Hostel, hotel or HMO: three different use classes

7 min readBy PlanScope Editorial Team

Hotels sit in Class C1, which expressly excludes hostels. Shared houses sit in C4 up to six residents and become sui generis above that. The facts of occupation decide which you have.

Three forms of shared accommodation, three different positions in the Use Classes Order, and one set of facts that decides which applies. A hotel or guest house sits in Class C1. A hostel sits outside every class, because C1 expressly excludes hostels. A shared house occupied by three to six unrelated people sits in Class C4, and above six residents it leaves C4 and becomes sui generis. Getting the hostel or HMO use class question right determines whether you need permission at all.

Marketing language does not decide it. The pattern of occupation does.

The C1 hotel class and what it requires

Class C1 covers hotels, boarding houses and guest houses where no significant element of care is provided. Two limbs of that definition matter.

The care limb comes first. Once personal care is provided, the use moves towards Class C2, residential institutions, which covers residential care homes, hospitals, nursing homes and residential schools. The threshold is about the provision of personal care rather than the provision of services, so housekeeping and meals do not take a hotel into C2.

And hostels are excluded. The exclusion is explicit in the Order, which is why the hostel question cannot be answered by arguing that a hostel is a kind of boarding house.

What characterises a C1 use in practice: short average stays, a booking system rather than a tenancy, reception and housekeeping, the operator retaining control of the rooms and the right to move guests, no security of tenure, and rates rather than council tax on the rooms.

Hostels and why they sit outside C1

Because the Order excludes them and does not list them anywhere else, hostels are sui generis. That has two consequences.

Any change of use into a hostel needs planning permission, from any starting point. And any change out of a hostel needs permission too, unless a permitted development right in Schedule 2 Part 3 happens to cover the specific change, which is worth checking rather than assuming.

The practical difficulty is identifying a hostel. The word covers backpacker accommodation, supported housing with a resident manager, direct-access accommodation for people who are homeless, and worker accommodation, all of which operate differently. What they tend to share is longer stays than a hotel, shared living or sleeping space beyond shared bathrooms, and a management model built around residents rather than guests.

Where supported housing involves personal care, the analysis shifts again towards C2, and some supported schemes have been found to fall within C3 where small groups live together as a single household. The classification follows the facts of the arrangement.

Where C4 and sui generis HMOs fit

Class C4 was added in 2010 and covers a dwellinghouse occupied by between three and six unrelated residents as their only or main residence, sharing one or more basic amenities.

Occupation Use class Route for a change from a C3 house
Single person or family C3(a) No change
Up to six residents living together as a household with care C3(b) None needed if truly a household
Three to six unrelated sharers C4 Permitted development unless Article 4 applies
Seven or more unrelated sharers Sui generis Full planning application
Short-stay guests with services C1 Full planning application
Hostel Sui generis Full planning application

The permitted change between C3 and C4 runs in both directions, which means a C4 house can revert to a family dwelling without an application. Article 4 directions are widespread in university towns and in parts of larger cities, and where one is in force the C3 to C4 change needs a full application, with the council applying a local policy that often includes a concentration threshold measured within a radius of the property.

Large HMOs, meaning seven residents or more, always need permission. Converting a six-bed HMO to a seven-bed HMO is therefore a material change of use, and it is the most commonly overlooked application in this field.

Degree of care and length of stay

Two variables do most of the classification work.

Length of stay separates C1 from residential uses. Nightly and weekly bookings point to C1. Assured shorthold tenancies and occupation as a main residence point to C3 or C4. The awkward middle ground is the serviced apartment let for a month at a time, and the answer there depends on the whole package rather than on the duration alone. The related analysis for purpose-built shared living schemes is set out in where co-living sits.

Degree of care separates residential uses from C2. Personal care means assistance with washing, dressing, eating and medication, not meals and cleaning. A scheme with visiting support workers and no personal care is unlikely to be C2.

Management, reception and services as indicators

Councils look at a familiar list of indicators when the label and the reality diverge.

