Rebutting an ecology refusal where surveys were missing

7 min readBy PlanScope Editorial Team

An evidence refusal on ecology can usually be answered. The survey windows, the reasonable likelihood threshold and the condition wording to offer the inspector.

A refusal that says the application is unacceptable because no bat survey was submitted is not the same as a refusal that says bats are present and will be harmed. The first is an evidence refusal and it can usually be answered. An ecology refusal missing survey appeal turns on two questions: was there a reasonable likelihood of protected species being present and affected, and could the point have been dealt with by condition rather than refusal?

Answer both, supply the survey you can supply, and be honest about the one you cannot.

Why authorities refuse on survey grounds

National guidance on the natural environment expects survey information to be available before a decision is made where there is a reasonable likelihood of a protected species being present and affected by the development. Councils lean on that, on the duty in section 40 of the Natural Environment and Rural Communities Act 2006, and on the offences in the Wildlife and Countryside Act 1981.

The reasoning is defensible in principle. An authority that grants permission without knowing whether a roost exists has not assessed the effect of the development, and it cannot condition its way out of a decision it was required to make.

Where the refusal becomes vulnerable is in the first limb. Reasonable likelihood is a threshold, not a presumption. A 1990s flat-roofed garage with sealed soffits, no ridge, no gaps and no roof void has negligible bat roost potential, and a refusal for want of an emergence survey on that building is asking for evidence that would tell nobody anything.

Survey seasons and the timing problem

The seasons are the reason these refusals exist, and they are also the reason the appeal is often the pragmatic route.

Survey Window
Preliminary roost assessment for bats Any time of year
Bat emergence and re-entry surveys May to September, best May to August
Great crested newt eDNA sampling 15 April to 30 June
Reptile presence surveys April to October, best April to May and September
Breeding bird surveys March to August
Hazel dormouse April to November
Water vole April to September

Set that against an eight week determination period and the problem is obvious. An application validated in October cannot produce an emergence survey until the following May, and a council unwilling to agree an extension of time will refuse rather than wait.

So the first thing to check is what was actually asked for and when. Where the authority requested surveys in week six of an eight week period, that chronology belongs in the appeal statement.

Submitting surveys with the appeal

An appeal is a rehearing, so evidence that was not before the council can be put before the inspector. That is the starting point, and it is why a delayed survey is worth waiting for if the season is close.

Three cautions apply.

  1. The council and any consultee need the chance to comment on new survey material, which can add weeks to the timetable or prompt a change of procedure.
  2. Where the new survey finds a roost or a population, the inspector has to assess the effect and consider the licensing position, which is a bigger task than the original application presented.
  3. Submitting substantial new evidence late invites an argument that the appeal has become a different case, and in a bad month it invites a costs application against you.

The cleanest position is a complete ecology package filed with the appeal: a Preliminary Ecological Appraisal establishing the habitats and the likelihood of species presence, the relevant Protected Species Survey results, and a mitigation strategy. Protected species survey work and any mitigation licence require a suitably licensed ecologist under the Wildlife and Countryside Act 1981 and the habitats regulations, so this is not a document to draft and submit without one.

Conditions as an alternative to refusal

The argument that the council should have conditioned rather than refused is strong in some cases and hopeless in others, and the dividing line is whether the missing information goes to the principle of the development.

Where presence is established and the only open question is the detail of mitigation, a condition requiring a method statement is normal practice. Where the survey would determine whether the development can proceed at all, a condition deferring it is unlawful in substance, because the authority would be granting permission for development it has not assessed.

Between those poles sits the case that most appeals are about: a building with low but not negligible roost potential. Here the workable offer is a two-part condition. No works to the building until a preliminary roost assessment and, if the assessment recommends it, emergence surveys have been submitted and approved, together with any mitigation. That gives the authority its information before anything is disturbed, and it gives the appellant a permission.

Offer the wording in the appeal statement. Inspectors are more willing to impose a condition somebody has drafted than to invent one.

The precautionary approach and its limits

Councils sometimes refuse on the basis that in the absence of a survey they must assume the worst. That is a reasonable instinct and a poor planning judgement.

The precautionary approach guides how uncertainty is handled, not whether evidence is needed. Where a competent ecologist has carried out a daytime inspection and recorded no features suitable for roosting, no droppings, no staining and no access points, the conclusion of negligible likelihood is itself evidence. A refusal that treats it as nothing has substituted a general concern for a site-specific assessment.

Two points carry weight on appeal. First, the standard guidance ecologists work to is tiered: a preliminary assessment determines whether further survey is needed, and it is designed to be relied on where it finds nothing. Second, an authority has to apply the same threshold consistently, and an appellant who can point to permissions granted on comparable buildings without emergence surveys has a fairness argument worth making.

The licensing position in the appeal case

Where surveys do confirm a protected species, the appeal has to deal with licensing, because the inspector will want to know whether a licence is likely to be granted.

