Betting shops and payday lenders: no class, no shortcut
Since 2015 a betting office or payday loan shop has sat outside every use class. No permitted change applies, the gambling licence is a separate process, and frontage policies do the heavy lifting.
A betting office or a payday loan shop sits outside every use class in England. That has been the position since April 2015, when both were taken out of the former Class A2 financial and professional services class and made sui generis, and the 2020 rewrite of the Use Classes Order did not bring them back in. The practical result is simple: the betting office use class question has no answer, because there is no class, so any change of use into one needs a full planning application.
No prior approval route. No permitted change from a vacant shop. An application, a fee, a consultation period and a decision on the development plan.
Why these uses were taken out of the shops class
Before 2015, a betting office fell within Class A2 alongside banks, building societies and estate agencies, and the General Permitted Development Order allowed a shop to become an A2 use without an application. Councils in high streets with heavy clustering argued they had no planning control over what was arriving.
The 2015 amendments removed betting offices and payday loan shops from the class and listed them as uses to which no class applies. The policy aim was control, and control is what authorities now exercise.
Pawnbrokers were treated differently and were generally understood to remain within the former A2 class, which after September 2020 means they fall inside Class E. That asymmetry still surprises people: two shops on the same parade, offering adjacent financial services, can sit on opposite sides of the permitted development line. Adult gaming centres and bingo premises are separate again, each with their own position in the Order, so identify the exact activity before you work out the route.
The licensing regime running alongside
Gambling premises need a premises licence from the licensing authority under the Gambling Act 2005, and that process is independent of planning.
The Act sets licensing objectives covering crime, fairness and the protection of children and vulnerable people, and the authority is directed to aim to permit the use of premises for gambling so far as it is consistent with those objectives, the regulator's codes of practice and its own statement of licensing policy. Need is not a licensing consideration. Nor, in general, is demand.
Two consequences follow. A licence granted on the aim-to-permit basis is not evidence that the use is acceptable in planning terms, and a planning refusal is not a licensing objection. Run the two applications in parallel, and keep the documents distinct: a licensing operating schedule is not a Planning Statement, and submitting one as the other invites both to be read badly.
Payday lenders are regulated by the Financial Conduct Authority rather than licensed by the council, so for those premises the planning application is the only local consent in play.
Frontage and clustering policies
This is where applications are actually decided. Most town centre local plans contain policies that do some or all of the following.
| Policy device | What it controls |
|---|---|
| Frontage proportion | A cap on the percentage of a defined frontage in non-retail use |
| Minimum separation | A stated distance to the nearest comparable premises |
| Unit count caps | A maximum number of a given use within a defined centre or parade |
| Primary frontage protection | Resistance to any non-shop use in the primary shopping frontage |
| Vitality and viability test | A general assessment of the effect on the centre's character and function |
The evidence to answer them is factual and local. A frontage survey, carried out on foot, recording the use of every unit in the defined frontage with its address and floor area, mapped and tabulated. A distance measurement to the nearest comparable premises, taken along the street. A vacancy record for the application unit, with marketing evidence if the argument is that no retail occupier could be found.
Assertions about regeneration or investment carry little weight against a numerical frontage policy. The survey does.
Hours, shutters and window displays
Three operational matters attract conditions.
Opening hours are usually restricted, and for a gambling use the restriction often bites at the late end rather than the early one. Offer hours in the application rather than waiting for a condition, because an officer who has to invent a restriction will usually pick a tighter one than you would.
External shutters are building operations. Solid roller shutters with their boxes on the facade need planning permission in most situations, and in a conservation area or on a listed building they will be resisted in favour of open-grille shutters, internal shutters or laminated glazing. The fascia and any projecting sign need advertisement consent under the 2007 Regulations unless they fall within a deemed consent class, and illuminated signage in a conservation area generally does not.
