Glossary

No satisfactory alternative: the second derogation test

6 min readBy PlanScope Editorial Team

The second derogation test asks whether the purpose of a development could be achieved another way with less harm to a European protected species. It is judged on purpose, not on the applicant's preference.

No satisfactory alternative is the second of the three derogation tests that Natural England must be satisfied of before granting a European protected species licence. It asks whether the purpose of the proposal could be achieved by some other means that would cause less harm to the species, and it is judged against the purpose of the project rather than the applicant's preferred way of delivering it. Ecologists writing method statements usually get the third test right and this one wrong.

The test is short. The evidence it demands is not.

What the term means

The Conservation of Habitats and Species Regulations 2017 make it an offence to deliberately kill, injure or disturb a European protected species, or to damage or destroy a breeding site or resting place. Development that would do any of those things needs a licence, and a licence can be granted only where three conditions are met.

The three run together and all must be satisfied:

  1. The licence is granted for one of the purposes the Regulations permit. For development that is normally imperative reasons of overriding public interest, including those of a social or economic nature, or preserving public health or public safety.
  2. There is no satisfactory alternative.
  3. The action authorised will not be detrimental to the maintenance of the population of the species concerned at a favourable conservation status in its natural range.

The second test is the one under discussion. It is not asking whether a better scheme exists in the abstract. It asks whether an alternative exists that would achieve the same purpose and would be satisfactory when judged by its effect on the species.

Where it comes from in law

The wording descends from Article 16 of the Habitats Directive and is carried into domestic law by the licensing provisions in the 2017 Regulations. Those provisions set the purposes for which a licence may be granted and then impose the two further conditions, of which the absence of a satisfactory alternative is the first.

A second, separate derogation sits elsewhere in the same Regulations and deals with plans and projects affecting European sites rather than species. That one requires there to be no alternative solutions, imperative reasons of overriding public interest, and compensatory measures secured. The vocabulary is close enough to cause constant confusion, and the two tests apply to different things.

There is also a duty on the local planning authority. Where it is clear that a licence will be needed, the authority must consider the three tests itself before granting planning permission, because granting permission for development that could never be licensed is not a rational decision. That principle comes from the administrative court and is the reason case officers ask for a shadow derogation assessment rather than leaving the point to Natural England.

How it is applied in practice

The assessment has to identify real alternatives, describe them, and explain why each is rejected. Four categories cover almost every case.

Doing nothing, which is always an alternative and has to be addressed rather than dismissed. Using a different site, where the applicant controls or could reasonably acquire one. Using a different design or layout on the same site, which is where most of the useful argument lies. And using different methods or different timing, such as phasing works outside the breeding season or retaining a roost void within the scheme.

Rejecting an alternative because it costs more is permissible only where the extra cost is such that the purpose could not be achieved. Rejecting one because the client prefers the other layout is not. Natural England asks for the reasoning and will return a method statement that simply asserts the chosen scheme is the only option.

Set it out as a table in the licence application, with the alternative, the effect on the species, and the reason for rejection in one line each. Then expand the two or three that came close.

An illustrative worked example

Take a stone barn with a soprano pipistrelle maternity roost in the ridge, proposed for conversion to a single dwelling. This example is illustrative.

The alternatives are: leave the barn as it is, convert a second barn on the same holding instead, convert this barn but retain the ridge void with a dedicated access and no works to that bay, or carry out the same scheme with the roost destroyed and a bat loft provided in the new roof.

The second alternative fails because the other barn is smaller and has its own roost. The fourth is the proposal. The third is the one the assessment must take seriously, because retaining the void changes the internal layout but still achieves the purpose of creating a dwelling. If the ridge can be left alone and the scheme still works, that is a satisfactory alternative, and the licence should be refused for the scheme that destroys the roost.

That is the uncomfortable part of the test. Done honestly, it sometimes changes the scheme.

Common misuse of the term

The commonest error is collapsing the second test into the first and arguing public interest when the question is alternatives. The second is treating the absence of a satisfactory alternative as a matter of the applicant's commercial preference. The third is confusing it with the sequential test in flood risk policy, which asks about reasonably available sites at lower risk and is a planning policy test rather than a licensing one.

A fourth error appears in planning statements rather than method statements: asserting that the derogation tests are a matter for Natural England alone. They are not, where the authority can see a licence will be required.

