Tabulating comfort criteria in a wind microclimate study
A wind study answers two questions: is each location comfortable for its intended activity, and is it ever dangerous. Here is how to tabulate both.
A wind microclimate study has to answer two separate questions and report them separately. Is the wind environment at each location suitable for the activity intended there, and is it ever strong enough to be dangerous. The first is the comfort assessment, tabulated against activity categories. The second is the safety or distress assessment, tested against a much higher wind speed occurring far less often. A report that merges them, or that reports comfort and then mentions safety in a sentence, will come back from a design review panel.
The tabulation is where the work shows. Reviewers look at the table first, and they look for receptor locations, criteria set, configurations and seasons before they read a word of the narrative.
What the study has to demonstrate
For a tall or exposed building the planning question is whether the proposal makes the wind environment at ground level and on any upper level amenity space suitable for its intended use, and whether it makes conditions worse for people outside the site.
The London Plan's tall buildings policy requires microclimate effects including wind to be assessed, and national design guidance expects the public space to be comfortable in use. Outside London, the requirement usually comes from a local policy on tall buildings or from the design review process rather than from a validation checklist, which is why the scope has to be agreed with the authority early.
Two methods are accepted. Boundary layer wind tunnel testing on a scale model, and computational fluid dynamics. Both need long-term directional wind statistics from a representative meteorological station, adjusted for terrain, and both should state the number of wind directions modelled. Say which method was used and why. On a scheme with complex surrounding massing, a reviewer will ask why the tunnel was not used.
Comfort categories and activity types
The comfort criteria in common use relate a threshold wind speed to an activity, and treat the criterion as met where the threshold is not exceeded for more than 5 per cent of the time.
| Activity | Character of the location |
|---|---|
| Sitting, long duration | Outdoor seating, cafe terrace, roof garden seating |
| Sitting, short duration or standing | Bus stop, building entrance, waiting area |
| Strolling | Public square, park path, shopfront frontage |
| Walking | Pavement along a street |
| Business walking | Service route, car park, rarely used frontage |
Each category has a threshold mean wind speed, and the series rises through the categories. State the criteria set by name in the report, give the threshold speed for each category in a table, and cite the source. Different criteria sets exist and they are not interchangeable, so a table of results with no stated criteria set cannot be checked.
The judgement that matters is matching the category to the intended use. A roof terrace designed as a seating area has to meet the sitting criterion, not the strolling one, and a scheme that claims a terrace is suitable for standing when the drawings show tables and chairs is making an argument nobody will accept.
Safety threshold and its separate test
The distress or safety criterion uses a gust equivalent mean speed rather than an hourly mean, and the exceedance frequency is far lower, since the question is whether conditions are ever hazardous rather than whether they are pleasant.
A threshold in the region of 15 metres per second is commonly applied for the general public, with a higher figure sometimes used where only able-bodied adults are expected. The exceedance frequency is typically expressed as a number of hours per year rather than a percentage of time. Whatever figures the assessor uses, they must be stated with their source, and the safety result must be reported for every receptor rather than only for those that failed on comfort.
Where the safety criterion is exceeded anywhere, mitigation is not optional and the application should not be submitted without a mitigated configuration that resolves it. Authorities will not condition their way out of a hazardous wind environment at a building entrance.
Receptor selection across the site and surrounds
Receptor selection is the part most open to manipulation, so document it.
What belongs in the receptor set:
- Every entrance to the proposed building, and to neighbouring buildings within the area of influence.
- Each area of proposed public space, with the intended activity recorded for each.
- Upper level amenity space, including balconies above a stated level and any roof terrace.
- Pavements and crossings on the surrounding streets, including the downwind side.
- Existing outdoor seating, bus stops and taxi ranks nearby.
- Any location where a reviewer or objector is likely to ask, which usually means the corners of the building.
Receptor height should be stated, conventionally around pedestrian head height, and each receptor should carry a number that appears on a plan, in the table and in the narrative. A results table that refers to "location 14" without a plan is unusable.
Corners and gaps between buildings are where the problems appear. Downwash from a tall facade, channelling between two blocks and corner acceleration are the three mechanisms that produce failures, and the receptor set should be designed to catch them rather than to avoid them.
