Glossary

First Homes: the discount, the caps and the 25% share

6 min readBy PlanScope Editorial Team

First Homes are discounted market sale units secured in perpetuity by a section 106 agreement and a title restriction. The discount, the price cap and the first-charge ordering all shape a scheme's affordable mix.

First Homes are a form of affordable home ownership sold at a discount of at least 30 per cent against open market value, with the discount fixed to the property in perpetuity rather than paid to the first buyer. In first homes planning terms they are a tenure, secured through a section 106 agreement and a restriction on the title, and national guidance expects them to take the first slice of the affordable housing a scheme provides. For a developer assembling an affordable housing mix, that ordering is the detail that changes the numbers.

The product was introduced by a Written Ministerial Statement in May 2021 and sits in national planning guidance rather than in statute. Affordable home ownership policy has been revisited at each revision of the National Planning Policy Framework since, so confirm the current requirement against the adopted local plan and the authority's published position before a tenure mix is fixed.

What the tenure actually is

A First Home is a dwelling sold to a qualifying buyer at a discount, where the discount passes to every subsequent buyer. The seller receives the discounted price. The gap between that and market value is not a grant, a loan or an equity share. It is a permanent reduction in what the property can ever be sold for while the restriction stands.

That makes it closer to a discounted market sale product than to shared ownership. There is no rent, no staircasing and no landlord. The local planning authority holds the enforcement interest through the obligation, and a mortgagee exclusion clause allows a lender to sell free of the restriction if it has to repossess.

Because the discount is permanent, the value lost sits with the landowner rather than with the public purse. That is the point of delivering it through planning obligations, and it is why the tenure appears in viability discussions rather than in grant funding conversations.

The discount and the price caps

Two numbers govern the product. The discount is a minimum of 30 per cent against market value, and an authority may require a deeper discount of 40 or 50 per cent where its evidence supports one. The price after discount is then capped.

Control Position outside Greater London Position in Greater London
Minimum discount against market value 30 per cent 30 per cent
Maximum price after the discount £250,000 £420,000
Household income cap £80,000 £90,000

The cap bites hardest where values are high but the London cap does not apply. A four-bedroom house in a southern market town can be worth enough that a 30 per cent discount still leaves it above £250,000, which means it cannot be a First Home at all. Deeper discounts solve the arithmetic and worsen the viability position, so the unit mix is usually resolved by putting the smaller homes into the tenure.

A deeper discount set by local policy has to be evidenced in the same way as any other affordable housing requirement. Where it is not, it is open to challenge at application stage or through a Viability Assessment.

The share of affordable provision

National guidance expects 25 per cent of the affordable homes secured through planning obligations to be First Homes, taken as a first charge on the affordable housing contribution. The remaining 75 per cent is then split between the other tenures according to the development plan.

The sequencing matters more than the percentage. If a local plan requires a 70:30 split between affordable rent and shared ownership, the First Homes slice comes out first and the balance is applied to what is left. Social and affordable rented provision is intended to be protected within that balance, so the squeeze usually falls on the intermediate ownership products.

Where a scheme is paying a commuted sum instead of providing units on site, the same first-charge logic applies to the cash. Our note on how offset and commuted payments are calculated covers the mechanics of indexation and payment triggers, which behave the same way whichever obligation is being funded.

Eligibility and local connection

A buyer must be a first-time buyer, using the definition applied for stamp duty land tax relief, and must have a household income at or below the cap. There is also a mortgage requirement: the purchaser has to fund at least half the discounted price with a mortgage or home purchase plan, which exists to stop cash buyers taking the stock.

Authorities may add local eligibility criteria for an initial marketing period, typically three months, covering a local connection, key worker status or service in the armed forces. After that window the home must be offered to any qualifying buyer nationally. Criteria that are tighter or longer than guidance allows tend to be negotiated down in the obligation drafting.

For an applicant, the practical risk is not eligibility but absorption. A scheme that depends on selling 18 First Homes in a single phase needs a marketing plan that acknowledges a smaller pool of buyers, and the Affordable Housing Statement is where that reasoning belongs.

Exception sites

The exception site route allows First Homes on land that would not otherwise be released for housing. The site must be unallocated, outside the Green Belt, adjacent to or within an existing settlement, and proportionate in size to that settlement. The development should consist of First Homes unless the authority agrees a different mix, and it must not compromise the protection given to designated areas or to the landscape.

