Councils and sewerage undertakers expect foul and surface water to be separated on a conversion. On an older building served by a combined drain, partial separation with a stated reason is usually the honest answer.

Separating foul and surface water on a conversion is expected by almost every local planning authority and by every sewerage undertaker, and on a Victorian building served by a single combined drain it is often only partly achievable. The sequence that works is to survey what is there, establish what the receiving sewer actually is, then separate as much as the site allows and explain the rest. Designing a theoretical separated system before anyone has lifted a manhole cover wastes money.

The expectation comes from two directions. Approved Document H of the Building Regulations sets a hierarchy for surface water disposal, to a soakaway first, then a watercourse, then a sewer. Undertakers resist new surface water connections to combined sewers because that water ends up at the treatment works or in a storm overflow.

Why separation is asked for on conversions

A conversion usually increases foul load and changes the roof and hard surface arrangement at the same time. Turning a house into four flats multiplies the sanitary appliances. Adding a rear extension and a bin store adds impermeable area.

If both go into the same combined drain, the conversion makes the downstream capacity problem worse on two counts. Separating the surface water removes the part that is easiest to deal with on site and the part that causes the biggest peak.

There is a water quality reason too. Combined sewers overflow in heavy rain, and every litre of clean roof water kept out of them is a litre that does not contribute. Councils increasingly reflect that in their validation requirements, and the lead local flood authority will comment on the drainage approach even on minor applications in a critical drainage area.

Survey before you design

The existing private drainage on an older building is rarely as recorded. Branches have been added, gullies have been connected to whatever was nearest, and previous extensions have built over runs that nobody can now find.

Commission a CCTV survey with a drainage plan as the output, not just a video file. The survey should establish the layout and gradients, the material and condition of each run, the position of the boundary with the public sewer or lateral drain, and whether any misconnections exist. Dye or tracing tests resolve the ambiguous connections.

Two findings change the scheme. A collapsed or heavily root-damaged run means repair or replacement is happening anyway, which is the least costly moment to separate. And a run that crosses beneath a neighbouring property, which is common in terraces, may mean the practical separation point is inside your building rather than in the yard.

Record the invert levels. Separation is a gravity problem, and a new surface water run that cannot reach its outfall without a pump is a maintenance liability for the life of the building.

Where a combined public sewer limits the benefit

Here is the part that surprises people. If the only receiving sewer is combined, separating foul and surface water within the site and then recombining them at the connection achieves very little hydraulically.

It is still worth doing, for three reasons. It future-proofs the building for the day the network is separated. It lets you deal with some of the surface water on site, through a soakaway, permeable paving or a water butt arrangement, before anything reaches the sewer. And it satisfies the undertaker and the council, who will ask for it regardless.

What it does not do is justify claiming a betterment that the hydraulics do not deliver. Establish the sewer type from the undertaker's records, which you obtain through a drainage and water enquiry, and describe the position honestly in the drainage statement. An overstated claim is the kind of thing that unravels at the discharge of conditions stage.

Partial separation and what it achieves

On most conversions the answer is partial separation, and the useful version is to take the new and the easy areas out of the combined system first.

  • New roof areas from an extension or dormer to a soakaway or to a separate surface water run.
  • Rear yard and parking areas to permeable paving with a sub-base reservoir.
  • Existing rear roof slopes, where the downpipes are accessible and a route to a soakaway exists.
  • Front roof slopes and the front yard last, because the route usually crosses under the building.

Soakaway feasibility rests on infiltration testing and on groundwater levels, and the recognised design method is set out in the BRE soakaway digest. Test before you commit, because clay subsoils and high water tables defeat infiltration more often than developers expect. Where infiltration fails on part of the site, our note on managing runoff on a steeply sloping site covers the alternatives in more detail, and the rainfall data you use to size any storage should follow the approach in our note on which rainfall dataset to cite.

Foul capacity, and the question the undertaker asks

Increasing the number of dwellings raises the foul flow, and the undertaker may need to confirm that the receiving network has capacity. A pre-development enquiry is the route, and on larger conversions the answer can involve off-site reinforcement with its own programme.

A Foul Sewage Assessment is the document that sets out the proposed foul arrangement, the estimated flow, the point of connection and the undertaker's response. On a small conversion it can be short. On a conversion of a large commercial building into flats it is the document that stops the application stalling at consultation.

Pumped foul arrangements for basement flats deserve a mention in the statement, with the pump station, its emergency storage and its maintenance responsibility identified. Councils have become more careful about these since basement conversions became common.

Connections, build over and the consents nobody budgets for

Three separate approvals sit outside the planning permission and get forgotten.

