Glossary

Upward light ratio and the control of sky glow

7 min readBy PlanScope Editorial Team

Upward light ratio is the proportion of a lighting installation's output emitted above the horizontal, and it is the sky glow control in planning. What it measures, what it misses, and how the environmental zone decides the limit.

Upward light ratio, usually written ULR, is the proportion of the total light output of a lighting installation that is emitted above the horizontal, expressed as a percentage. It is the control on sky glow in planning terms, and it is the figure a case officer or environmental health officer will look for first in a lighting assessment. Zero per cent means nothing goes up. Fifteen per cent means a sixth of the light your scheme produces is lighting the sky.

The practical significance is simple. In the darkest environmental zones the permitted ratio is zero, which rules out any luminaire tilted above the horizontal and rules out most decorative lanterns. In a town centre the limit is far looser.

What the ratio measures, and what it misses

ULR is calculated for the installation as it will actually be mounted: upward luminous flux divided by total luminous flux from all luminaires in the scheme. Tilt matters, because a flat-glass luminaire with no upward output when mounted horizontally starts emitting above the horizontal as soon as it is angled to improve uniformity across a car park.

What ULR does not capture is the light that goes up after bouncing off the ground surface. Sky glow has two components: the direct upward flux, which ULR measures, and the reflected component from lit surfaces, which it does not. A scheme with a ULR of zero that floods a pale concrete yard to 50 lux still produces sky glow, and an officer who understands lighting will say so. That gap is the single most useful thing to know about the metric.

Where the definition comes from

The ratio is a lighting engineering term rather than a planning one. In planning practice it is applied through the Institution of Lighting Professionals guidance on the reduction of obtrusive light, usually referred to as GN01, which sets limits for sky glow, light intrusion into windows, luminaire intensity and building luminance by environmental zone. Councils cite that guidance in supplementary planning documents and in consultee responses, and acousticians will recognise the structure: it works the same way as the zone-based approach to noise criteria, where the baseline decides the limit rather than the absolute figure.

National policy supports the use of it. The National Planning Policy Framework asks that the impact of light pollution on local amenity, dark landscapes and nature conservation be limited, and Planning Practice Guidance on light pollution explains the considerations a decision maker weighs. Verify the current Framework edition and policy code on gov.uk, because the chapter structure was reorganised in August 2026.

Separately, artificial light emitted from premises so as to be prejudicial to health or a nuisance is a statutory nuisance under the Environmental Protection Act 1990, as amended by the Clean Neighbourhoods and Environment Act 2005, subject to exemptions for certain premises including some sports facilities and transport uses. That is enforcement rather than planning, and it bites after you open. Both matter, because a lighting scheme approved on paper can still generate a complaint and an abatement notice.

Environmental zones, and why your site's zone decides the answer

GN01 divides the country into five environmental zones, from protected dark areas through intrinsically dark landscapes, low district brightness rural areas and suburban areas to urban centres with high district brightness. Each zone has its own limits, and the limits tighten sharply as the baseline darkens.

Zone character What it typically covers ULR position
Protected dark areas Dark sky reserves and observatory sites No upward light permitted
Intrinsically dark National Parks, National Landscapes, remote countryside No upward light permitted
Low district brightness Rural villages and their surroundings A low percentage, set in the guidance
Medium district brightness Suburban areas A moderate percentage
High district brightness Town and city centres The most permissive percentage

Take the exact percentages from the current edition of GN01 rather than from an older summary, because the guidance has been revised and the figures in circulation are not always the current ones.

The zone is not yours to choose. It is a judgement for the authority, usually informed by a supplementary planning document, and the officer will reject an assessment that has quietly assigned a suburban zone to a village on the edge of a National Landscape. Ask the authority in writing which zone it applies before the design is fixed. Getting this wrong is the most expensive error in the process, because a zone change can mean different columns, different optics and a different layout.

How the figure is produced

In practice a lighting designer models the scheme and reports the ratio from the calculation. For the report to be checkable it has to show its working:

  • The luminaire schedule with manufacturer, model, optic and lumen output.
  • Mounting height, position and, critically, the tilt angle of every luminaire.
  • The photometric data files used, identified by name.
  • The calculated upward flux and total flux, and the resulting percentage.
  • The environmental zone assumed, and the source for that assumption.
  • The calculation grid, and the illuminance results at the site boundary and at the nearest sensitive windows.

A single line reading "ULR 0%" with no schedule behind it is not evidence. It is an assertion, and a decent environmental health officer will ask for the model.

An illustrative example

Illustrative figures, to show the method rather than to be reused. Take a small trade counter with a rear yard in a village on the edge of open countryside, lit by six luminaires on 6 m columns.

The first design uses asymmetric flat-glass luminaires mounted horizontally. Because no flux leaves above the horizontal, the installation reports a ratio of zero, and the design satisfies the sky glow criterion in any zone.

The designer then tilts the luminaires by 10 degrees to lift the illuminance in the far corner of the yard and reduce the number of columns from six to five. That tilt puts a small proportion of the flux above the horizontal, and the ratio is no longer zero. In a dark rural zone that single change takes the scheme outside the criterion and the saving on the sixth column is lost.

