Which Reports Do I Need

Which reports two houses in a back garden need

7 min readBy PlanScope Editorial Team

Two houses down a long garden are decided on the drive and the overlooking. Get the access geometry and the separation distances right before anything else.

Backland development is decided on access geometry and on the relationship with the rear elevations and gardens surrounding it, so the reports needed for backland development are weighted differently from a street-fronting plot of the same size. Two houses at the bottom of a long garden, reached by a drive between two existing properties, will be refused on the drive and the overlooking long before anyone argues about design.

Residential gardens are not previously developed land in national policy terms, which removes one argument applicants sometimes expect to make.

Access, visibility and the highway evidence

The drive is the first thing to resolve because everything else depends on it. A shared access serving two additional dwellings has to work for cars, refuse collection, emergency vehicles and pedestrians, usually within a width set by whatever gap exists between two houses built in the 1930s.

The highway authority will look for:

  1. Visibility splays at the junction with the public highway, set from the stopping sight distance for the road's speed, which on a 30 mph residential road is commonly taken as around 43 m.
  2. An access width that allows two vehicles to pass where the drive is long, or a passing place with intervisibility along its length.
  3. Turning provision so vehicles leave in forward gear where the drive is long or the highway is busy.
  4. A crossover, formed under the relevant highway agreement, with the footway construction upgraded.
  5. Fire appliance access, which under Building Regulations guidance means a vehicle route to within 45 m of all points inside each dwelling.

If the drive cannot achieve those, the scheme does not work, and no amount of supporting evidence changes that. A short transport statement setting out the geometry, the trip generation and the parking provision is usually enough at this scale, and it should be prepared before the layout is fixed rather than afterwards.

Refuse is the detail that catches people out. Councils publish carry distances for bin collection, and where a bin store sits beyond that distance from the highway a presentation point has to be shown on the plan, usually at the head of the drive, with a surface and a screen.

Overlooking, privacy and separation distances

Backland plots sit inside a ring of rear gardens and rear elevations, so the scheme is visible from more private windows than a street plot would be.

Most councils apply separation standards through a householder or residential design guide. The familiar rules of thumb are around 21 m between directly facing habitable room windows and around 12 m from a habitable room window to a blank elevation or a boundary, though these vary by authority and are guidance rather than statute. Read the local document before drawing.

Single storey or one and a half storey forms help here more than any mitigation. So does turning the plan so that the main glazing faces along the plot rather than across it, and putting bathrooms, stairs and stores on the elevations facing existing gardens.

Where windows cannot be avoided, obscure glazing with restricted opening is the standard answer, specified by privacy level and fixed by condition. Roof terraces and balconies on a backland plot are usually a refusal reason rather than a negotiation.

Trees on the plot and on neighbouring land

Long gardens contain mature trees, and the trees that matter are often not on your land.

Check for Tree Preservation Orders and conservation area status first. Then survey the trees under BS 5837:2012 and plot the root protection areas, which have a radius of twelve times the stem diameter measured at 1.5 m above ground. A BS 5837 tree survey covering trees on neighbouring land within influencing distance is standard practice, and the survey has to include them because their root protection areas will cross your boundary.

Two constraints follow. The drive itself frequently runs through the root protection area of a boundary tree, which means a no-dig construction with a cellular confinement system rather than a conventional build-up. And foundation design near mature trees on shrinkable clay has to account for heave and shrinkage, which drives depth and cost.

Future pressure for tree removal is a material consideration in its own right. Siting a house so close to a large oak that occupants will apply to fell it within five years is an argument officers make, and it is a fair one.

Drainage where the site sits behind existing houses

Backland sites are frequently landlocked for drainage as well as access. The existing surface water and foul connections run through gardens that belong to someone else.

Work through the hierarchy honestly. Infiltration first, tested by percolation testing at the right time of year rather than assumed from geology. Then a watercourse, if one is reachable without crossing third-party land. Then a surface water sewer, then a combined sewer as the last option, each subject to the undertaker's agreement.

A Drainage Strategy for two dwellings does not need to be long, but it does need percolation test results, a levels survey, and evidence of the connection enquiry. Where the foul connection requires a pumped system or a connection through land in other ownership, the legal route has to be identified before the application, because a scheme that cannot drain cannot be built.

Groundwater is worth checking too. Long gardens in river valleys often sit over a high water table, which removes infiltration as an option and can make a basement or deep foundation impractical.

Ecology on long established gardens

A garden that has been undisturbed for decades supports more than an open field does. Mature trees hold roosting features for bats. Outbuildings and log piles support hedgehogs and reptiles. Hedges and shrubs hold nesting birds between March and August.