That means addressing the derogation tests in the habitats regulations: that there is no satisfactory alternative, that the development is needed for reasons of overriding public interest or another permitted purpose, and that the favourable conservation status of the species will be maintained. For a single dwelling the second test is the hard one, and the honest answer is usually that the licence is sought under the provisions relating to works to buildings rather than on public interest grounds.

A letter from the appointed ecologist stating that a licence application is expected to succeed, with reasons, is worth more than argument. Where the species is great crested newt, check whether a district level licensing scheme operates in the area, because it changes both the cost and the programme.

Illustrative example: a barn conversion refused for want of a bat survey in November. The appellant commissions a preliminary roost assessment immediately, which finds moderate potential, carries out two emergence surveys the following May, identifies a small day roost, and files the appeal in June with a mitigation strategy and a bat loft design. The ecology reason falls away as an evidence point and becomes a question about the mitigation detail.

Avoiding the refusal next time

The fix is scheduling, not drafting. Commission the preliminary assessment before the design is finished, because it tells you which season you are working to.

Where the season has already passed, the choice is between applying and risking refusal, agreeing an extension of time with the authority, or waiting. An extension of time is usually the better bargain, and the note on whether to withdraw and resubmit or appeal sets out how that decision looks once a refusal has already been issued.

Remember the biodiversity gain condition applies in parallel. A Biodiversity Net Gain Assessment under the Environment Act 2021 regime expects the statutory metric to be completed by a competent person and the gain plan to be approved by the authority, so the ecologist you appoint for survey work should be briefed on both.

PlanScope drafts the planning and supporting documents around that specialist work, and you can see which reports your site is likely to need before commissioning anything.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. For specialist technical reports, qualified professional input may be required. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Can a council refuse permission just because no bat survey was submitted?

It can where there is a reasonable likelihood of a protected species being present and affected, because national guidance expects that information before a decision. Reasonable likelihood is a threshold rather than a presumption, so a building with negligible roost potential assessed by a competent ecologist should not attract that refusal.

Can I submit the survey with my appeal instead?

Yes. An appeal is a rehearing, so evidence not before the council can be put before the inspector. Expect the council and any consultee to be given the chance to comment, which adds weeks, and expect an argument about costs if the material is substantial and arrives late in the timetable.

Why can't the survey just be conditioned?

It can where presence is established and only the mitigation detail is outstanding. It cannot where the survey would determine whether the development should be permitted at all, because the authority would be approving development it has not assessed. Low potential buildings sit between, and a two-part condition often works.

When can bat emergence surveys be carried out?

Between May and September, with May to August the optimal period under the standard good practice guidance. A preliminary roost assessment can be done at any time of year and determines whether emergence surveys are needed at all, which is why it should be commissioned before the design is finalised.

What should the appeal say about licensing?

It should address the derogation tests in the habitats regulations: no satisfactory alternative, a permitted purpose for the works, and maintenance of the favourable conservation status of the species. A reasoned letter from the appointed ecologist stating that a licence is expected to be granted carries more weight than argument.

Who is allowed to carry out protected species survey work?

A suitably licensed ecologist. Survey work involving disturbance and any mitigation licence are regulated under the Wildlife and Countryside Act 1981 and the habitats regulations, so this is not work an applicant can do themselves. A draft report is a starting point for that professional, never a substitute for them.

Sources and further reading

ecologybat surveyplanning appealsprotected speciessurvey season

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Refusals and Appeals

View all →
Refusals and Appeals7 min read

Rebutting a refusal based on cumulative impact

A saturation refusal rests on a threshold, a count and an assertion of harm. The counting errors to look for, and the order to argue the appeal grounds in.

Read article →
Refusals and Appeals7 min read

Appeal timetables after the inquiry reform changes

Since the 2019 review, inquiry appeals run to an early fixed date and a managed timetable. What that moves forward, and how to staff and sequence the work.

Read article →
Refusals and Appeals6 min read

Appealing where a consultee objection was later withdrawn

A withdrawn consultee objection leaves the refusal reason without evidence. How to pin the council's position, build the costs record and choose between appeal and resubmission.

Read article →
Refusals and Appeals6 min read

Appeal site visits where internal access is needed

Nobody can make a neighbour let an inspector inside. When internal access really matters, how to request it, and the measured evidence that works when it is refused.

Read article →
Refusals and Appeals6 min read

Dealing with a new refusal reason in the appeal statement

Councils widen their case on appeal more often than they admit. How to object, answer in the alternative and build the costs record when a new refusal reason appears.

Read article →
Refusals and Appeals6 min read

Appealing where the refusal cites a policy not in the plan

A policy outside the development plan is a material consideration, not a requirement. How to frame the appeal, weigh emerging policy and handle a notice with no policy reference.

Read article →