Glossary

Specific sound level

7 min readBy PlanScope Editorial Team

The specific sound level is the contribution of the source alone, not what the meter reads. How BS 4142 defines it, how it is determined and where it is misused.

The specific sound level is the equivalent continuous A-weighted sound pressure level produced by the source under investigation, at the assessment position, over the reference time interval. In BS 4142:2014+A1:2019 it is written as the specific sound level and the source itself is the specific sound source. It is not the ambient level, it is not the rating level, and it is not what a sound level meter reads while the source is running.

That last distinction causes more disputes than any other term in the standard, because what the meter reads is ambient sound: the source plus everything else.

What the term means

Three definitions have to sit together.

Ambient sound is the totally encompassing sound in a situation at a given time, from all sources near and far. Residual sound is what remains at the assessment position when the specific sound source is suppressed. The specific sound level is the contribution of the source alone, expressed as an equivalent continuous A-weighted level over the reference time interval.

The reference time interval is fixed by the standard: one hour during the day, taken as 07:00 to 23:00, and 15 minutes at night, 23:00 to 07:00. Those intervals are not negotiable and a level measured over five minutes during the day is not a specific sound level for the purposes of the standard.

The background sound level is a different quantity again, measured as the A-weighted level exceeded for 90 per cent of the time interval, and it describes the residual sound rather than the source.

Where it comes from

BS 4142 is a British Standard for methods of rating and assessing industrial and commercial sound. It is not statute and it is not national planning policy, but it is the method environmental health officers apply in England when assessing plant, machinery and commercial activity, and national noise guidance expects adverse effects to be identified by reference to an appropriate assessment method.

The standard applies to sound of an industrial or commercial nature. It expressly excludes the voices of people, so patron noise outside a bar, children in a playground and spectators at a sports ground all fall outside its scope, however loud they are. Applicants who present a BS 4142 assessment as the answer to a patron noise objection have answered a question nobody asked.

It also excludes recorded or amplified music in some contexts and sound from transportation on public roads and railways, which have their own methods.

How the specific sound level is established

Four routes are recognised, in rough order of preference.

  1. Direct measurement where the source can be run and the residual sound is low enough that the source dominates.
  2. Measurement of ambient sound with the source running, then measurement of residual sound with it suppressed, then logarithmic subtraction of one from the other.
  3. Measurement at a position closer to the source, where it dominates, then calculation of the level at the assessment position using a propagation method.
  4. Calculation from manufacturer sound power data in octave bands, using a recognised propagation method, which is the usual approach for plant not yet installed.

Each route has a trap. Subtraction becomes unreliable where the difference between ambient and residual is small, and the standard treats a difference of less than about 3 dB as an unreliable basis for subtraction. Propagation from manufacturer data depends on directivity, ground effects and barriers, all of which have to be stated. And sound power data given as a single A-weighted figure cannot support an octave band calculation.

How it is used in practice

The specific sound level is an intermediate quantity. It becomes the rating level once corrections for acoustic character are added, and it is the rating level that is compared with the background sound level.

The corrections are where the judgement sits. Tonality attracts up to +6 dB depending on how perceptible the tone is, impulsivity up to +9 dB, and a further +3 dB where the sound is readily distinctive against the residual acoustic environment. The excess of the rating level over the background then indicates the likely impact, with around +10 dB taken as an indication of a significant adverse effect, +5 dB as an indication of an adverse effect, and a rating level at or below background suggesting a low impact depending on context.

Part-time operation matters. Where the source runs for only part of the reference time interval, the specific sound level is the level averaged over the whole interval, so a plant item running for 15 minutes in an hour produces a lower specific sound level than the same item running continuously. Stating the on-time is therefore part of stating the specific sound level.

A worked illustration

Illustrative example, using round numbers to show the method rather than any real site. A condenser is to be installed on a flank wall. Measured ambient sound at the nearest facade with the existing plant running is 48 dB LAeq over one hour, and residual sound with everything switched off is 45 dB LAeq over the same interval.

Logarithmic subtraction of 45 from 48 gives a specific sound level of about 45 dB. The difference between ambient and residual is 3 dB, which is the point at which subtraction becomes unreliable, so the better course here is to measure closer to the plant and propagate, or to calculate from sound power data.

Suppose the calculated specific sound level at the facade is 42 dB, the fan tone is clearly perceptible and attracts a +4 dB correction, and the measured background is 38 dB LA90. The rating level is 46 dB, an excess of 8 dB over background, which points towards an adverse effect and probably towards mitigation. Change the fan to a variable speed unit, the tone becomes just perceptible at +2 dB and the level drops, and the conclusion changes.

