Refusals and Appeals

The inspector's power to vary conditions on appeal

7 min readBy PlanScope Editorial Team

Section 79 lets an inspector treat the application as if made to them, so conditions can be rewritten, deleted or added. Including the risk in appealing a single condition.

An inspector deciding a section 78 appeal is not confined to the conditions the council imposed. Section 79 of the Town and Country Planning Act 1990 lets them deal with the application as if it had been made to them in the first instance, and lets them reverse or vary any part of the council's decision whether or not the appeal relates to that part. So an inspector vary conditions appeal outcome can include a condition nobody argued for, the deletion of one both parties wanted kept, or the refusal of a permission the council had granted.

That last possibility is the one to understand before appealing a condition on its own.

What powers the inspector inherits

Section 79(1) gives three powers: to allow or dismiss the appeal, to reverse or vary any part of the decision, and to deal with the application as if made at first instance. The third is the widest. It means the inspector stands in the authority's shoes and reconsiders the application on its merits as at the date of the decision they are making, applying the development plan and material considerations as they are then.

Conditions follow from that. The inspector may impose any condition the authority could have imposed, and the six tests in Planning Practice Guidance apply to them: necessary, relevant to planning, relevant to the development permitted, enforceable, precise, and reasonable in all other respects.

Two limits are worth noting. On an appeal against the refusal of a section 73 application, the inspector's scope is bounded by the conditions in issue, because that is what the application was about. And an inspector cannot grant something outside the application as made, so a new condition cannot be used to expand the development.

The risk in appealing a condition alone

Because the inspector deals with the application at first instance, an appeal against a single condition opens the whole permission. In principle the inspector can conclude that the development is unacceptable and dismiss the appeal in a way that leaves the appellant worse off, or impose other conditions the appellant did not expect.

In practice inspectors are cautious about using that power to undo an unappealed grant, and the usual outcome of a condition appeal is a decision on the condition. But the risk is real enough that it belongs in the advice to the client, particularly where the permission is valuable, the policy position has moved against the scheme since the grant, or the development is partly built.

Where the condition is unwelcome but the permission is sound, the safer routes are often a section 73 application to vary the condition, or a conversation with the authority about a variation by agreement. The comparison with other routes is set out in withdraw and resubmit or appeal, making the call.

Varying a condition the council imposed

Most condition decisions turn on whether the condition meets the six tests rather than on planning merits in the round.

Defect What it looks like Likely outcome
Imprecise "Materials to be agreed" with no mechanism Reworded, not deleted
Unnecessary Duplicates the Building Regulations or another regime Deleted
Not enforceable Requires action by a third party the applicant cannot compel Reworded as a Grampian condition or deleted
Unreasonable So onerous it makes the permission impossible to implement Deleted, occasionally fatal to the permission
Irrelevant Controls something unconnected with the development Deleted

The strongest arguments are technical. A condition requiring approval of a scheme that already forms part of the approved drawings is unnecessary and inspectors delete it without much argument. A condition that fails for imprecision usually gets rewritten rather than removed, because the inspector will protect the planning purpose behind it.

Adding a condition nobody asked for

Inspectors do add conditions, and the ones they add most often are those that make an otherwise unacceptable scheme acceptable. A restriction on hours of use, a limit on the number of occupants, a requirement for a landscape scheme, a condition removing permitted development rights on a tightly planned plot.

Fairness constrains the process. Where an inspector is minded to impose a condition that has not been canvassed, the parties should be given an opportunity to comment on the wording, and on written representations appeals that usually means a short round of correspondence from the Inspectorate. Appellants who receive such a letter should answer it with proposed wording rather than resisting the condition in principle, because a condition the inspector has decided is needed will be imposed in some form.

Conditions that must be met before work starts

Section 100ZA of the Town and Country Planning Act 1990, with the regulations made under it, restricts the imposition of a condition that must be satisfied before development begins unless the applicant has given written agreement to it, subject to the exceptions in those regulations.

This bites on appeals. An inspector who wants a pre-start condition will normally invite the appellant's written agreement, and an appellant who refuses may find the inspector concludes the development cannot be made acceptable at all. The tactical answer is usually to agree to a reasonable pre-start condition and negotiate its wording, rather than to refuse and invite a dismissal.

Where the list of such conditions is long, the better exercise is to go through them before the appeal and identify which could be reworded as conditions precedent to occupation instead, which keeps site mobilisation unblocked.

Inviting the inspector to recondition

The most useful thing an appellant can do is hand the inspector a workable set of conditions. Inspectors are drafting under time pressure, and a clear, agreed list is adopted far more often than it is rewritten.

