Refusals and Appeals

Appeal site visits where internal access is needed

6 min readBy PlanScope Editorial Team

Nobody can make a neighbour let an inspector inside. When internal access really matters, how to request it, and the measured evidence that works when it is refused.

Most planning appeals are decided after an unaccompanied site visit, where the inspector looks at the site from the public highway and from any land they can lawfully enter. The moment your case depends on something that cannot be seen from the pavement, that changes: the visit has to be accompanied, and somebody has to arrange access. Where the thing in dispute sits inside a neighbour's house, nobody can compel it.

So the appeal site visit access question is worth settling in the appeal form, not three weeks before the inspector arrives.

Accompanied and unaccompanied visits

The Inspectorate asks, at the appeal and questionnaire stage, whether the site can be seen from public land. Answer that question honestly and specifically.

An unaccompanied visit happens without either party present. The inspector goes when it suits them, usually within the decision period, and you will not be told the date. They can enter land the appellant owns if arrangements have been made, and they can look from any public vantage point.

An accompanied visit is arranged for a fixed date with both parties invited. It is required where the inspector needs to enter the appeal site and arrangements cannot be made for unsupervised entry, or where third party land has to be entered. On inquiries the procedure rules provide for an accompanied inspection after the inquiry closes if either main party asks for one. Where only one party attends, the other must still have been invited.

The distinction matters for programming. An accompanied visit on a written representations appeal usually adds a few weeks, because it has to be diarised around the inspector's other cases.

When internal access is actually necessary

Be hard-headed about this, because asking for an accompanied visit you do not need costs time.

Internal access is needed in four situations:

  • The appeal concerns internal alterations to a listed building, where the fabric and plan form are the issue.
  • A conversion case turns on floor-to-ceiling heights, structural condition or the practicality of the layout.
  • A loss of light or outlook case turns on the view from, and the daylight reaching, a specific habitable room in a neighbouring property.
  • An enforcement appeal turns on how a building is actually occupied internally, for example whether a dwelling has been subdivided.

Internal access is usually not needed for ridge height disputes, overlooking between upper windows, parking stress, or character and appearance. Those are answerable from outside with measured drawings, sections and photographs.

Where the case is about light, the quantified answer carries more weight than the visit. A Daylight and Sunlight Assessment prepared to BRE 209 gives vertical sky component and annual probable sunlight hours figures for the affected windows, and an inspector who has those numbers does not need to stand in the room to understand the effect.

Arranging access to a neighbour's land

Nobody can require a neighbour to let an inspector in. Not the council, not the Inspectorate, not you.

What works is a short, plain written request, sent early and copied to the Inspectorate case officer. Explain who the inspector is, that the visit will take a few minutes, that no discussion of the merits will take place inside the property, and that you will not attend if they would rather you did not. Offer two or three dates. Objectors who want the inspector to see the effect on their room are often willing, because it is their case too.

Keep the correspondence. A refusal is not fatal, but an unanswered request looks like no request at all, and the inspector will be told what happened.

If access is refused, say so in your statement and explain how the evidence covers the gap. Do not leave the inspector to discover the problem on the day.

What the inspector will and will not discuss

An accompanied visit is an inspection, not a hearing. The inspector will ask to be shown features and will listen to factual answers about what is where. They will not take submissions on the merits, will not accept documents, and will stop any attempt to argue the case.

That rule is strictly applied, and for good reason: the other party may not be present at every point and there is no record of what is said. A consultant who tries to slip in an argument at the gate damages their client's credibility for the cost of nothing.

Three things you can usefully do. Point out viewpoints identified in your evidence, by reference to the photograph numbers. Confirm measurements on request. And say plainly when something has changed on site since the application, because the inspector determines the appeal on the position as they find it.

Preparing the site for the visit

A site that is legible saves the inspector guessing, and guesswork rarely favours the appellant.

  1. Mark the proposed footprint on the ground with spray line or pegs, and label the corners.
  2. Set story poles or ranging rods at the proposed ridge and eaves heights where height is in dispute, with the heights written on them.
  3. Clear safe access to every part of the site the inspector needs to reach, including the rear boundary.
  4. Bring one A3 drawing pack and a photograph location plan, and nothing else.
  5. Deal with health and safety: fence open excavations, provide hard hats on construction sites, and warn about livestock or dogs.

Levels work is worth the effort on sloping sites. Where a scheme is refused on scale and the council's case rests on a ridge height comparison, a surveyed level on the pavement with the existing and proposed ridges marked relative to it answers the point faster than any amount of prose. The same principle drives the evidence that answers parking refusals: measure it, do not describe it.

