The duty to cooperate and what replaced it

6 min readBy PlanScope Editorial Team

Section 33A requires constructive, active and ongoing engagement on cross-boundary strategic matters. A breach cannot be cured by modification, which is why inspectors test it first.

The duty to cooperate is a legal obligation on local planning authorities, county councils and prescribed bodies to engage constructively, actively and on an ongoing basis on strategic matters when preparing a local plan. It sits in section 33A of the Planning and Compulsory Purchase Act 2004, inserted by the Localism Act 2011 to fill the gap left when regional strategies were abolished. Failure cannot be cured by modification, which is what makes it the sharpest tool in an examination.

For anyone appearing at a local plan examination, the duty is the first hurdle and the only one that is binary. A plan either complied or it did not.

What the duty requires

Section 33A obliges the bodies it names to cooperate with each other in maximising the effectiveness of plan preparation, so far as it relates to a strategic matter. The cooperation must be constructive, active and on an ongoing basis, which rules out a single letter sent at regulation 19 stage.

Strategic matters are defined in section 33A(4) as sustainable development or use of land that has or would have a significant impact on at least two planning areas, including development that would have such an impact on county matters. The prescribed bodies are listed in the Town and Country Planning (Local Planning) (England) Regulations 2012, and they reach well beyond neighbouring councils: the Environment Agency, Historic England, Natural England, Highways bodies, integrated care boards and local enterprise bodies among them.

Two features of the drafting cause most of the argument. First, the duty is about process, not outcome, so an authority can comply while failing to agree. Second, it bites during plan preparation, so cooperation after submission does not retrospectively satisfy it.

Why the duty is tested first

The duty is a legal compliance test rather than a soundness test. Soundness failings are repaired through main modifications during examination; a breach of section 33A cannot be, because the cooperation should have happened before the plan was submitted.

That is why inspectors deal with it in the opening session or on the papers before hearings open. An authority that fails is left with no route other than withdrawal and a restart, having spent the evidence base budget.

Test Nature Can it be fixed in examination
Duty to cooperate, section 33A Legal compliance No
Other legal requirements, such as sustainability appraisal Legal compliance Sometimes, by further work
Soundness: positively prepared, justified, effective, consistent with national policy Policy judgement Yes, by main modifications

The practical lesson for a plan-making authority is that the duty is a programme risk to manage from the outset, not a chapter to write at the end.

Unmet need and the recurring failure pattern

The commonest difficulty is unmet housing or employment need. Authority A cannot meet its own requirement because of Green Belt, flood risk or landscape designation, and asks its neighbours to take the shortfall. The neighbours decline, and the plan arrives at examination with a gap and no agreed mechanism for closing it.

The duty does not require the neighbours to say yes. It requires both sides to have engaged constructively on the question, to have tested the options, and to have recorded the outcome. An authority that can show a sequence of joint evidence, member-level meetings and a signed position on where the shortfall sits will usually pass even where the shortfall remains.

What fails is silence, or engagement that began too late to influence anything.

Statements of common ground

Statements of common ground are the main evidence of compliance. National policy expects effective joint working on cross-boundary strategic matters to be evidenced in this way, and the Planning Practice Guidance on plan-making sets out what a statement should contain.

A statement that carries weight does four things:

  1. Identifies the strategic matter precisely, with the geography it covers.
  2. Records what is agreed, in terms specific enough to be acted on.
  3. Records what is not agreed, and why, without softening it.
  4. Is signed at a level that commits the authority, and dated.

The temptation to produce a statement that agrees everything should be resisted. An inspector reading a document in which two authorities with a live disagreement about 2,000 homes agree on all points will question the whole evidence base. Our note on statements of common ground and the duty to cooperate sets out the drafting in more detail, and the related discipline of deciding what to concede applies equally at plan stage.

The same document type appears in appeal work with a different purpose, and the distinction is worth keeping clear, as set out in our note on a statement of common ground or a proof of evidence.

The alignment test

The Levelling-up and Regeneration Act 2023 provides for the repeal of the duty to cooperate, with the Government's stated intention that it be replaced by a policy-based alignment test applied through national policy rather than a statutory duty. The replacement is designed to be less binary, so that a failure of cooperation can be weighed rather than ending the examination.

