich reports

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Which Reports Do I Need

View all →
Which Reports Do I Need7 min read

Reports needed for a riding arena with lighting

Keeping horses for riding is not agriculture, so a floodlit arena needs full permission. Here is the evidence base a rural council will look for, and the order to assemble it in.

Read article →
Which Reports Do I Need6 min read

Reports needed for allotments on grazing land

Cultivation on former grazing land is likely to count as agriculture. The structures, hardstanding, parking and new access are what need permission, and ecology plus access evidence decide the application.

Read article →
Which Reports Do I Need6 min read

Reports needed for a doctors' surgery in a converted house

A dwelling to surgery change of use is not permitted development. Parking demand, clinical waste storage, accessible entry and the loss of a residential unit drive the evidence base far more than any building work.

Read article →
Which Reports Do I Need6 min read

Reports needed to floodlight a school playing field

Floodlight columns are development, so permission is needed. The decisive evidence is an obtrusive light assessment against the lighting zone, bat sensitivity along boundary habitat, evening noise and parking demand.

Read article →
Which Reports Do I Need7 min read

Reports needed for a veterinary practice with boarding

Overnight boarding changes a veterinary application. Which reports the mixed use needs, why barking defeats a standard noise calculation, and the conditions to expect.

Read article →
Which Reports Do I Need7 min read

Signage across an industrial or business estate

Advertisement consent across a multi occupier estate is judged only on amenity and public safety. Deemed consent covers signs on business premises but rarely the shared entrance totem.

Read article →