  1. A connection to a public sewer, applied for under section 106 of the Water Industry Act 1991. The right to connect is not unconditional, and the undertaker can refuse on grounds including the mode of construction and the condition of the drain.
  2. A build over or build near agreement where the works are over or close to a public sewer or lateral drain. Since the 2011 transfer of private sewers, many runs that look private are public, and an extension across one needs the undertaker's agreement.
  3. Any discharge to a watercourse, which needs the consent of the riparian owner and may need land drainage consent from the lead local flood authority or the Environment Agency.

Each has a lead time. Build over agreements in particular can take longer than the planning application, and starting them after consent is a scheduling error rather than a prudent sequence.

What the drainage statement should conclude

Keep it short and make it answer the question. A Drainage Strategy for a conversion should state the existing arrangement as surveyed, the sewer type and point of connection confirmed by the undertaker, the proposed foul arrangement with estimated flows, the proposed surface water arrangement with the extent of separation achieved and the reason for any part not separated, infiltration test results where a soakaway is proposed, and the consents still to be obtained.

The honest conclusion on many conversions is partial separation with a stated reason. Officers accept that. What they do not accept is a statement claiming full separation on a building where the front elevation drains under the party wall to a combined sewer in the street, because the first contractor on site will find it and the discharge of conditions will fail.

This is general guidance rather than legal advice. Check the requirements with your local planning authority, your sewerage undertaker or a qualified professional before relying on it.

Enter your postcode on PlanScope to see which drainage and conversion documents your building needs.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is separation worth doing if the public sewer is combined?

Hydraulically it achieves little if the flows recombine at the connection, but it is still expected. It future-proofs the building for later network separation, it lets you deal with some surface water on site through a soakaway or permeable paving, and both the council and the undertaker will ask for it regardless of the sewer type.

What survey should I commission first?

A CCTV survey producing a drainage plan rather than just a video file. It should establish layout and gradients, material and condition of each run, the boundary between private drain and public sewer or lateral drain, and any misconnections. Dye or tracing tests resolve ambiguous connections, and invert levels matter because separation is a gravity problem.

Do I need the water company's agreement as well as planning permission?

Usually yes, and often more than once. A connection to a public sewer is applied for under section 106 of the Water Industry Act 1991, and building over or close to a public sewer or lateral drain needs a build over or build near agreement. Since private sewers transferred in 2011, many runs that appear private are public.

How do I know whether a soakaway will work?

By infiltration testing on site and by establishing groundwater levels, using the design method in the BRE soakaway digest. Clay subsoils and high water tables defeat infiltration far more often than developers assume, so test before committing the design. Where infiltration fails on part of the site, attenuation or permeable paving with a lined sub-base are the alternatives.

Will converting a house into flats need a foul capacity check?

Often. More dwellings means more sanitary appliances and a higher foul flow, and the undertaker may need to confirm network capacity through a pre-development enquiry. On larger conversions the answer can involve off-site reinforcement with its own programme, which is a reason to raise the enquiry before the application rather than after consent.

Sources and further reading

drainageconversionfoul watersurface watersoakawaybuild over

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Flood, Drainage and SuDS

View all →
Flood, Drainage and SuDS7 min read

Trash screen blockage and the scenario the model must test

A trash screen is both a safeguard and the component most likely to fail during a storm. The flood model has to test the blocked condition and show where the water goes.

Read article →
Flood, Drainage and SuDS7 min read

Infiltration drainage where the ground is contaminated

Clean water entering contaminated soil becomes a flushing mechanism towards groundwater. That is why the drainage hierarchy and groundwater protection pull in opposite directions on brownfield sites.

Read article →
Flood, Drainage and SuDS7 min read

Attenuation beneath a car park: loading and access

Below ground attenuation under a car park has to carry vehicle loads and stay maintainable for decades. Most failures on these schemes are maintenance problems created at design stage.

Read article →
Flood, Drainage and SuDS7 min read

Raising ground levels and the displacement objection

Raising a building platform above the flood level removes storage the river still needs. Here is when that is acceptable, what conditions follow and the alternatives.

Read article →
Flood, Drainage and SuDS7 min read

Floodplain compensation storage and level for level

Balancing volumes is not enough. Floodplain compensation has to replace storage at the same elevations, connected to the same reach, and be secured on land you control.

Read article →
Flood, Drainage and SuDS7 min read

Wet pond or dry basin: choosing between them

A retention pond and a dry detention basin do the same hydraulic job. The choice turns on treatment performance, water balance, aerodrome safeguarding and who maintains it.

Read article →