Term Where it sits What it asks
No satisfactory alternative Species licensing under the 2017 Regulations Could the purpose be achieved another way with less harm to the species
No alternative solutions Derogation for plans and projects affecting European sites Is there another way to meet the need the plan or project serves
Imperative reasons of overriding public interest Both derogations Is the purpose important enough to justify the harm
Favourable conservation status Species licensing Will the population remain viable in its natural range
Sequential test Flood risk policy Are there reasonably available sites at lower flood risk

Licensed species work is also where the professional boundary is hardest. Surveys, the method statement and the licence application require a suitably licensed ecologist under the Wildlife and Countryside Act 1981 and the 2017 Regulations, and a Protected Species Survey draft is a starting point for that person rather than a replacement. The same applies to the baseline work in a Preliminary Ecological Appraisal.

Where to check the current position

Read the licensing provisions in the current consolidated text of the 2017 Regulations rather than a summary, because the Regulations have been amended since 2017 and the licensing body's published guidance changes more often than the law does.

Check three other things. Whether a district level licensing scheme operates in the area for the species concerned, which changes the route entirely for great crested newts in many authorities. Whether the species is covered by the Regulations at all, since badgers sit under the Protection of Badgers Act 1992 with different tests. And whether the authority expects the derogation assessment within the application documents, which most now do.

Browse the ecology and environmental report types to see where the derogation assessment sits in a submission, or enter a postcode on PlanScope to see which reports a site is likely to need.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required, and this is general guidance rather than legal advice.

Frequently asked questions

What are the three derogation tests?

A licence for a European protected species can be granted only where the purpose is one the Regulations permit, usually imperative reasons of overriding public interest or public health and safety, where there is no satisfactory alternative, and where the action will not be detrimental to maintaining the species population at favourable conservation status in its natural range.

Does cost justify rejecting an alternative?

Only where the extra cost means the purpose could not be achieved at all. A preference for a more profitable layout is not enough. The assessment must set out each realistic alternative, its effect on the species and the reason for rejection, and Natural England will return a method statement that simply asserts no alternative exists.

Must the council apply the derogation tests before granting permission?

Where it is clear a licence will be needed, yes. Granting permission for development that could never be licensed is not a rational decision, so case officers ask for a shadow derogation assessment within the application documents. That duty sits alongside, not instead of, the licensing body's own assessment.

How is this different from no alternative solutions?

The species licensing test asks whether the project's purpose could be achieved with less harm to the species. The separate derogation for plans and projects affecting European sites asks whether there are alternative solutions, and also requires imperative reasons of overriding public interest and secured compensatory measures. Different tests, different subject matter.

Does doing nothing count as an alternative?

Yes, and it has to be addressed rather than dismissed in a line. The assessment should explain what would happen if the development did not proceed, including the condition of the building or habitat over time, and why that outcome does not achieve the purpose the licence application relies on.

Sources and further reading

protected specieshabitats regulationsderogationecologyglossary

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Glossary

View all →
Glossary6 min read

Habitat units and the trading rules

A habitat unit combines area, distinctiveness, condition and strategic significance. The trading rules and the separate hedgerow and watercourse modules decide whether a gain counts.

Read article →
Glossary6 min read

Strategic and non-strategic policies distinguished

The strategic and non-strategic division decides what a neighbourhood plan may do and how a policy is weighed in a decision. Argue the classification rather than assuming it.

Read article →
Glossary6 min read

The duty to cooperate and what replaced it

Section 33A requires constructive, active and ongoing engagement on cross-boundary strategic matters. A breach cannot be cured by modification, which is why inspectors test it first.

Read article →
Glossary8 min read

Hope value and how planning status affects land value

Hope value is the slice of a land price that reflects the prospect of future planning permission. Allocation in a local plan usually moves it more than the permission itself.

Read article →
Glossary7 min read

Ransom strips and severance in planning terms

Permission does not confer a right to build. What a ransom strip is, how severance drives its retention, and the certificates, conditions and checks that follow.

Read article →
Glossary7 min read

Purchase notices and blight notices distinguished

Both notices force a public body to buy. One follows a planning decision, the other a public scheme, and the tests, recipients and timetables are entirely different.

Read article →