Where the term is misused

Six recurring errors, all of which a reviewer should pick up.

  • Reporting the ambient level as the specific sound level, which overstates the source.
  • Reporting the specific sound level as the rating level, which omits the character corrections and understates the effect.
  • Using LAmax or a short LAeq sample instead of the reference time interval.
  • Subtracting residual from ambient where the difference is too small to support it.
  • Ignoring part-time operation, or conversely applying an on-time correction to plant that runs continuously.
  • Mixing free-field and facade measurement conventions without stating which has been used, which shifts the answer by around 3 dB.

A Noise Impact Assessment should state, for every figure it reports, which quantity it is, how it was determined, over what interval and at what position. An assessment that reports a single number without that frame cannot be checked, and an officer who cannot check it will ask for it again.

Ambient, residual and background all describe the acoustic environment rather than the source. Rating level is the specific sound level plus corrections. Internal noise levels in habitable rooms are dealt with by a different standard, and residential development exposed to existing noise is assessed through planning and noise guidance rather than through BS 4142.

The definitions in this note are summaries. The operative text is the standard itself, available from the standards body, and the terminology has been revised between editions, so cite the edition and the amendment when you use it. The parallel discipline of lighting has its own defined quantities, set out in the note on the upward light ratio and the control of sky glow.

PlanScope drafts the structure, the policy framing and the narrative of a noise assessment for a qualified acoustician to complete and review, with site-specific measurements flagged as outstanding rather than assumed. You can browse the 66 report types or enter a postcode on PlanScope to see which ones a site needs.

This is general guidance, not legal advice, and it is a summary of a technical standard rather than a substitute for it. For specialist technical reports, qualified professional input may be required. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What is the specific sound level?

The equivalent continuous A-weighted sound pressure level produced by the source under investigation, at the assessment position, over the reference time interval defined in BS 4142:2014+A1:2019. It is the contribution of that source alone, so it is not the same as the ambient level measured while the source is running.

What are the reference time intervals?

One hour during the day, taken as 07:00 to 23:00, and 15 minutes at night, 23:00 to 07:00. A level measured over a shorter period is not a specific sound level for the purposes of the standard, and an assessment that reports a five minute daytime sample will be queried on that basis alone.

How is it different from the rating level?

The rating level is the specific sound level plus corrections for acoustic character: up to +6 dB for tonality, up to +9 dB for impulsivity, and +3 dB where the sound is readily distinctive against the residual environment. It is the rating level, not the specific sound level, that is compared with the background.

When is logarithmic subtraction unreliable?

Where the difference between the measured ambient sound and the measured residual sound is small. The standard treats a difference of less than around 3 dB as an unreliable basis for subtraction. Measure closer to the source and propagate, or calculate from octave band sound power data, instead.

Does part-time operation change the figure?

Yes. The specific sound level is averaged over the whole reference time interval, so plant running for 15 minutes in an hour produces a lower figure than the same plant running continuously. Stating the on-time is part of stating the level, and omitting it is a common source of disagreement.

Does BS 4142 cover noise from people?

No. The standard addresses sound of an industrial or commercial nature and expressly excludes the voices of people, along with transportation sound on public roads and railways. Patron noise, playground noise and spectator noise need a different approach, so a BS 4142 assessment does not answer those objections.

Sources and further reading

bs 4142acousticsnoiseglossaryrating level

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Glossary

View all →
Glossary8 min read

Hope value and how planning status affects land value

Hope value is the slice of a land price that reflects the prospect of future planning permission. Allocation in a local plan usually moves it more than the permission itself.

Read article →
Glossary7 min read

Ransom strips and severance in planning terms

Permission does not confer a right to build. What a ransom strip is, how severance drives its retention, and the certificates, conditions and checks that follow.

Read article →
Glossary7 min read

Purchase notices and blight notices distinguished

Both notices force a public body to buy. One follows a planning decision, the other a public scheme, and the tests, recipients and timetables are entirely different.

Read article →
Glossary7 min read

Extant planning permission and how to keep it alive

A permission is extant while it can still be lawfully implemented. Here are the section 91 and 92 time limits, what counts as a material start, and the options once a consent has gone.

Read article →
Glossary6 min read

Design review panel and its weight

Panel reports are advice, not decisions. What gives them weight is independence, composition and whether the scheme in front of the council is the one the panel saw.

Read article →
Glossary6 min read

Open book viability appraisal

Open book means the authority and the public see your inputs. National guidance expects publication, redaction is the exception, and review mechanisms capture what the appraisal got wrong.

Read article →