Which Reports Do I Need

Reports needed for allotments on grazing land

6 min readBy PlanScope Editorial Team

Cultivation on former grazing land is likely to count as agriculture. The structures, hardstanding, parking and new access are what need permission, and ecology plus access evidence decide the application.

Turning a grazing field into allotments usually needs planning permission, but not for the reason people expect. The cultivation itself is likely to fall within agriculture, which section 55 of the Town and Country Planning Act 1990 excludes from development. What triggers the application is everything that comes with it: the sheds, the store, the polytunnel, the hardstanding, the parking and the new access. So the allotments planning reports that matter are an ecological appraisal, a short access and parking plan, and a planning statement that separates the use from the structures.

Councils differ on this, and the honest answer is that it is worth asking yours before you design anything.

Whether allotment use needs permission

Section 55(2)(e) takes the use of land for agriculture outside the definition of development, and agriculture is defined in section 336 to include horticulture and market gardens. Growing vegetables on a field that was previously grazed is a move from one agricultural use to another, and on that reading no permission is needed for the growing.

Several authorities take a different view where the land is divided into many small tenancies with individual structures, vehicles and visitors, treating the whole operation as a material change of use. The argument is not about horticulture, it is about intensity and the physical character of the land.

Because the position is uncertain and turns on the facts, the sensible route is an application for a certificate of lawfulness of proposed use under section 192 of the 1990 Act where you believe no permission is needed, or a straightforward change of use application where structures are proposed anyway. A lawful development certificate is the only formal way to confirm that works or a use are lawful, and an officer's informal view is not one.

Sheds, stores and polytunnels as separate development

Even where the growing needs no permission, buildings and structures are operational development in their own right, and no agricultural permitted development right helps because an allotment site is not usually an agricultural unit of the size the relevant part of the General Permitted Development Order requires.

Polytunnels sit in an interesting place. Whether a structure is a building depends on its size, its degree of permanence and its physical attachment to the ground, which is the test the courts have applied for decades. A small seasonal tunnel pegged into soil and removed each winter is arguable. A 30 metre tunnel on a concrete foundation, left up year round, is a building.

Deal with all of it in one application rather than drip-feeding:

  1. A site plan showing plot boundaries, paths and the permitted location and maximum size of individual sheds.
  2. Elevations and a materials note for any communal store, toilet or meeting shelter.
  3. The location, dimensions and intended permanence of any polytunnel.
  4. Any hardstanding, which is engineering operations and counts as development.

Offering a tight site management plan, with shed sizes and materials controlled, usually buys you a simpler permission than leaving it to conditions.

Water supply and drainage on the site

Water is the item most often forgotten until after permission. Mains connection requires an application to the water undertaker and the cost of bringing a supply across a field is rarely small.

Rainwater harvesting from store and shelter roofs reduces the demand and reads well in the application. Abstraction from a stream or borehole needs a licence from the Environment Agency above the daily threshold, and even below it the abstraction should be checked rather than assumed.

Foul drainage only arises if a toilet is proposed. A composting toilet avoids a connection but is still a structure, and the Building Regulations position should be checked separately. Describe the arrangement in the application, because an unexplained small building near a boundary attracts objections.

Access, parking and the lane

Rural allotment sites fail on access more often than on anything else. A gateway designed for a tractor twice a week is not a gateway for 30 plotholders arriving on a Saturday morning.

Show visibility splays measured in both directions against the recorded speed of traffic on the lane, a parking area with a surface that works in winter, turning space so vehicles leave in forward gear, and a passing place if the lane is single track. Where the access is onto a classified road, the highway authority will be consulted and will want detail.

A full transport assessment is disproportionate at this scale. A one-page access and parking plan with dimensioned splays answers the question, and where the highway authority presses for more, a short Parking Survey of the lane at peak times is usually enough.

Agricultural land quality and the loss argument

Policy protects the best and most versatile agricultural land, which means grades 1, 2 and 3a. Officers sometimes raise it on any proposal affecting a field.

The answer here is strong and should be stated rather than assumed: allotments keep the land in food production. Horticulture on grade 2 soil is arguably a higher-value use of it than grazing. Where the authority asks for soil evidence on a larger site, an Agricultural Land Classification survey by a soil scientist is the document, and surveys cannot be done sensibly when the ground is waterlogged, so allow for the season.

On a site of an acre or two, resist the request politely and point to the retained agricultural use.

Ecology and hedgerow retention

Permanent grazing land can be more ecologically valuable than it looks, particularly where it has not been improved, and the hedgerows around it are usually the richest part of the site.

