Use Classes and Change of Use

Hairdressers, nail bars and tattoo studios: which class

7 min readBy PlanScope Editorial Team

Personal services fall within Class E(c), so most moves between them need no application. Tattoo studios are the contested case, and old conditions can override the class.

A hairdresser or a nail bar sits in Class E(c) of the Use Classes Order, as a service appropriate to provide in a commercial, business or service locality. A tattoo studio is the awkward one, because no class names it and authorities take different views. That difference matters commercially: a move within Class E needs no planning application, while a change into or out of a sui generis use always does.

Before signing a lease, check two things. Which class the authority considers the existing lawful use to fall within, and whether any condition on the unit's planning history restricts the use beyond the class system.

Where personal services sit in Class E

The 2020 amendments to the Use Classes Order swept the old A1, A2, A3, B1, D1 and part of D2 into a single Class E, described as commercial, business and service uses. Within it, E(a) covers retail sale of goods, E(b) sale of food and drink for consumption on the premises, E(c) financial, professional and other services, E(d) indoor sport and fitness, E(e) medical and health services, E(f) creches and day centres, and E(g) offices, research and light industrial processes.

Hairdressing, barbering, beauty treatment and nail services fall within E(c)(iii), the limb covering any other services it is appropriate to provide in a commercial, business or service locality. Before September 2020 a hairdresser was within the shops class, because the old A1 definition named hairdressers expressly.

The consequence of the change is substantial flexibility. A hairdresser can become a nail bar, a beauty salon, a cafe, a shop, a clinic or an office without a planning application, because all of those sit within Class E and a change within a class is not development under section 55(2)(f) of the Town and Country Planning Act 1990.

Uses that fall outside the class

Not every treatment-style business is inside E. The uses most often encountered on a high street that sit outside it include:

  • Hot food takeaways, which are sui generis
  • Drinking establishments, which are sui generis
  • Launderettes, which are sui generis
  • Hostels and houses in multiple occupation, which have their own classes or sit outside them
  • Nightclubs, dance halls and live music venues, which are sui generis
  • Residential institutions and dwellings, in classes C2 and C3

Moving into any of these from a hairdresser is a planning application. So is moving out of them into Class E, except where a specific provision in Part 3 of Schedule 2 to the General Permitted Development Order grants a right, which it does for some sui generis uses and not for others.

Why a tattoo studio is treated differently

Here the honest answer is that the position is arguable. The Order names no class for tattooing and skin piercing, and practice varies between authorities.

Some treat a tattoo studio as sui generis, on the basis that it was never within the old shops class and the 2020 amendments did not add it anywhere. Others accept that it falls within E(c)(iii), because it is a service of a kind provided in a commercial locality. The same split appears in appeal decisions, which are indicative of how inspectors have approached the issue rather than binding precedent.

What that means in practice is simple. Do not assume either answer. Ask the authority at pre-application stage, and where the commercial exposure is significant, apply for a certificate of lawfulness for the proposed use under section 192 of the 1990 Act. That is the only way to fix the position, and it costs far less than a retrospective application after an enforcement enquiry.

Separate from planning, tattooing, skin piercing, acupuncture and electrolysis premises need registration with the local authority under Part VIII of the Local Government (Miscellaneous Provisions) Act 1982. In London, a special treatment licence regime applies instead. Neither is a planning consent, and neither authorises a change of use.

Extraction and waste for treatment uses

Nail bars generate solvent vapour, and the environmental health response is about ventilation rather than use class. Expect questions on mechanical extract, air change rates, filtration and the position of any external termination, particularly where there are flats above.

Where a new extract system or external duct is proposed, that is development in its own right. A short Ventilation and Extraction Statement covering the system, the duct route and the termination point answers the officer's question before it is asked.

Tattoo and piercing studios produce clinical and sharps waste, which falls under the duty of care in the Environmental Protection Act 1990 and the hazardous waste regime. The planning dimension is storage: where the sharps bins and clinical waste containers sit, and how they are collected without crossing residential amenity. A short waste note in the application is usually enough at this scale.

Hours, frontage and shopfront policies

Use class is only half the planning question. The other half is whether the local plan protects the frontage.

Many authorities designate primary shopping frontages where ground floor retail is protected, and some have made Article 4 directions removing the permitted change rights that Class E otherwise provides. An Article 4 direction can reinstate the need for an application for a change the Order would permit, so check the authority's Article 4 list before relying on class flexibility.

Three other policy points come up regularly:

  1. Hours conditions, where the premises adjoin housing or sit above flats
  2. Shopfront design policy and the loss of traditional frontage detail, especially in conservation areas
  3. Signage, which needs advertisement consent separately where it is illuminated or exceeds the deemed consent limits

A conservation area adds listed building and shopfront considerations that a use class analysis will not catch. The use class position for sports and social clubs shows how a similar-looking use can sit in a completely different part of the Order, and the question for film and television studios is another where no class names the activity.