These sites are not a shortcut. The tests are cumulative, the proportionality judgement is qualitative, and an authority with a healthy housing land supply has little reason to be generous. Where an exception site succeeds it is usually because the settlement had no allocated sites, the land has a defensible boundary, and the local housing need evidence pointed at exactly this product.

And the policy test is only half the work. The site still needs the ordinary evidence base for a greenfield edge-of-settlement scheme, which on most sites means ecology, drainage, highways and landscape work before the application is validated. Browsing the full list of report types is a quick way to see which of those apply.

Securing it in perpetuity

The restriction is delivered through two documents working together. The section 106 agreement sets the discount, the eligibility criteria, the price cap, the marketing process and the mortgagee exclusion. A restriction is then entered on the registered title so that a future sale at an undiscounted price cannot complete without the authority's involvement.

Drafting points that cause trouble later include the valuation mechanism for each resale, the indexation of the price cap, the definition of market value and who pays for the valuation. An obligation that requires a fresh open market valuation on every resale, with no agreed methodology, creates a dispute every time the home changes hands.

An illustrative example. A 60-dwelling scheme with a 30 per cent affordable requirement provides 18 affordable homes. Four of them, rounded from 25 per cent, become First Homes, and the remaining 14 are split according to the plan's tenure policy. If local values put a 30 per cent discount on a two-bedroom house just under the £250,000 cap, those four units are deliverable. If the scheme is houses only and all of them exceed the cap after discount, the mix has to change or a deeper discount has to be agreed. The figures here are illustrative rather than a prediction for any particular site.

Check which affordable housing and viability documents your scheme needs by entering the postcode on PlanScope, then send the draft for professional review before it goes to the council.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What discount applies to a First Home?

At least 30 per cent against open market value, and a local planning authority may require 40 or 50 per cent where its evidence supports a deeper discount. The reduction stays with the property for every future sale rather than being paid to the first buyer, which is why it is secured by a restriction on the title.

What are the First Homes price caps?

After the discount is applied, the sale price must not exceed £250,000 outside Greater London or £420,000 within it. Where a 30 per cent discount still leaves a dwelling above the cap, that unit cannot be a First Home, so schemes usually place smaller house types into the tenure or agree a deeper discount.

Who is eligible to buy one?

A first-time buyer, using the definition applied for stamp duty land tax relief, with a household income at or below £80,000, or £90,000 in Greater London. The buyer must also fund at least half the discounted price with a mortgage or home purchase plan, which keeps cash purchasers out of the stock.

How does the 25 per cent requirement interact with local tenure policy?

National guidance treats First Homes as a first charge on the affordable housing secured by obligations, so the 25 per cent is taken out before the development plan's tenure split is applied to the balance. Rented provision is intended to be protected within that balance, so intermediate ownership products usually absorb the reduction.

What is a First Homes exception site?

An unallocated site, outside the Green Belt, adjacent to or within an existing settlement and proportionate to its size, brought forward for First Homes rather than through the plan. The tests are cumulative and qualitative, and the site still needs the ordinary ecology, drainage, highways and landscape evidence base.

Sources and further reading

first homesaffordable housingsection 106planning obligationsviabilityhousing tenure

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Glossary

View all →
Glossary6 min read

The duty to cooperate and what replaced it

Section 33A requires constructive, active and ongoing engagement on cross-boundary strategic matters. A breach cannot be cured by modification, which is why inspectors test it first.

Read article →
Glossary8 min read

Hope value and how planning status affects land value

Hope value is the slice of a land price that reflects the prospect of future planning permission. Allocation in a local plan usually moves it more than the permission itself.

Read article →
Glossary7 min read

Ransom strips and severance in planning terms

Permission does not confer a right to build. What a ransom strip is, how severance drives its retention, and the certificates, conditions and checks that follow.

Read article →
Glossary7 min read

Purchase notices and blight notices distinguished

Both notices force a public body to buy. One follows a planning decision, the other a public scheme, and the tests, recipients and timetables are entirely different.

Read article →
Glossary7 min read

Extant planning permission and how to keep it alive

A permission is extant while it can still be lawfully implemented. Here are the section 91 and 92 time limits, what counts as a material start, and the options once a consent has gone.

Read article →
Glossary6 min read

Design review panel and its weight

Panel reports are advice, not decisions. What gives them weight is independence, composition and whether the scheme in front of the council is the one the panel saw.

Read article →