  1. Agree as much of the list with the council as possible, and record the agreement in a statement of common ground.
  2. Present the conditions in a schedule with the reason for each one and the policy it serves.
  3. Mark which conditions are agreed, which are disputed and what the dispute is.
  4. Offer alternative wording for anything disputed, so the inspector has a choice rather than a gap.
  5. Keep the number down. A list of 30 conditions invites the inspector to question whether the scheme is acceptable at all.

Where a condition could save an appeal that would otherwise fail, say so explicitly in the statement of case. An inspector will not invent the solution for you, and an appellant who identifies the condition that answers the refusal reason gives the inspector a route to allowing the appeal. The same reasoning applies to the evidence offered on specific grounds, such as parking refusals and the evidence that answers them.

Drafting suggested conditions

Write them as the inspector would have to write them. Each condition needs a trigger, an obligation, an approval mechanism where one is needed, and a reason tied to a policy. Avoid conditions that require something "to the satisfaction of the Council" without a submission and approval step, because that formulation fails the precision test.

State the drawing numbers and revisions in the approved plans condition exactly as submitted on appeal, not as submitted to the council, since amended plans often go in with the appeal. Getting that wrong produces a permission that does not match the scheme.

The reasoning behind each condition belongs in the appeal statement, and the Planning Statement submitted with the original application is where the policy framing should already be set out. Where the appeal route itself is still being chosen, that decision interacts with how conditions can be discussed, as set out in choosing between written reps, a hearing and an inquiry.

Browse all 66 PlanScope report types and start a draft.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Can an inspector change a condition that was not appealed?

Yes. Section 79(1) of the Town and Country Planning Act 1990 allows the inspector to reverse or vary any part of the council's decision whether or not the appeal relates to that part, and to deal with the application as if it had been made to them in the first instance. That extends to conditions nobody raised.

Is it risky to appeal against a single condition?

It carries a theoretical risk, because dealing with the application at first instance opens the whole permission, and an inspector could in principle conclude the development is unacceptable. Inspectors are cautious about undoing an unappealed grant, but the risk belongs in the advice where the permission is valuable or the policy position has moved.

What tests does a condition have to meet?

The six tests in Planning Practice Guidance: necessary, relevant to planning, relevant to the development permitted, enforceable, precise, and reasonable in all other respects. Most condition appeals are won on one of these rather than on planning merits. A condition failing for imprecision is usually rewritten rather than deleted.

Can an inspector impose a condition that must be met before work starts?

Only within the exceptions in the regulations made under section 100ZA of the Town and Country Planning Act 1990, which otherwise requires the applicant's written agreement. An inspector will normally invite that agreement. Refusing it can lead the inspector to conclude the development cannot be made acceptable, so negotiating the wording is usually the better course.

How should suggested conditions be presented on appeal?

As a schedule marking which are agreed with the council and which are disputed, with the reason and policy for each and alternative wording for anything contested. Record agreement in a statement of common ground. Keep the list short, because a very long list invites the inspector to question whether the scheme is acceptable.

Sources and further reading

appealsconditionsplanning inspectoratesection 79procedure

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Refusals and Appeals

View all →
Refusals and Appeals7 min read

Appeal timetables after the inquiry reform changes

Since the 2019 review, inquiry appeals run to an early fixed date and a managed timetable. What that moves forward, and how to staff and sequence the work.

Read article →
Refusals and Appeals6 min read

Appealing where a consultee objection was later withdrawn

A withdrawn consultee objection leaves the refusal reason without evidence. How to pin the council's position, build the costs record and choose between appeal and resubmission.

Read article →
Refusals and Appeals7 min read

Rebutting an ecology refusal where surveys were missing

An evidence refusal on ecology can usually be answered. The survey windows, the reasonable likelihood threshold and the condition wording to offer the inspector.

Read article →
Refusals and Appeals6 min read

Appeal site visits where internal access is needed

Nobody can make a neighbour let an inspector inside. When internal access really matters, how to request it, and the measured evidence that works when it is refused.

Read article →
Refusals and Appeals6 min read

Dealing with a new refusal reason in the appeal statement

Councils widen their case on appeal more often than they admit. How to object, answer in the alternative and build the costs record when a new refusal reason appears.

Read article →
Refusals and Appeals6 min read

Appealing where the refusal cites a policy not in the plan

A policy outside the development plan is a material consideration, not a requirement. How to frame the appeal, weigh emerging policy and handle a notice with no policy reference.

Read article →