Cinemas, bingo halls and dance halls after the 2020 reform
The 2020 rewrite of the Use Classes Order split the old assembly and leisure class apart. Cinemas and bingo halls came out as sui generis, so every change needs permission.
Before 1 September 2020 a cinema, a concert hall, a bingo hall, a dance hall, a gym, a swimming pool and a skating rink all sat in one class: the old Class D2 for assembly and leisure. Movement between them needed no planning application. The 2020 amendment regulations took that class apart, and the cinema use class 2020 position is now the shortest answer in the Order. There is no class. A cinema is sui generis, and so are concert halls, bingo halls and dance halls.
The practical effect is control. Councils can now refuse a change into any of those uses, and can refuse a change out of them.
Where these uses sat before September 2020
Class D2 covered a wide spread of assembly and leisure activity, which made it a useful class for operators and an unpopular one with authorities. A cinema could become a bingo hall without reference to the council, and a gym could take either building.
The reform split the class three ways.
| Use | Position since 1 September 2020 |
|---|---|
| Cinema, concert hall, bingo hall, dance hall | Sui generis |
| Indoor sport, recreation and fitness | Class E(d) |
| Swimming pool, skating rink | Class F2 |
| Outdoor sport or recreation | Class F2 |
| Hall or meeting place for the local community | Class F2 |
| Live music venue, nightclub, theatre | Sui generis, as before |
Theatres were already outside the classes before the reform, and they remain so. That continuity matters, because it means the pre-2020 case law and practice about theatre uses still reads across, while the new sui generis uses have a much shorter history.
Why they became sui generis
The policy reasoning was about town centres. Giving authorities control over the arrival and the loss of larger leisure uses lets them manage clustering, hours, noise and the vitality of a centre, in the same way the 2015 changes gave them control over betting offices.
Some operators lost flexibility they valued. A bingo hall that could previously have been converted to a gym without an application now needs permission for that change, unless a permitted development right in Schedule 2 Part 3 applies to it. Check the current text rather than a summary, because Part 3 was reworked when Class E was created and the class letters moved.
The one-way nature of some rights is worth noting. Rights that allow movement from sui generis town centre uses into Class E do not necessarily run in the opposite direction, so a change made under a permitted right can be hard to reverse.
What changes now need permission
Four situations arise regularly.
A vacant shop or office taken by a cinema operator for a boutique screen. Permission needed, because the change is from Class E to sui generis.
A bingo hall converted to a gym. Permission needed unless a Part 3 right applies, which turns on the specific wording in force.
A cinema subdividing to add a bar with its own street entrance. This may be a change of use of part, and the bar is likely to be a Class E use or sui generis depending on how it operates, so the application has to describe the mix precisely.
A dance hall reverting to a use it held decades ago. Lawfulness is a matter of planning history and, where the earlier use has been abandoned, a fresh permission is needed. A certificate of lawfulness of existing use is the formal route to establishing the position.
In each case the Planning Statement has to set out the use class analysis first and the policy case second, because an officer who disagrees with your class analysis will not read the rest.
Noise, dispersal and late hours
Venue applications are won and lost on noise and on what happens at closing time.
Sound insulation is the measurable part. Breakout from amplified music is assessed by prediction and by measurement at the nearest noise-sensitive facade, with the mitigation specified as construction: an independent inner leaf, acoustic lobbies at every door to the street, no openable windows on sensitive elevations, limiters on the sound system set to a measured level, and attenuated ventilation to avoid the need to open anything. A Noise Impact Assessment should state the design criterion, the predicted levels and the specification, and should say where the plant is going.
Dispersal is the part that is managed rather than engineered. Queuing arrangements, the location of the smoking area, staff on the street at closing, a taxi marshalling point, phased closing of bars before the main exit, and a commitment to a management plan reviewed with the council and the police. Offer the plan rather than waiting for a condition.
Hours conditions follow. For a late venue, expect separate limits for the venue, for any external area and for deliveries and waste collection, and expect a review mechanism. On smaller indoor leisure uses the analysis turns more on capacity and on the activity itself, which is covered in indoor leisure capacity.
