Strategic and non-strategic policies distinguished

6 min readBy PlanScope Editorial Team

The strategic and non-strategic division decides what a neighbourhood plan may do and how a policy is weighed in a decision. Argue the classification rather than assuming it.

Strategic policies set the overall pattern, scale and quality of development in an area, including the housing requirement. Non-strategic policies deal with the detail: specific areas, particular neighbourhoods, individual sites and development types. Every local planning authority must identify its strategic priorities and have strategic policies to address them, and the distinction decides what a neighbourhood plan may and may not do.

For a consultant arguing a case, the label on a policy affects how much weight it carries, what it can be used to resist, and whether a neighbourhood plan policy can be set aside for conflicting with it.

What strategic policies cover

National policy describes strategic policies as those setting out an overall strategy for the pattern, scale and quality of development, and making enough provision for housing, employment, infrastructure, community facilities, conservation and climate change. The statutory hook is in section 19 of the Planning and Compulsory Purchase Act 2004, which requires authorities to identify the strategic priorities for development and use of land and to have policies addressing them.

In practice the strategic set usually includes:

  • The spatial strategy and the settlement hierarchy.
  • The housing requirement for the plan period, and the distribution between settlements.
  • Employment land provision and the main employment allocations.
  • Strategic site allocations and any new settlements or urban extensions.
  • Green Belt boundaries and their review.
  • Strategic infrastructure, including transport corridors and strategic flood risk management.
  • The affordable housing requirement and the policy approach to planning obligations.

Those are the policies that have to be based on an assessment of need, tested for deliverability, and supported by the cross-boundary engagement that plan examinations probe.

What non-strategic policies cover

Non-strategic policies are everything else in the development plan, including the whole of a neighbourhood plan. Design codes, local standards for amenity and parking, detailed site-specific allocations, local green space designations, shopfront policies, policies on householder extensions.

They are not lesser policies in the sense of weight. A non-strategic design policy in an adopted plan is part of the development plan and section 38(6) of the 2004 Act applies to it just as it does to the housing requirement. The difference is in what the policy is for and in the tests it had to pass.

Feature Strategic policies Non-strategic policies
What they set Pattern, scale, housing requirement, strategic sites Detail, local standards, small allocations
Where they sit Local plan, spatial development strategy Local plan, neighbourhood plans
Conformity Must be consistent with national policy Must conform generally with strategic policies
Who prepares them The authority or a combined authority The authority, or a parish or neighbourhood forum
Evidence expected Needs assessment, deliverability, joint working Local evidence, character appraisal, consultation

Why neighbourhood plans turn on this

A neighbourhood plan must meet the basic conditions in Schedule 4B to the Town and Country Planning Act 1990 before it can proceed to referendum. One of them is that the plan is in general conformity with the strategic policies contained in the development plan for the area.

That is the condition examiners apply most often. A neighbourhood plan cannot set a housing figure lower than the requirement the strategic policies allocate to its area, cannot delete a strategic allocation, and cannot impose a settlement boundary that frustrates the spatial strategy. It can do a great deal within those limits: allocate additional sites, set design requirements, designate local green space, protect valued local facilities.

"General conformity" is deliberately loose. An examiner will not strike down a neighbourhood policy for being more demanding than the local plan on design, but will on a policy that undermines the housing strategy.

Where the strategic policies are silent on the neighbourhood area, the question becomes harder. National policy expects strategic policies to set out a housing requirement figure for designated neighbourhood areas, or for the authority to provide an indicative figure on request, and a neighbourhood plan produced without one is working with less certainty.

The effect on the housing requirement

The housing requirement is a strategic policy by definition, which has two consequences in casework.

First, a neighbourhood plan allocating fewer homes than its apportionment is vulnerable. Second, where an authority cannot demonstrate a five year supply of deliverable sites, or has underdelivered against the Housing Delivery Test, the consequences in national policy attach to the authority's position rather than to the neighbourhood plan's, even though the practical effect lands on sites inside the neighbourhood area.

The tilted balance, when it applies, operates on the policies most important for determining the application rather than on strategic policies alone. That is an important refinement, because a decision maker working through which policies are out of date has to look at the non-strategic ones too. A detailed design policy may be the most important policy for a small infill scheme, and its age and consistency with national policy then matter directly.

Reading a plan to work out which is which

Well drafted plans say so. Many identify strategic policies in the introduction, mark them in the policy schedule, or group them in a dedicated chapter. Where a plan does not, three tests usually resolve it.