Window treatment is the third. Full-height vinyls and obscured glazing remove active frontage and councils control them by condition, sometimes requiring a stated percentage of the shopfront to remain clear. That condition is easier to live with if you design the fit-out around it.
Evidence councils expect on local impact
Four categories, and only the first two are within your gift.
The frontage and separation evidence described above, which you produce. The transport position, which on a small town centre unit means servicing, deliveries and cycle parking rather than trip generation, and is normally covered by a short Transport Statement or by a paragraph in the planning statement where the unit is in a highly accessible location.
Then two categories where the evidence has to be published or it is worthless. Statements about crime and antisocial behaviour need a source: recorded crime data for the relevant area, or a representation from the police. Statements about problem gambling prevalence need a published study, cited by author and year. Neither can be asserted, and an application that asserts them invites the objectors to do the same in the opposite direction.
Where the local authority has adopted a statement of gambling licensing policy with a local area profile, read it. It will tell you which parts of the borough the authority regards as sensitive, and that reasoning often reappears in the planning officer's report even though it belongs to a different regime.
Returning the unit to a Class E use
The reverse direction is easier, because the Order has long contained rights allowing certain sui generis town centre uses, including betting offices and payday loan shops, to change to a Class E use or to dwellinghouses, subject to prior approval and to the limitations in the relevant Part 3 class.
Two cautions. The class lettering in Schedule 2 Part 3 was reworked when Class E was created in 2020, so a note written before then will send you to the wrong class. And prior approval is not a formality: the matters for consideration, which can include transport, contamination, flooding and noise depending on the class, have to be addressed and can be refused.
Check the current text of the Order before you rely on any permitted change. The position for other uses outside the classes is covered in other sui generis uses and the consents they need, and the related question of where a members club sits is discussed in Class F2 or sui generis.
Conditions to watch on an existing consent
Before anything else, read the planning history of the unit.
A consent granted for a betting office in, say, 2011 may be conditioned to that use only, in which case the sui generis status is reinforced by the condition and a fresh application is needed for any change. A consent granted for A2 use before 2015 does not entitle the occupier to operate as a betting office now, because the use is no longer within that class. And a unit that has operated as a betting office without permission for a long period may have become lawful through the passage of time, which is a matter for a certificate of lawfulness of existing use rather than an assumption.
Order the planning history from the authority, read every decision notice and every condition, and only then decide which application you are making. Browse all 66 report types to see which supporting statements the application will need alongside the frontage survey.
This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
Can a shop become a betting office without planning permission?
No. A betting office has been sui generis since April 2015, so the change from any use class into it is a material change of use needing a full planning application. That is true whether the unit was last a shop, an office, a bank or a cafe, because the permitted changes in the General Permitted Development Order do not include a change into a betting office.
Does a gambling licence settle the planning position?
No. The licensing authority applies the Gambling Act 2005 licensing objectives and the regulator's codes, and it is directed to aim to permit where those objectives are met. Planning applies the development plan and material considerations. The two run in parallel and either can be refused while the other is granted, so apply for both and do not assume one follows the other.
What evidence do councils want on local impact?
Usually three things: the proportion of the frontage already in non-retail or similar use, the distance to the nearest comparable premises, and the effect on the character and function of the centre. Some authorities also ask for evidence on crime and antisocial behaviour, which must come from published sources rather than assertion.
Can a betting office be turned back into a shop or cafe?
There are permitted development rights allowing some sui generis town centre uses to change to a Class E use or to housing, subject to prior approval and to the conditions and limitations in the Order. The lettering of those classes changed after the 2020 reform, so check the current text of Schedule 2 Part 3 rather than relying on an older note.
Do window displays and shutters need consent?
Signage generally needs advertisement consent under the 2007 Regulations unless it falls within the deemed consent categories. Solid external roller shutters are building operations and frequently need planning permission, and in conservation areas councils resist them in favour of open-grille or internal shutters. Internal vinyls covering the full window are often controlled by condition on the use itself.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.