Seasonal reporting conventions
Report summer and winter separately as well as annually. Comfort in a British summer and comfort in a January easterly are different questions, and an annual average conceals the result that matters for a cafe terrace.
The convention is to define the seasons by calendar months, state the definition used, and present the comfort category achieved at each receptor for each season. Safety results are normally reported on an annual basis, since the criterion concerns rare events.
Configurations also have to be reported separately, and there should be at least three:
- Existing, meaning the site as it stands with surrounding buildings as built.
- Proposed, with the development in place and no mitigation beyond what the architecture provides.
- Proposed with mitigation, where mitigation is needed.
Where a consented but unbuilt scheme sits nearby, a cumulative configuration is usually expected too, and the authority should be asked which consents it wants included.
Mitigation tested as a second configuration
Mitigation that has not been modelled is not mitigation, it is a hope. The second configuration has to be a real design with dimensions.
What gets tested, in rough order of effectiveness: changes to the massing itself, including setbacks, chamfered corners and podium levels, then canopies at entrances with their depth and height specified, then screens and baffles with their porosity stated, and last planting, which works only where the species, mature height and density are specified and the planting is secured.
Planting is where reports overreach. A row of 3 metre nursery trees does not deliver the wind reduction that a mature avenue does, and modelling the mature condition without saying so is the single most common criticism of these reports. Model both, or model the as-planted condition and say what happens as the trees establish.
The one honest uncertainty in this field is how well computational modelling predicts conditions in highly complex urban geometries. Practitioners disagree. Where the result is marginal at a sensitive receptor, wind tunnel testing is the defensible answer.
Presenting results so conditions can follow
A planning condition can only secure what the report has specified, so write the report with the condition in mind.
Present, for each receptor, the comfort category achieved in each configuration and season, the comfort category required for the intended activity, a pass or fail, and the safety result. Then list the mitigation measures with the receptors each one addresses and the drawing on which it appears.
That structure lets the authority impose a condition requiring the mitigation shown on specified drawings to be implemented before occupation, which is enforceable. A condition requiring "wind mitigation to be agreed" is not, and officers who impose it are storing up a discharge argument.
A Wind Microclimate Assessment sits alongside the other environmental studies on a tall building application, and the receptor sets should be coordinated rather than independently invented. Daylight work uses its own receptors and metrics, set out in our explainer on vertical sky component and the no sky line, and the views work has its own viewpoints, covered in our note on viewpoint selection and photomontage.
An illustrative example. A 22 storey residential tower on a corner site tests 46 receptors. Comfort criteria are met everywhere in summer. In winter, two receptors at the north-east corner and one at the main entrance fall two categories short, and the entrance receptor also fails the safety criterion. A mitigated configuration adding a 4 metre deep canopy at the entrance and a 2.5 metre perforated screen at the corner resolves all three, and the condition names the two drawings showing them.
This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. Wind microclimate assessments should be prepared by a suitably qualified specialist and professional review is strongly advised. Enter the postcode to see which supporting documents a site is likely to need.
PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
Why is the safety assessment reported separately from comfort?
Because it asks a different question against different parameters. Comfort uses hourly mean wind speeds exceeded no more than about 5 per cent of the time, while the distress criterion uses a gust equivalent mean speed at a far lower exceedance frequency. Merging them hides the result that matters most.
Should the study use a wind tunnel or computational modelling?
Both are accepted, and the report should say which was used and why. Wind tunnel testing on a scale model remains the defensible choice where surrounding massing is complex or where results are marginal at a sensitive receptor, because practitioners disagree about modelling accuracy in those conditions.
How should receptors be chosen?
Deliberately, and documented on a plan. Include every entrance to the proposed and neighbouring buildings, each area of public space with its intended activity recorded, upper level amenity space, surrounding pavements and crossings, and the building corners where downwash and channelling tend to produce failures.
Can planting be relied on as wind mitigation?
Only if the species, mature height and density are specified and the planting is secured by condition. Modelling a mature avenue while the drawings show nursery stock is the most common criticism of these reports. Model the as-planted condition as well, and explain what changes as the trees establish.
How many configurations should be modelled?
At least three: existing, proposed without mitigation, and proposed with mitigation where it is needed. A cumulative configuration including consented but unbuilt neighbouring schemes is usually expected too, and the authority should be asked which consents it wants taken into account.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.