Local Development Orders and when councils use them

6 min readBy PlanScope Editorial Team

Made under sections 61A to 61C of the Town and Country Planning Act 1990, a local development order removes the application stage for development it specifies. What it can grant, how to read its limitations, and what happens when it expires.

A local development order planning tool lets a council grant planning permission in advance, for a defined type of development in a defined area, so that developers who fit within it need no planning application at all. The power sits in sections 61A to 61C of the Town and Country Planning Act 1990. The authority makes the order, consults on it, adopts it, and from that point the development it describes is permitted development, subject to whatever conditions and limitations the order contains.

For a developer, the practical question is narrow. Does an order cover this site, does my proposal fall inside it, and how do I prove that it does.

What an order can grant

An order grants permission for the development it specifies, within the area it covers, for as long as it remains in force. It can be drawn tightly, covering one site and one building type, or broadly, covering a whole employment area and a range of changes of use and extensions.

It can also do things a permitted development right in the national order cannot, because it is written for a specific place. An order can incorporate a design code and permit only development that complies with it. It can set floorspace caps, parking standards, hours of operation and landscaping requirements. It can require details to be submitted and approved before works start, which looks like a condition but operates within the order.

What it cannot do is authorise development the authority could not permit anyway. An order has to be consistent with the policies in the development plan, and the national framework and environmental legislation still apply. An order covering an employment area partly in Flood Zone 2 still has to have dealt with flood risk when it was made, so the question of how the sequential test was satisfied is one to ask about the order rather than about your own proposal.

How one is made

The procedure is set out in the development management procedure order. In outline the authority prepares a draft and an accompanying statement of reasons, consults the public and the statutory consultees, considers whether environmental impact assessment or habitats assessment is engaged, adopts the order, and publicises the adoption. The Secretary of State retains powers of intervention, and an authority has to report on its orders in its monitoring.

Two features matter to anyone relying on one. An authority can revoke or amend an order at any time, following the same kind of procedure. And an order can be made for a fixed period, which means reading the expiry date rather than assuming permanence.

Where councils use them

The pattern across England is fairly consistent:

  • Industrial and employment estates, permitting extensions, plant, hardstanding and movements between business and storage uses without repeated applications.
  • Regeneration areas and enterprise zones, where an order plus a design code gives certainty to incoming occupiers.
  • Town centres, permitting shopfront alterations, changes of use and upper floor conversions within a design code.
  • Science parks, hospital and university campuses, where an operator needs to add buildings within an agreed framework.
  • Specific infrastructure, such as permitting works needed to deliver an allocated site.

The common thread is a single landowner or a small number of them, a clear development type, and an authority that wants to remove the application stage as a deterrent.

Instrument Who makes it How permission arises
Local development order Local planning authority Order grants permission directly
Neighbourhood development order Parish or neighbourhood forum, via referendum Order grants permission directly
Permission in principle Authority, on application or via brownfield register Principle settled, technical details follow
Planning permission Authority, on application Decision notice

Conditions and limitations inside an order

Read the order as you would read a permitted development class, because that is how it functions. The limitations define what qualifies. The conditions define what you must do if it does.

Typical limitations are a maximum floorspace or footprint, a height limit, a list of permitted uses, exclusion of sites within a designation, and a requirement that the development is within a defined boundary shown on a plan. Typical conditions are prior submission of details, compliance with a design code, parking provision, landscaping, hours of construction and sometimes a drainage or contamination requirement.

Exceed a limitation by any amount and you are outside the order entirely, in which case you need planning permission for the whole development rather than for the excess. That is the single most expensive mistake available here, and it is the same trap that catches people under the national permitted development classes.

Checking whether an order covers your site

There is no single national register that reliably lists every order, so the work is local:

  1. Search the authority's planning policy pages for local development orders and read the order document and its plan rather than the summary.
  2. Check the adoption date, the expiry date if there is one, and whether any amendment has been made since.
  3. Confirm the site falls within the boundary on the order plan, at the edges as well as the centre.
  4. Test the proposal against each limitation in turn and write down the answer.
  5. Ask the authority whether it operates a confirmation or compliance procedure for the order, and use it.