Illustrative example: a rear extension refused on loss of light to a neighbour's kitchen window. The appellant marks the proposed rear wall on the ground, sets a rod at the proposed eaves, and supplies a section through both properties with the 25-degree and 45-degree lines drawn. The neighbour declines internal access. The inspector can still see the relationship from the garden, and the section does the rest.

Photographs where access is refused

Photographs are the substitute for the room you cannot get into, and they need to be done properly to carry weight.

Take them from the nearest lawful position, which may be your own upper window looking at the affected elevation. Date every image, number it, and plot the camera position and direction on a location plan. Use a consistent focal length and say what it was, because a wide angle flattens separation distances and an inspector who spots that will discount the set.

Where the dispute is about an internal condition you cannot photograph, substitute measured evidence: a section, a floor plan with dimensions taken from the register drawings, or a surveyor's note. An inspector will accept a drawn answer. What they will not accept is an assertion about a room nobody has produced any evidence about.

If the procedural choice is still open, consider whether a hearing suits the case better than written representations, because a hearing gives the inspector the chance to ask questions about the evidence immediately after the inspection. The trade-offs are set out in choosing between written representations, a hearing and an inquiry.

PlanScope drafts the supporting documents behind an appeal case, from the Planning Statement to the specialist assessments, and you can enter a postcode to see which ones a site is likely to need.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

When is an accompanied site visit required?

Where the inspector needs to enter the appeal site and unsupervised entry cannot be arranged, or where third party land has to be entered. On inquiries the procedure rules provide for an accompanied inspection after the inquiry closes if either main party requests one. Both parties must be invited even if only one attends.

Can an inspector require a neighbour to allow access?

No. Entry to third party land depends on the occupier's consent, and neither the Inspectorate nor the council can compel it. Make the request in writing early, copy the case officer, offer alternative dates and keep the correspondence. A refusal is not fatal provided your evidence covers the gap.

Can I discuss the merits at an accompanied visit?

No. The inspector will look at features you point out and accept factual answers about measurements and what is where, but will not take submissions, accept documents or allow argument. The rule is applied strictly because there is no record of what is said and the other party may not hear it.

What should I put on site before the visit?

Mark the proposed footprint on the ground with labelled corners, set rods at the proposed ridge and eaves heights where height is disputed, clear safe access to the rear boundary, and bring one A3 drawing pack with a photograph location plan. On sloping sites, a surveyed datum level is worth the cost.

How should photographs be presented if access is refused?

Take them from the nearest lawful position, date and number every image, and plot camera positions and directions on a location plan. State the focal length used, because wide angle lenses flatten separation distances and an inspector who notices will give the set less weight.

Does a daylight assessment replace an internal inspection?

Often it does. An assessment prepared to BRE 209 reports vertical sky component and annual probable sunlight hours for each affected window, which answers the question numerically. An inspector with those figures and a section through both properties rarely needs to stand in the room to understand the effect.

Sources and further reading

planning appealssite visitdaylight and sunlightappeal evidenceplanning inspectorate

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Refusals and Appeals

View all →
Refusals and Appeals7 min read

Appeal timetables after the inquiry reform changes

Since the 2019 review, inquiry appeals run to an early fixed date and a managed timetable. What that moves forward, and how to staff and sequence the work.

Read article →
Refusals and Appeals6 min read

Appealing where a consultee objection was later withdrawn

A withdrawn consultee objection leaves the refusal reason without evidence. How to pin the council's position, build the costs record and choose between appeal and resubmission.

Read article →
Refusals and Appeals7 min read

Rebutting an ecology refusal where surveys were missing

An evidence refusal on ecology can usually be answered. The survey windows, the reasonable likelihood threshold and the condition wording to offer the inspector.

Read article →
Refusals and Appeals6 min read

Dealing with a new refusal reason in the appeal statement

Councils widen their case on appeal more often than they admit. How to object, answer in the alternative and build the costs record when a new refusal reason appears.

Read article →
Refusals and Appeals6 min read

Appealing where the refusal cites a policy not in the plan

A policy outside the development plan is a material consideration, not a requirement. How to frame the appeal, weigh emerging policy and handle a notice with no policy reference.

Read article →
Refusals and Appeals7 min read

The inspector's power to vary conditions on appeal

Section 79 lets an inspector treat the application as if made to them, so conditions can be rewritten, deleted or added. Including the risk in appealing a single condition.

Read article →