A Preliminary Ecological Appraisal is the proportionate starting point. It identifies habitats, records potential for protected species, and says whether further survey is needed and when. If mature trees with roosting features are to be felled, a bat survey follows, and those surveys run from May to September.

Biodiversity net gain applies. Two new dwellings are not householder development, so the householder exemption does not help, and a garden with lawn, hedge and trees will comfortably exceed the de minimis threshold. Budget for a habitat baseline survey, a metric calculation and a gain plan approved before development starts, and note that the statutory metric is work for a competent person.

Refuse, servicing and emergency access

Pull these together on one drawing rather than leaving them across three. The plan should show the bin store, the presentation point, the carry distance, the fire appliance route with the 45 m radius marked, the visibility splays, parking spaces to the council's standard with dimensions, and cycle storage.

Officers assess backland schemes on whether daily life works on the plot. Where does a delivery van stop. Where does a visitor park. How does someone carry shopping from the car in the rain. A layout that answers those questions on the drawing removes most of the objections before they are written.

The supporting statement that ties it together

For two dwellings the statement is short and should be specific. Set out the site history, the access solution with its geometry, the separation distances achieved to each surrounding property measured on a plan, the tree constraints and how the layout responds, the drainage route, and the ecology position with its programme.

Address the objections you know are coming: overlooking, the drive, construction disturbance, and the loss of garden character. Saying what you have done about each is more persuasive than saying the scheme complies with policy.

Where the context is a block rather than a garden, the constraints shift, and our guide to the reports needed to add storeys to an existing block covers that case.

Browse the 66 report types to see which of these a backland site is likely to need.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is a garden previously developed land?

No. National policy excludes land in built-up areas such as residential gardens from the definition of previously developed land. That means a backland scheme cannot rely on brownfield policy support, and the assessment turns instead on the character of the area, the effect on neighbouring amenity and whether the access and servicing arrangements work.

How wide does a shared drive need to be?

There is no single national figure, because highway authorities set their own standards. The practical tests are whether two vehicles can pass or whether intervisible passing places are provided on a long drive, whether vehicles can leave in forward gear, and whether a fire appliance can reach within 45 metres of all points inside each dwelling under Building Regulations guidance.

What separation distance is needed between houses?

Most councils apply guidance of around 21 metres between directly facing habitable room windows and around 12 metres from a habitable room window to a blank elevation or boundary. These are local design guide figures rather than statutory standards and they vary between authorities, so check the adopted document before fixing a layout.

Does biodiversity net gain apply to two houses in a garden?

Yes, in almost all cases. Two new dwellings are not householder development, so the householder exemption does not apply, and an established garden with lawn, hedges and trees will exceed the de minimis threshold of 25 square metres of habitat and 5 metres of linear habitat. Budget for a baseline survey, a metric calculation and an approved gain plan.

Do I need a survey of trees on my neighbour's land?

If they are within influencing distance, yes. Root protection areas under BS 5837:2012 have a radius of twelve times the stem diameter and routinely cross boundaries, so a survey confined to trees within the red line will miss constraints affecting the drive and the foundations. Check for Tree Preservation Orders and conservation area status at the same time.

Sources and further reading

backlandgarden developmentaccessseparation distancestree surveydrainage

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Which Reports Do I Need

View all →
Which Reports Do I Need6 min read

Reports for a traveller site with four pitches

A four pitch traveller site is a minor application with a major policy test. Need evidence, pitch separation and flood vulnerability decide most of these cases.

Read article →
Which Reports Do I Need7 min read

Reports for a micro hydro scheme on a weir

Micro hydro at a weir needs planning permission plus abstraction, impoundment and flood risk permits. The fish pass is often the costliest item, and it has to be settled before the drawings.

Read article →
Which Reports Do I Need7 min read

Reports for a student accommodation scheme of 200 beds

A 200 bed student scheme is a major application with two documents that have no equivalent on a standard residential pack: the institutional need case and the student management plan.

Read article →
Which Reports Do I Need7 min read

Reports needed for a church hall replacement

Rebuilding a church hall means answering three questions at once: the community facility replacement test, the setting of the adjoining listed church, and what lies under a churchyard.

Read article →
Which Reports Do I Need7 min read

Consents for a scaffold gantry over the public highway

Hoardings and scaffolds sit inside Part 4 permitted development, but the licences that control them come from the highway authority under the Highways Act 1980, and hoarding graphics are a separate advertisement consent.

Read article →
Which Reports Do I Need7 min read

Reports needed for a stadium floodlight upgrade

Replacing stadium floodlights is rarely maintenance. The documents that decide the application are an obtrusive light assessment for the right environmental zone, an ecology appraisal and a structural check on existing columns.

Read article →