The resolution is usually optical rather than geometric: a different distribution, a slightly higher column, or an additional luminaire kept flat. And the lesson generalises. Tilt is where compliance is lost, and it is the parameter most often missing from the submitted schedule.

Where applicants and officers get it wrong

Four recurring errors.

Reporting the luminaire's upward light output ratio from the manufacturer's data sheet instead of the installation's ULR. The product figure describes the luminaire on a test bench, horizontal and unaimed. The planning figure describes your scheme as built.

Treating a zero ratio as the whole case. Light intrusion into windows, luminaire intensity as seen from a bedroom and the curfew period are separate criteria with separate limits, and a scheme can pass on sky glow and fail badly on intrusion.

Ignoring the reflected component on reflective surfaces. Pale concrete, water and glazed roofs all return light upward, and a scheme lighting a large pale apron needs its illuminance levels justified as well as its optics.

Forgetting the curfew. Most authorities condition a curfew, often 23:00, after which stricter intrusion limits apply and sometimes the lighting has to be switched off or dimmed. Design for the post-curfew case from the start, with controls specified, rather than discovering it in a condition.

Upward light output ratio describes the luminaire alone. Downward light output ratio is its counterpart. Illuminance in lux measures light arriving at a surface and is what the intrusion criteria use. Luminous intensity in candelas measures the brightness of the source in a given direction and is what the glare criterion uses. Obtrusive light is the umbrella term covering all of them. These are separate measures with separate limits, and whether a lighting objection succeeds is a straightforward material consideration question once the numbers are on the table, in the same way that a measured rating level in a BS 4142 assessment settles most noise arguments.

For submission, provide a Lighting Assessment containing the luminaire schedule with tilt angles, the photometric files identified, an isolux plot covering the site and the nearest sensitive receptors, the calculated ratio with its working, the environmental zone and its source, the curfew strategy and the control system. Councils usually expect a suitably qualified author for this work, and professional review before submission is strongly advised.

Then offer the conditions yourself: installation in accordance with the approved design, no alteration of aiming angles without consent, and a curfew. Officers approve lighting schemes they can police.

You can see the full document set for a site at all 66 report types. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

This is general guidance, not legal advice. Check the position and the applicable environmental zone with your local planning authority before relying on it.

Frequently asked questions

What is upward light ratio?

The proportion of the total luminous flux of a lighting installation emitted above the horizontal, expressed as a percentage. It is calculated for the scheme as it will be mounted, including tilt angles, rather than for the luminaire in isolation. In planning it is the control applied to sky glow.

What is the difference between ULR and ULOR?

Upward light output ratio describes the luminaire alone, measured horizontal and unaimed on a test bench. Upward light ratio describes the installation as designed, including mounting angle. Quoting the manufacturer's product figure when the planning question concerns the installation is one of the commonest errors in submitted lighting reports.

Who decides which environmental zone applies?

The local planning authority, usually guided by a supplementary planning document. It is not for the applicant to choose. Ask in writing before the lighting design is fixed, because a change of zone can mean different optics, different column heights and a different layout, and that is expensive to redo.

Does a ULR of zero mean no sky glow?

No. The ratio only measures the direct upward component. Light reflected from pale concrete, water or glazed roofs also contributes to sky glow and is not captured. A scheme with no direct upward flux that over-illuminates a large pale yard still produces sky glow, and the illuminance levels will be questioned.

What should a lighting assessment include?

A luminaire schedule with manufacturer, optic, lumen output, mounting height and tilt, the photometric data files identified by name, the calculated upward and total flux with the resulting ratio, the environmental zone and its source, an isolux plot at the boundary and nearest windows, and the curfew and control strategy.

Sources and further reading

lightingupward light ratiosky glowobtrusive lightenvironmental zonesglossary

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Glossary

View all →
Glossary6 min read

First Homes: the discount, the caps and the 25% share

First Homes are discounted market sale units secured in perpetuity by a section 106 agreement and a title restriction. The discount, the price cap and the first-charge ordering all shape a scheme's affordable mix.

Read article →
Glossary7 min read

Ransom strip and the ha-ha of access rights

A retained sliver between a site and the highway blocks implementation rather than permission. How ransom strips arise, what the certificates require, and how they are resolved.

Read article →
Glossary6 min read

Section 184 vehicle crossings and the dropped kerb

Section 184 of the Highways Act 1980 governs vehicle crossings over a footway or verge, and it is decided separately from planning permission. When both are needed, the technical objections to expect, and how to sequence the applications.

Read article →
Glossary6 min read

Local Development Orders and when councils use them

Made under sections 61A to 61C of the Town and Country Planning Act 1990, a local development order removes the application stage for development it specifies. What it can grant, how to read its limitations, and what happens when it expires.

Read article →
Glossary6 min read

Lapsed permissions and what to do when time runs out

Once the three-year clock runs out without a lawful start, the permission is gone and section 73 cannot extend it. The options before expiry, the position afterwards, and the policy changes a fresh application now has to meet.

Read article →
Glossary7 min read

Prior approval: what the procedure actually involves

Prior approval under the General Permitted Development Order 2015 asks the council to sign off a short list of matters, not the principle of development. Here is how the procedure, the clocks and the deemed approval provisions work.

Read article →