Which Reports Do I Need

Reports for glamping pods on a working farm

8 min readBy PlanScope Editorial Team

Foul drainage in an unserviced location and the wording of the occupancy condition decide most glamping applications, not the landscape argument owners expect.

Glamping pods on a working farm need planning permission as a change of use of land, and the two issues that decide the application are rarely the ones owners expect. Landscape impact gets the attention, but foul drainage in a location with no mains connection and the wording of the seasonal occupancy condition are what shape the scheme and what the council will argue about. Get those two right and the rest of the evidence base is manageable.

The report pack for a modest site is smaller than most people fear. The risk is submitting the wrong documents and none of the right ones.

Whether the use is a change of use of land

Siting pods on a field is a material change of use from agriculture to tourism accommodation, and a full planning application is needed. Pods are usually not caravans within the statutory definition, so the caravan site licensing route and the exemptions attached to it generally do not apply, though the position depends on the pod's construction and mobility and should be checked rather than assumed.

Two other routes exist and both have limits. The 28 day temporary use right under Class B of Part 4 of Schedule 2 to the GPDO 2015 permits temporary use of land for up to 28 days a year, cumulative across all temporary uses of that land, which suits a trial season rather than a business. And the relaxations introduced for temporary campsite use have their own conditions and time limits, so check the current position before relying on them.

Describe the development precisely. "Change of use of agricultural land to siting of six glamping pods with associated access track, parking, shower building and foul drainage" tells the officer what is proposed and avoids a condition that bars the shower building you forgot to mention.

Landscape and visual information

In open countryside the landscape argument is about whether the development reads as part of the farm or as a holiday park. That is a design question before it is an assessment question.

For a small site in an undesignated landscape, the proportionate evidence is a site plan showing the pods against existing field boundaries and tree cover, elevations with materials and colours stated, and photographs from the public vantage points from which the site is visible, with the pod positions indicated. Where the site is in a National Landscape or a National Park, or close to one, a landscape and visual impact appraisal following recognised guidance is the right level, and the statutory purposes of the designation carry great weight.

Three design moves that work:

  • site pods against existing hedgerows and in the lee of landform rather than in the middle of a field
  • use recessive colours and matt finishes, and specify them, because a condition will require it anyway
  • keep the access track in the existing field pattern and surface it in a material that reads as agricultural

Avoid fencing each pod individually. Domestic-looking subdivision of a field is what turns a landscape officer against a scheme.

Foul drainage and water supply

This is the issue that most often holds up determination. With no mains foul sewer, the options are a package treatment plant with a discharge to ground via a drainage field, a treatment plant with discharge to a watercourse, or a cesspool with tankered removal.

Discharges to ground or to surface water are regulated separately from planning. The general binding rules allow certain small sewage discharges without a permit where the conditions are met, including limits on volume and location, and a permit is needed where they are not. The constraints that bite in practice are the distance to a watercourse, borehole or spring, the suitability of the ground for a drainage field, and whether the site is in a Source Protection Zone or a sensitive catchment.

So the sequence is: percolation testing to the recognised method before you design the layout, then the treatment selection, then the application. Submitting a layout with a drainage field in a location that fails percolation testing means redesigning after the objection arrives.

Water supply needs stating too. A mains connection, a private borehole or a spring each have consequences, and a private supply serving paying guests brings private water supply regulation and testing obligations that are separate from planning. Our checklist for reports on a livestock building on a working farm covers the drainage and effluent questions on the agricultural side of the same holding.

Access, visibility and passing places

Rural accesses are the commonest highway objection on diversification schemes. The farm access that works for a tractor twice a day may not be acceptable for guest cars arriving in the dark.

Evidence Purpose
Visibility splays measured on site, with the recorded traffic speed Shows whether the access meets the standard for the road
Swept path for a car and a service vehicle Shows vehicles can enter and leave in forward gear
Passing place locations on a single-track approach Addresses two-way flow on a narrow lane
Parking layout, one space per pod plus turning Avoids parking on the lane
Trip generation estimate by day and peak Shows the scale of intensification

A transport statement proportionate to the scale is normally sufficient for a handful of pods. Where the approach is a single-track lane with no passing places and poor visibility at the junction, the highway authority may require improvements, and a section 278 agreement for works in the highway takes time and money that should be in the budget from the start.

Ecology on grassland and hedgerows

Even an improved grassland field has an ecological baseline, and mandatory biodiversity net gain applies to most permissions, with the 10 per cent uplift measured in the statutory metric and secured for at least 30 years.

A preliminary ecological appraisal is the starting document: habitat classification, hedgerow condition, an assessment of protected species potential and a recommendation on further survey. On a farm site the likely further work is a reptile survey where there is rough grassland or a rubble pile, a bat assessment where a building is to be converted or lit, and a breeding bird consideration where works fall in the March to August season.

The good news on a field site is that the gain is usually deliverable on site. Enhancing hedgerows, creating a species-rich margin around the pod area and managing a corner of grassland differently can produce the uplift without buying off-site units, and it improves the setting at the same time. A Protected Species Survey requires a suitably licensed ecologist under the Wildlife and Countryside Act 1981 and the Conservation of Habitats and Species Regulations 2017, and the statutory biodiversity metric must be completed by a competent person under the Environment Act 2021 regime, so a drafted report is a starting point for that professional rather than a substitute.