Whether the repeal is yet in force matters more than the policy intention. Provisions in the 2023 Act take effect only when regulations bring them into force, and the plan-making reforms have been switched on in stages. Check the in-force dates on legislation.gov.uk and the current national policy text before advising that either regime applies to a particular plan, because transitional arrangements determine which plans continue under the old system.

Until the repeal is in force for a given plan, the duty applies in full and should be evidenced as if nothing had been announced.

Reading the position in practice

For a consultant advising a promoter, the duty is a tactical question as much as a legal one.

Where you are supporting a site in an authority with unmet need, read the cooperation evidence early. If the authority has not engaged with neighbours on the shortfall, that is a legal compliance point to raise in the regulation 19 representation rather than a soundness argument to develop later, and it is worth raising clearly because it cannot be repaired by modification.

Where you are promoting a site in the receiving authority, the question reverses. The statements of common ground will show whether your authority has accepted any part of the neighbour's shortfall, and that acceptance is often where a new allocation comes from.

An illustrative example. A district with two thirds of its area in Green Belt identifies a requirement it cannot meet within the urban area. It commissions joint evidence with three neighbours, holds member-level meetings over eighteen months, and signs statements with two of the three. The third declines to take any part of the shortfall and says so in a signed statement. The plan is submitted with a residual shortfall and an early review commitment. The duty is satisfied, because the engagement happened and is recorded, even though the outcome is incomplete.

Change one fact, remove the signed statement from the authority that declined, and the position becomes arguable.

The duty rewards paperwork, which is an unglamorous conclusion but an accurate one. The authority that documented its meetings passes, and the one that held the same meetings without recording them is left arguing about what was said.

If you are preparing representations and want the supporting statements drafted to a consistent structure, the report types are set out by category.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What is the duty to cooperate?

It is the obligation in section 33A of the Planning and Compulsory Purchase Act 2004 on local planning authorities, county councils and prescribed bodies to engage constructively, actively and on an ongoing basis on strategic matters during plan preparation. It was inserted by the Localism Act 2011 after regional strategies were abolished, and it concerns process rather than outcome.

What counts as a strategic matter?

Section 33A(4) defines it as sustainable development or use of land that has or would have a significant impact on at least two planning areas, including county matters. In practice that means housing and employment requirements, strategic infrastructure, waste and minerals, flood risk management and cross-boundary transport and environmental issues.

Can a plan that fails the duty be saved by modifications?

No. The duty is a legal compliance test, not a soundness test, so it cannot be repaired through main modifications. An authority that fails is left with withdrawal and a restart. That is why inspectors address it in the opening session or on the papers before hearings begin.

Does the duty require neighbours to take unmet need?

No. It requires both authorities to have engaged constructively on the question, tested the options and recorded the outcome. A plan can be submitted with a residual shortfall and still comply, provided the engagement happened in time to influence the plan and is properly evidenced in signed statements of common ground.

Has the duty been abolished?

The Levelling-up and Regeneration Act 2023 provides for its repeal and the Government has said it will be replaced by a policy-based alignment test. Those provisions take effect only when regulations bring them into force, and transitional arrangements decide which plans continue under the old system, so check legislation.gov.uk and the current national policy before advising.

Sources and further reading

duty to cooperatelocal planplan examinationstatement of common groundstrategic policiesunmet need

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Glossary

View all →
Glossary6 min read

Strategic and non-strategic policies distinguished

The strategic and non-strategic division decides what a neighbourhood plan may do and how a policy is weighed in a decision. Argue the classification rather than assuming it.

Read article →
Glossary8 min read

Hope value and how planning status affects land value

Hope value is the slice of a land price that reflects the prospect of future planning permission. Allocation in a local plan usually moves it more than the permission itself.

Read article →
Glossary7 min read

Ransom strips and severance in planning terms

Permission does not confer a right to build. What a ransom strip is, how severance drives its retention, and the certificates, conditions and checks that follow.

Read article →
Glossary7 min read

Purchase notices and blight notices distinguished

Both notices force a public body to buy. One follows a planning decision, the other a public scheme, and the tests, recipients and timetables are entirely different.

Read article →
Glossary7 min read

Extant planning permission and how to keep it alive

A permission is extant while it can still be lawfully implemented. Here are the section 91 and 92 time limits, what counts as a material start, and the options once a consent has gone.

Read article →
Glossary6 min read

Design review panel and its weight

Panel reports are advice, not decisions. What gives them weight is independence, composition and whether the scheme in front of the council is the one the panel saw.

Read article →