Loss of cultural facility policies
Most urban local plans protect cultural and community facilities, and the protection usually works as a sequence: demonstrate the facility is no longer needed or viable, demonstrate it has been marketed properly, and demonstrate replacement provision where it exists.
Marketing evidence is the part applicants underestimate. Authorities look for a defined period, usually at least 12 months and often longer, at a realistic rent for the condition of the building, with a named agent, published particulars and a record of enquiries and why each fell away. A short marketing exercise at a rent nobody would pay is treated as evidence of nothing.
Viability evidence is the second strand, and for a venue it has to deal with the building as well as the business: plant replacement, roof condition, accessibility works, and the cost of meeting current standards. Where the building is listed, those costs feed into the heritage balance rather than standing alone.
Reuse of a redundant venue
A large proportion of the purpose-built cinemas and dance halls in English town centres date from the 1920s to the 1930s, and many are listed or on a local list. That changes the shape of the application.
The heritage significance of these buildings is often internal: the auditorium volume, the proscenium, the fibrous plaster, the projection box, the terrazzo foyer. A conversion that keeps the facade and guts the volume removes the significance while preserving the planning-friendly part, and inspectors have taken a dim view of that approach. A Heritage Statement should assess the interior volume as a heritage asset in its own right and explain what the scheme does to it.
Subdivision is the recurring tension. Flats or a gym need floors, and floors cut the volume. The schemes that work tend to retain the main volume for a use that can occupy it, with the ancillary accommodation in the flanking spaces, or insert new floors reversibly and keep the proscenium legible.
Where the question is whether a members club or community use falls inside a class at all, the analysis in Class F2 or sui generis applies.
Agent of change and nearby residents
The agent of change approach runs through national noise policy and through the Framework's protection of existing businesses, and it decides many venue cases.
If the venue was there first, a residential scheme next door has to design for it: acoustic glazing, mechanical ventilation, layout that puts bedrooms away from the noise source, and a buyer notification. The venue does not have to quieten down to make someone else's flats work.
If the venue is the newcomer, the burden is yours, and the surrounding residential use is the sensitive receptor you have to protect.
Where both are proposed at once, which happens on mixed-use regeneration sites, the application has to resolve it internally, and the acoustic report needs to deal with structure-borne as well as airborne transmission. That is a specialist exercise and the mitigation becomes a condition, so get the specification right before submission rather than discharging it later.
PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.
Frequently asked questions
What class is a cinema in now?
None. Since 1 September 2020 a cinema has been a sui generis use, listed in the Use Classes Order among the uses to which no class applies, alongside concert halls, bingo halls and dance halls. Any material change of use into a cinema or out of one needs planning permission unless a permitted development right in the General Permitted Development Order covers that specific change.
Did gyms become sui generis as well?
No. Indoor sport, recreation and fitness, other than uses involving motorised vehicles or firearms, moved into Class E(d), which is part of the broad commercial, business and service class. So a gym can take over a vacant shop or office without an application, while a bingo hall in the same parade cannot.
Where do swimming pools and skating rinks sit?
In Class F2, the local community class, together with areas and places for outdoor sport or recreation and halls or meeting places for the principal use of the local community. That split explains why two uses that shared a class before 2020 now sit in different parts of the Order with different permitted changes.
Can a redundant cinema become flats?
It needs planning permission. The residential prior approval route for commercial buildings applies to Class E premises, and a sui generis cinema is not in Class E, so the Class MA route is not available. A full application is required, and in a town centre the loss of a cultural venue will be assessed against the development plan's protective policies.
What is agent of change and who does it bind?
It is the principle that the party introducing a new use bears responsibility for mitigating the conflict it creates. A new residential block beside an existing music venue has to design in the sound insulation; a new venue beside existing flats has to do the acoustic work itself. National policy supports existing businesses continuing where a new development is proposed nearby.
Sources and further reading
- Town and Country Planning (Use Classes) Order 1987 (as amended)
- The Town and Country Planning (Use Classes) (Amendment) (England) Regulations 2020
- Planning Practice Guidance: when is permission required
- Planning Practice Guidance: noise
- Town and Country Planning (General Permitted Development) (England) Order 2015
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.