Lighting and dark skies

Lighting is the element guests want and the landscape officer resists. Open countryside is typically an E0 or E1 environmental zone in the Institution of Lighting Professionals framework, with the tightest limits on obtrusive light.

A workable approach, and one worth offering in the application rather than waiting to be asked: no column lighting, low-level bollard or step lighting on the paths only, warm colour temperature, full cut-off fittings with no upward light, and a timer or curfew. Pod interiors should be the main light source, and that is usually what guests actually want.

Where the site is near a hedgerow, treeline or watercourse used by bats, lighting becomes an ecological issue and not merely an amenity one. Specify dark corridors and keep light off the boundary vegetation, and say so in the lighting information.

Seasonal occupancy conditions

The occupancy condition is the most consequential wording on the decision notice, and it is worth engaging with before the officer drafts it.

Authorities impose these conditions to prevent tourism accommodation becoming permanent residential occupation, which would be unacceptable in open countryside. The forms they take:

  1. A holiday occupancy condition limiting use to holiday purposes only, with no person occupying for more than a stated continuous period and no unit used as a sole or main residence.
  2. A seasonal condition closing the site for a defined part of the year, often the winter months.
  3. A register condition requiring an up-to-date record of occupiers to be kept and made available to the authority on request.
  4. A removal condition requiring the pods and associated works to be removed and the land reinstated if the use ceases for a stated period.

Holiday occupancy and register conditions are reasonable and normal. The seasonal closure is the one to negotiate, because a winter closure can remove a significant part of the trading year on a site that works for Christmas and New Year lettings. The planning purpose is served by preventing permanent residence, which the holiday occupancy condition achieves on its own, so argue for that rather than a closed season where the landscape case does not require it.

A planning statement addressing the development plan's rural diversification and tourism policies, with the drainage, access, ecology and lighting evidence cross-referenced, is the heart of the submission. Our checklists for equestrian use in the Green Belt and for a self-build plot on a serviced site cover the comparable evidence questions on constrained rural and unserviced sites.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Do glamping pods need planning permission?

Yes. Siting pods on a field is a material change of use from agriculture to tourism accommodation and needs a full planning application. Pods are usually not caravans within the statutory definition, so caravan site licensing exemptions generally do not apply, although that depends on the pod's construction and mobility and should be checked.

What foul drainage options are available with no mains sewer?

A package treatment plant discharging to ground through a drainage field, a treatment plant discharging to a watercourse, or a cesspool with tankered removal. Small sewage discharges may be allowed under general binding rules where the conditions are met, otherwise a permit is needed. Carry out percolation testing before designing the layout.

What ecology work is needed for a field site?

A preliminary ecological appraisal first, covering habitat classification, hedgerow condition and protected species potential. Likely follow-on work is a reptile survey where rough grassland exists, a bat assessment where a building is converted or lit, and breeding bird consideration for works between March and August. Biodiversity net gain applies to most permissions.

Can I have external lighting at a glamping site?

Keep it minimal. Open countryside is typically an E0 or E1 environmental zone with the tightest obtrusive light limits, so offer low-level path lighting only, warm colour temperature, full cut-off fittings and a curfew, with pod interiors as the main light source. Keep light off boundary vegetation used by bats.

What does a holiday occupancy condition say?

It typically limits use to holiday purposes, prevents any person occupying for more than a stated continuous period and prevents a unit being used as a sole or main residence, often with a requirement to keep a register of occupiers. Its purpose is to stop tourism accommodation becoming permanent residential use in open countryside.

Can I resist a condition closing the site in winter?

It is worth arguing. The planning purpose of preventing permanent residence is achieved by the holiday occupancy condition alone, so a closed season is only justified where the landscape or ecological case requires it. Make the argument in the application rather than after the condition has been drafted into the notice.

Sources and further reading

glampingfarm diversificationchange of usefoul drainageoccupancy conditionsrural

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Which Reports Do I Need

View all →
Which Reports Do I Need7 min read

Reports needed for a padel court on a sports ground

A padel court application turns on acoustic evidence for impulsive play noise and a lighting assessment against obtrusive light limits. Commission both before the layout is fixed.

Read article →
Which Reports Do I Need6 min read

Documents for a cemetery extension onto adjoining land

Extending a burial ground onto the next field is governed by groundwater risk and burial need, not floorspace thresholds. Here is the document set an application should lead with.

Read article →
Which Reports Do I Need7 min read

Documents for an equestrian cross-country course

Keeping horses for recreation is not agriculture, and course building is engineering work. Here is the document list for a cross-country course, driven by land use, earthworks and horsebox access.

Read article →
Which Reports Do I Need8 min read

Evidence for an essential rural worker's dwelling

The functional and financial tests decide an essential rural worker application. Here is what the agricultural appraisal, the accounts and the accommodation search have to demonstrate.

Read article →
Which Reports Do I Need8 min read

Supporting documents for residential moorings

Changing moorings from leisure to residential use is a material change of use. Here is the document set councils ask for, from foul drainage afloat to flood evacuation and navigation authority consent.

Read article →
Which Reports Do I Need7 min read

Evidence for a rural broadband mast on high ground

A hilltop mast is assessed on siting and appearance alone. The alternatives evidence, the photomontages and the access track details decide it inside the 56 day period.

Read article →