  1. Does the policy set a quantum, a distribution or a boundary that the rest of the plan depends on. If so, it is strategic.
  2. Was it supported by a needs assessment and by cross-boundary engagement at examination. Strategic policies were.
  3. Could a neighbourhood plan sensibly contradict it without unpicking the strategy. If not, it is strategic.

Older plans are harder, because the strategic and non-strategic vocabulary post-dates them. A core strategy adopted before the distinction was in common use may contain both kinds of policy without labelling either, and the answer comes from the substance rather than from the heading.

Where two plan policies conflict, section 38(5) of the 2004 Act gives priority to the policy in the most recently adopted document. That cuts across the strategic and non-strategic division and is worth remembering when a neighbourhood plan is newer than the local plan it sits under.

Using the distinction in an argument

An illustrative example. A proposal for 18 dwellings on an unallocated edge-of-settlement site in a parish with an adopted neighbourhood plan. The neighbourhood plan has a settlement boundary policy that excludes the site and a design policy requiring frontage parking to be avoided.

For the applicant, the settlement boundary policy is the target. If it was adopted to deliver a housing figure that the authority can no longer sustain, the argument is that the policy is a non-strategic policy whose purpose has fallen away, and that the strategic housing requirement should drive the outcome. For the parish, the argument is that the boundary policy was found to be in general conformity at examination and remains part of the development plan.

Both arguments are available, which is the point. Say which category you say the policy falls into and why, because an inspector will want the classification argued rather than assumed.

Set out the policy hierarchy explicitly in the Planning Statement, listing the strategic policies engaged, the non-strategic policies engaged, and the weight you say each carries. Where the strategic affordable housing requirement is in play, the case for the mix and tenure belongs in an Affordable Housing Statement rather than in the main statement.

The classification is rarely decisive on its own. It is the frame that makes the rest of the argument land, and plenty of representations skip it.

If you are assembling the document set for a case like this, the 66 report types are grouped by category.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What makes a policy strategic?

It sets an overall strategy for the pattern, scale and quality of development: the spatial strategy, the housing requirement and its distribution, employment provision, strategic allocations, Green Belt boundaries, strategic infrastructure and the affordable housing requirement. Section 19 of the Planning and Compulsory Purchase Act 2004 requires authorities to identify strategic priorities and have policies addressing them.

Are non-strategic policies given less weight?

Not inherently. A non-strategic policy in an adopted plan is part of the development plan and section 38(6) of the 2004 Act applies to it in the same way. The difference is in what the policy does and the tests it had to pass at examination, not in its statutory status once adopted.

Can a neighbourhood plan set its own housing figure?

Only within the strategic requirement. Schedule 4B to the Town and Country Planning Act 1990 requires a neighbourhood plan to be in general conformity with the strategic policies of the development plan, so it cannot allocate fewer homes than its apportionment or delete a strategic allocation. It can allocate additional sites and set design requirements.

Does the tilted balance apply only to strategic policies?

No. Where it is engaged it operates on the policies most important for determining the application, which can include non-strategic policies. A detailed design or parking policy may be the most important policy for a small infill scheme, so its age and consistency with national policy matter directly to the outcome.

What happens when two plan policies conflict?

Section 38(5) of the Planning and Compulsory Purchase Act 2004 gives priority to the policy in the most recently adopted document. That applies across the strategic and non-strategic division, which matters where a neighbourhood plan has been adopted more recently than the local plan it sits beneath.

Sources and further reading

strategic policieslocal planneighbourhood plandevelopment plangeneral conformitypolicy hierarchy

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Glossary

View all →
Glossary6 min read

The duty to cooperate and what replaced it

Section 33A requires constructive, active and ongoing engagement on cross-boundary strategic matters. A breach cannot be cured by modification, which is why inspectors test it first.

Read article →
Glossary8 min read

Hope value and how planning status affects land value

Hope value is the slice of a land price that reflects the prospect of future planning permission. Allocation in a local plan usually moves it more than the permission itself.

Read article →
Glossary7 min read

Ransom strips and severance in planning terms

Permission does not confer a right to build. What a ransom strip is, how severance drives its retention, and the certificates, conditions and checks that follow.

Read article →
Glossary7 min read

Purchase notices and blight notices distinguished

Both notices force a public body to buy. One follows a planning decision, the other a public scheme, and the tests, recipients and timetables are entirely different.

Read article →
Glossary7 min read

Extant planning permission and how to keep it alive

A permission is extant while it can still be lawfully implemented. Here are the section 91 and 92 time limits, what counts as a material start, and the options once a consent has gone.

Read article →
Glossary6 min read

Design review panel and its weight

Panel reports are advice, not decisions. What gives them weight is independence, composition and whether the scheme in front of the council is the one the panel saw.

Read article →