Checking a condition on the existing unit

This is the step most tenants skip, and it causes more trouble than the class analysis.

A condition on an earlier permission can restrict the unit's use more tightly than the Order does. A condition reading "the premises shall be used as a retail shop within Class A1 and for no other purpose" removes the flexibility that Class E would otherwise give, because the condition operates independently of the class system.

The 2020 Regulations included transitional provisions so that a reference to a former use class in an existing condition continues to be read as that former class. A condition referring to A1 therefore still means A1 as it stood on 31 August 2020, which is narrower than Class E. Removing such a condition needs an application under section 73, with its own policy assessment.

Get the planning history for the unit from the authority's public register before you commit. Look for conditions restricting use, restricting hours, requiring extraction, or limiting the floor area in any particular use.

What to submit for a borderline use

For a use the authority may treat as sui generis, a workable approach is:

  1. A pre-application enquiry setting out the proposed activity in operational detail, including treatments offered, staff numbers, hours and waste streams
  2. A section 192 certificate application where certainty is needed before a lease commits you
  3. Where an application is needed, a Planning Statement analysing the class position, the frontage policy and the amenity effects
  4. An extraction statement where any mechanical ventilation is proposed
  5. Drawings showing the layout, any external plant, the waste storage and the shopfront

Describe the activity, not the trade name. An officer assessing "nail and beauty treatments with two treatment rooms and no mechanical extract" can reach a view. An officer assessing "beauty studio" cannot.

Browse all 66 report types and start a draft at PlanScope, then have the use class analysis checked by a planning consultant before you submit.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. A Lawful Development Certificate is the only formal way to confirm that a use is lawful. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What use class is a hairdresser?

Class E(c)(iii), as a service it is appropriate to provide in a commercial, business or service locality. Before September 2020 hairdressers were named expressly in the old shops class A1. The change means a hairdresser can become a nail bar, beauty salon, cafe, shop, clinic or office without a planning application.

Is a tattoo studio sui generis?

The position is arguable. The Order names no class for tattooing, so some authorities treat it as sui generis while others accept it falls within Class E(c)(iii) as a commercial service. Appeal decisions split as well. Ask at pre-application stage, and use a section 192 certificate where commercial certainty is needed.

Can a nail bar become a hot food takeaway without permission?

No. Hot food takeaways are sui generis, outside the class system, so moving from Class E into that use is a planning application. Expect the authority to look at extraction, odour, noise, hours and any local policy restricting hot food uses near schools, which several authorities now operate.

Does an old condition override the new Class E flexibility?

Yes. A condition limiting the premises to a named former class operates independently of the Order, and the 2020 transitional provisions mean a reference to A1 is still read as A1 as it stood on 31 August 2020. Removing that restriction requires a section 73 application with its own assessment.

Do I need a licence as well as planning permission for tattooing?

Yes. Premises offering tattooing, skin piercing, acupuncture or electrolysis need registration with the local authority under Part VIII of the Local Government (Miscellaneous Provisions) Act 1982, and in London a special treatment licence regime applies. Neither is a planning consent and neither authorises a change of use.

What should a pre-application enquiry say?

Describe the operation rather than the trade name: the treatments offered, the number of treatment positions, staff numbers, opening hours, waste streams and whether mechanical extract is proposed. An officer can form a view on that level of detail, and cannot form one on a description such as 'beauty studio'.

Sources and further reading

use classesclass etattoo studionail barchange of use

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use7 min read

Hostel, hotel or HMO: three different use classes

Hotels sit in Class C1, which expressly excludes hostels. Shared houses sit in C4 up to six residents and become sui generis above that. The facts of occupation decide which you have.

Read article →
Use Classes and Change of Use7 min read

Cinemas, bingo halls and dance halls after the 2020 reform

The 2020 rewrite of the Use Classes Order split the old assembly and leisure class apart. Cinemas and bingo halls came out as sui generis, so every change needs permission.

Read article →
Use Classes and Change of Use7 min read

Betting shops and payday lenders: no class, no shortcut

Since 2015 a betting office or payday loan shop has sat outside every use class. No permitted change applies, the gambling licence is a separate process, and frontage policies do the heavy lifting.

Read article →
Use Classes and Change of Use7 min read

Storage and distribution: Class B8 and its movements

Moving a warehouse into any Class E use is a full application. What Class B8 covers, which prior approval routes exist, and the conditions that bind the site.

Read article →
Use Classes and Change of Use7 min read

Pub to restaurant or shop: what consent a change needs

There is no permitted development route out of a pub. What the 2020 Use Classes amendments changed, and the marketing and viability evidence councils require.

Read article →
Use Classes and Change of Use7 min read

House to small HMO: the C3 to C4 change explained

The C3 to C4 change is permitted development until an Article 4 direction or a seventh occupant removes it. Here is what each situation requires.

Read article →