Viability assessment sections a reviewer reads first
A planning viability reviewer rarely starts at page one. They go to benchmark land value, then build costs, then profit. Here is what each section has to prove.
A reviewer appointed by a local planning authority does not read a viability assessment front to back. They turn to benchmark land value, then the build cost basis, then the profit assumption, because those three inputs decide the residual figure and they are the three most often argued over. If you are scoping viability assessment sections for a major application, build the document so those answers are easy to find and fully evidenced, and expect everything in it to be published.
That last point shapes the whole exercise. The Planning Practice Guidance viability chapter starts from the position that assessments are made publicly available other than in exceptional circumstances, with any redaction justified. Write it for the objector who will read it as well as for the officer.
The scheme description and the input summary
Open with a short description of the application scheme and a single table of inputs. Unit numbers by type and tenure, net and gross internal areas, car parking, commercial floorspace by use class, the programme in quarters, and the policy requirement being tested. One page, no narrative.
Reviewers use that table to rebuild your appraisal in their own software. If they cannot, the first thing you will get is a request for the model in editable form, which costs two weeks.
State the policy position you are responding to as well. An appraisal that tests 20 per cent affordable housing against a 35 per cent policy requirement needs to say so plainly in the first section, with the development plan policy reference and the adopted date of the plan. The Affordable Housing Statement carries the tenure and mix narrative, so the appraisal can stay numerical and point across to it.
Gross development value and the comparable evidence
Gross development value is the sales and rental income the scheme is assumed to produce. Reviewers test it against your own comparables and their own.
For private sale housing, give a schedule of achieved prices per square metre from completed transactions within a defined radius and time window, adjusted for size, condition and date, with the adjustment reasoning shown. A headline average pound per square foot with no transaction list is the weakest part of most appraisals I see. For affordable units, show the registered provider bid basis or the transfer value assumption and say which it is. For commercial floorspace, give rent per square metre, the yield applied, the void and rent-free assumption, and the purchaser's costs deduction.
The common error is optimism on sales values paired with pessimism on costs. Reviewers look for exactly that asymmetry, and finding it undermines the parts of the appraisal that were fair.
Build costs and the basis of the cost plan
Say where the cost figures come from. A cost consultant's elemental cost plan, a measured estimate at a stated RIBA work stage, or published build cost data indexed to the appraisal date and the location factor applied. All three are acceptable. Silence is not.
| Cost line | What the reviewer checks |
|---|---|
| Base construction | Source, date, location factor, area measurement basis |
| External works | Percentage or measured, and consistency with the layout |
| Contingency | Rate and whether it double counts abnormals |
| Professional fees | Percentage of build cost, and whether planning fees sit here |
| Inflation | Index used and the period applied |
Tie the cost plan to the drawings in the application. If the appraisal assumes a basement and the plans do not show one, the reviewer will discount the whole cost line rather than query it.
Abnormal and infrastructure costs
Abnormals carry the heaviest evidence burden because they reduce the residual value directly. Each one needs a report behind it, not an allowance.
Remediation costs should trace to a site investigation and a remediation options appraisal. Demolition should trace to a measured schedule. Piling should trace to a geotechnical interpretation. Highway works under section 278 of the Highways Act 1980 should trace to a technical note or a quotation from the highway authority's design process. Where a scheme on a constrained site also needs a Basement Impact Assessment or extensive ground gas protection, the cost of those measures belongs here, cross-referenced to the report that justified them.
Infrastructure and planning obligations are separate lines. Community Infrastructure Levy liability goes in at the current indexed rate from the charging authority's published schedule, with the calculation shown. Section 106 contributions go in at the heads of terms figure under negotiation, clearly labelled as such.
Finance, fees and the profit assumption
Finance is usually modelled as a debit interest rate on the cash flow with an arrangement fee. Give the rate, the basis, and whether interest is charged on land at day one.
Profit is where the Planning Practice Guidance gives you a number to work with. It indicates that a return of 15 to 20 per cent of gross development value may be a suitable return to developers, while making clear this varies with risk, scheme type and tenure. If you argue above that band, the argument has to be specific to the site. A phased scheme with a long sales programme and genuine ground risk can justify it. A flat assertion about market conditions cannot.
Affordable housing is normally appraised at a lower return than private sale because the income is contracted. Show the split.
Benchmark land value and where disputes start
The guidance sets benchmark land value on the basis of existing use value plus a premium to the landowner, with the premium reflecting the minimum return at which a reasonable landowner would release the site. Alternative use value only applies where that alternative has permission or would plainly get it.
So the section needs three things in sequence. The existing use and its value, evidenced by rental income, a yield, or a land transaction for comparable existing use. The premium, with reasoning rather than a round percentage. And an explicit statement that the price actually paid for the site is not the benchmark, because the guidance is clear that the price paid does not justify a reduced policy contribution.
That last sentence is the one most appraisals leave out, and its absence reads as an argument the author knew would fail.
Residual value, sensitivity and what is published
Close with the residual land value output, the comparison against benchmark land value, and the surplus or deficit in pounds. Then sensitivity test it. Vary sales values by plus and minus five and ten per cent, build costs by the same, and the profit rate across the guidance band, and present the matrix as a table. One illustrative run on a 30 unit scheme showing a deficit at current values but a surplus at a five per cent uplift tells the officer more than ten pages of commentary, and it supports a review mechanism rather than a flat refusal of policy compliance.
If you are seeking redaction, list what and why, item by item. Blanket confidentiality requests are refused and delay determination.
A Viability Assessment sits alongside the rest of the major application evidence base, and the other documents feed it. The Health Impact Assessment screening work can generate mitigation costs that belong in your cost plan, and visual evidence prepared to the standards set out in our note on verified view methodology can drive design changes that move the cost base after submission. Build the appraisal late enough that it reflects the scheme you are actually applying for.
Viability work is a RICS regulated activity under the Financial Viability in Planning professional statement, and councils expect a suitably qualified author. PlanScope can draft the structure and the policy narrative around your figures, and you can see the full set of major application documents in the report library. The appraisal itself needs a valuer.
This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.
PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
Is a viability assessment always needed for affordable housing below policy?
No. The Planning Practice Guidance treats viability assessment at application stage as the exception, on the basis that policy requirements were tested when the plan was examined. You need to show why your site is different, usually through abnormal costs or an unusual existing use value, before the council will engage with an appraisal at all.
What profit margin will a council accept?
The guidance indicates 15 to 20 per cent of gross development value may be a suitable return, varying with risk and tenure. Affordable housing is normally appraised lower because the income is contracted. Anything above the band needs site-specific justification, such as a long phased sales programme or evidenced ground risk, rather than general market commentary.
Does the price I paid for the site count as the land value?
No. The guidance is explicit that the price paid does not justify a reduced contribution towards policy requirements. Benchmark land value is derived from existing use value plus a premium to the landowner. Overpaying is a commercial decision, and the planning system does not treat it as a cost of development.
Will my viability assessment be published?
Expect it to be. The guidance starts from the presumption that assessments are made publicly available other than in exceptional circumstances, and that redactions are justified item by item. Write it knowing objectors, consultees and the local press can read it, and avoid including commercially sensitive material you cannot defend disclosing.
Who should prepare the appraisal?
A valuer or viability consultant working to the RICS Financial Viability in Planning professional statement. Councils and their reviewers test the competence of the author, and an appraisal prepared without valuation input carries little weight. A planning consultant can write the policy narrative around it, and the two documents should be consistent.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.