That last step is worth paying for. Many orders include a notification or confirmation stage where you submit details and the authority confirms in writing that the development falls within the order. A letter of confirmation is what a funder or a buyer will want to see. Where no such procedure exists, a lawful development certificate for proposed development is the formal alternative. Reform in this area moves quickly, and the planning law timeline is a reasonable place to follow it.

Illustrative example. A business park has an order permitting extensions of up to 500 square metres to existing units, within a boundary shown on a plan, subject to a design code and prior approval of drainage details. A tenant proposes a 540 square metre extension. The proposal falls outside the order, so a full planning application is needed. Reducing the extension to 490 square metres keeps it inside. The figures here are illustrative only.

When an order expires or is revoked

Development already lawfully carried out under an order remains lawful. Development not yet begun loses its permission when the order ceases to have effect, which is the same position as a national permitted development right being withdrawn by direction.

So if you are relying on an order with a known expiry date, either implement before it or treat the order as a programme constraint. A lawful start under an order follows the ordinary rules about material operations and compliance with any conditions in the order. Where details had to be approved before works started, approval has to be in place before the start, or the start is not lawful. The supporting documents required by a compliance submission under an order are often the same ones a planning application would need, just fewer of them.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it, and remember that a lawful development certificate is the only formal way to confirm that development is lawful.

Enter your postcode on PlanScope to see which documents a compliance submission under an order is likely to need. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What is a local development order?

An order made by a local planning authority under sections 61A to 61C of the Town and Country Planning Act 1990 granting planning permission in advance for specified development in a specified area. Development that falls within the order needs no planning application, though the order can impose conditions and require details to be approved first.

How is an order different from permission in principle?

An order grants planning permission directly for the development it describes, so no application follows if you comply with it. Permission in principle settles the principle of development on a site and still requires a technical details consent afterwards. The two are often confused because both reduce application risk at different stages.

What happens if my proposal exceeds a limitation in the order?

You fall outside the order entirely and need planning permission for the whole development, not just the part that exceeds the limit. This works the same way as the national permitted development classes, and it is the most expensive mistake available, so test the proposal against each limitation and write down the answer.

How do I prove my development falls within an order?

Many orders include a notification or confirmation stage where you submit details and the authority confirms in writing that the development falls within the order. Use it, because a funder or a buyer will want that letter. Where no such procedure exists, apply for a lawful development certificate for proposed development.

Can a council revoke a local development order?

Yes, at any time, following a similar procedure to making one, and orders can also be made for a fixed period. Development already lawfully carried out stays lawful, but development not yet begun loses its permission when the order ceases to have effect, so treat an expiry date as a programme constraint.

Sources and further reading

local development orderpermitted developmentplanning permissionemployment landregenerationglossary

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Glossary

View all →
Glossary7 min read

Purchase notices and blight notices distinguished

Both notices force a public body to buy. One follows a planning decision, the other a public scheme, and the tests, recipients and timetables are entirely different.

Read article →
Glossary7 min read

Extant planning permission and how to keep it alive

A permission is extant while it can still be lawfully implemented. Here are the section 91 and 92 time limits, what counts as a material start, and the options once a consent has gone.

Read article →
Glossary6 min read

Design review panel and its weight

Panel reports are advice, not decisions. What gives them weight is independence, composition and whether the scheme in front of the council is the one the panel saw.

Read article →
Glossary6 min read

Open book viability appraisal

Open book means the authority and the public see your inputs. National guidance expects publication, redaction is the exception, and review mechanisms capture what the appraisal got wrong.

Read article →
Glossary6 min read

Abnormal load route: what it means in a planning case

An abnormal load route is the agreed path an oversized indivisible load takes to site, with the bridges, junctions and street furniture it affects. The planning evidence and the statutory notification are separate processes.

Read article →
Glossary6 min read

No satisfactory alternative: the second derogation test

The second derogation test asks whether the purpose of a development could be achieved another way with less harm to a European protected species. It is judged on purpose, not on the applicant's preference.

Read article →