A Preliminary Ecological Appraisal in the growing season identifies whether the sward is species-rich, whether the hedgerows qualify as important under the hedgerow regulations, and whether reptiles, nesting birds or badgers are present. Removing a length of hedge to form an access needs separate notification to the authority under those regulations, and the usual answer is to put the access through an existing gap.

Where planning permission is required, biodiversity net gain will normally apply unless an exemption fits, so the baseline matters commercially as well as ecologically. Allotments can score well on the metric once beds, orchards and wildlife margins are counted, but only if the ecologist is involved before the layout is drawn. A Biodiversity Net Gain Assessment draft is a starting point for the competent person the Environment Act 2021 regime requires, never a substitute for them.

Conditions on structures and hours

Expect a permission that controls the things neighbours worry about:

  1. Maximum shed dimensions, materials and a limit of one per plot.
  2. No residential occupation and no overnight stays, which is the condition that stops an allotment becoming a caravan site.
  3. Hours of use, often dawn to dusk, and a restriction on bonfires.
  4. No commercial sale of produce from the site.
  5. Retention of hedgerows and boundary planting, with a landscape scheme.
  6. Parking and turning to be provided before first use and retained.

Most of these are reasonable and agreeing them early shortens the determination. The one worth negotiating is the hours condition, because a dawn to dusk restriction in midsummer is different from one in December, and a fixed clock time is easier to live with.

Browse the 66 report types to see which documents a small rural application usually needs.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Do allotments need planning permission?

The growing itself is likely to fall within agriculture, which section 55 of the Town and Country Planning Act 1990 excludes from development. But sheds, communal stores, polytunnels, hardstanding, parking and a new access are development in their own right. Some authorities also treat an intensively subdivided site as a material change of use.

Is a polytunnel a building for planning purposes?

It depends on size, permanence and attachment to the ground, which is the test the courts apply. A small seasonal tunnel pegged into soil and taken down each winter is arguable. A long tunnel on a concrete foundation left up year round is a building and needs permission along with everything else on the site.

Will the council object to losing agricultural land?

It may raise the point, and the answer is that allotments keep the land in food production. Horticulture on good soil is arguably a higher-value use than grazing. On larger sites the authority may ask for a soil survey by a soil scientist, which cannot be done sensibly when the ground is waterlogged.

Does biodiversity net gain apply to an allotment scheme?

Where planning permission is required, normally yes, unless an exemption fits. Allotments can score reasonably on the metric once beds, orchards and wildlife margins are included, but only if the ecologist is involved before the layout is fixed. The statutory metric must be completed by a competent person.

What conditions should we expect on an allotment permission?

Maximum shed sizes, materials and one per plot, no residential occupation or overnight stays, hours of use with a bonfire restriction, no commercial sale of produce, retention of hedgerows with a landscape scheme, and parking and turning provided before first use. Negotiate the hours condition for a fixed clock time.

Sources and further reading

allotmentscommunity growingrural planningecologywhich reports

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Which Reports Do I Need

View all →
Which Reports Do I Need7 min read

Reports needed for a riding arena with lighting

Keeping horses for riding is not agriculture, so a floodlit arena needs full permission. Here is the evidence base a rural council will look for, and the order to assemble it in.

Read article →
Which Reports Do I Need6 min read

Reports needed for a boatyard expansion on a tidal river

A tidal boatyard sits in two consenting regimes. Plot mean high and low water first, then build the evidence base around flood levels, hull work noise and dust, antifouling contamination and designated intertidal habitat.

Read article →
Which Reports Do I Need6 min read

Reports needed for a doctors' surgery in a converted house

A dwelling to surgery change of use is not permitted development. Parking demand, clinical waste storage, accessible entry and the loss of a residential unit drive the evidence base far more than any building work.

Read article →
Which Reports Do I Need6 min read

Reports needed to floodlight a school playing field

Floodlight columns are development, so permission is needed. The decisive evidence is an obtrusive light assessment against the lighting zone, bat sensitivity along boundary habitat, evening noise and parking demand.

Read article →
Which Reports Do I Need7 min read

Reports needed for a veterinary practice with boarding

Overnight boarding changes a veterinary application. Which reports the mixed use needs, why barking defeats a standard noise calculation, and the conditions to expect.

Read article →
Which Reports Do I Need7 min read

Signage across an industrial or business estate

Advertisement consent across a multi occupier estate is judged only on amenity and public safety. Deemed consent covers signs on business premises but rarely the shared entrance totem.

Read article →