Whether there is a staffed reception and for what hours. Whether rooms are cleaned and linen changed by the operator. Whether occupiers hold a tenancy with exclusive possession or a licence to occupy. Whether the operator can require an occupier to move rooms. The average and the modal length of stay. Whether occupiers register the address as their main residence, for electoral roll, council tax or benefit purposes. How the property is rated. The number and type of bookings over a representative period. Whether meals are provided and taken communally.

No single indicator decides it. A reception desk in a building let on annual tenancies does not make it a hotel.

Evidence of the actual pattern of occupation

Where lawfulness is in dispute, documents beat description.

For an existing use you want: tenancy agreements or booking records covering a continuous period, the occupancy schedule by room and by date, council tax or rating records, utility accounts, the management agreement, staff rotas, and any licence held. For a proposed use you want the operating model written down: the letting basis, the expected stay length, the services, the staffing and the house rules.

A Planning Statement should present that material as evidence rather than as assertion, and should name the class being claimed and the indicators relied on. Where the claim is that an unauthorised use has become lawful through the passage of time, the route is a certificate of lawfulness of existing use, with evidence covering the full statutory period.

Two operational matters come up in almost every shared-accommodation application, and they are worth addressing before the officer raises them. Refuse, because shared houses generate more waste and more bins than the street was designed for, and a bin store that works is often what turns an objection into a condition: set it out in a Waste Management Strategy. And parking, where the relevant evidence on a controlled street is a parking survey of overnight stress rather than a standards calculation.

Which application route each change needs

Work through it in order.

Establish the existing lawful use from the planning history and the evidence, not from what the building looks like. Identify the class of the proposed use using the indicators above. Check Schedule 2 Part 3 of the General Permitted Development Order for a right covering that specific change, and check the conditions and limitations attached to it. Check for an Article 4 direction and for conditions on earlier permissions removing the rights. Then choose between no application, prior approval and a full application.

For buildings coming out of commercial use, the residential prior approval route applies to Class E premises and brings its own conditions and matters for consideration, as set out in the Class MA prior approval route. It does not help with a sui generis hostel or a C1 hotel, both of which need a full application to become housing.

And whichever route applies, the licensing position runs in parallel. Mandatory licensing applies to larger HMOs under the Housing Act 2004, with additional and selective licensing schemes in some areas, and compliance with licensing standards on room sizes and amenities often drives the layout the planning application has to show.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What is the difference between a hostel and a guest house?

Length of stay and the nature of the service. A guest house in Class C1 provides short-stay accommodation to transient guests with reception and housekeeping, and the operator keeps control of the rooms. A hostel typically provides longer-stay or supported accommodation, often with shared sleeping or living space and a different management model, and the Use Classes Order excludes hostels from C1 for that reason.

How many people make a house an HMO in planning terms?

Class C4 applies where between three and six unrelated people occupy a dwelling as their only or main residence and share one or more basic amenities such as a kitchen or bathroom. At seven or more residents the use falls outside C4 and is treated as sui generis, so it needs a planning application regardless of permitted development rights.

Can I convert a house to a shared house without permission?

Often yes. The General Permitted Development Order permits a change from a C3 dwellinghouse to a C4 small shared house, and back again. Many authorities have made Article 4 directions removing that right in defined areas, so check the council's Article 4 map before relying on it, and remember the right does not cover a house in multiple occupation of seven or more residents.

Does an HMO licence prove the planning use is lawful?

No. Licensing under the Housing Act 2004 regulates management standards, amenity provision and fire safety, and a licence can be granted for a property whose planning use is unauthorised. The two regimes ask different questions. Where the planning position is unclear, a certificate of lawfulness of existing use is the formal route to resolving it.

Where do serviced apartments sit?

It depends on the facts. Short-stay serviced accommodation with reception, housekeeping and no security of tenure often reads as a C1 use, while the same building let on tenancies with no services reads as C3. Councils look at the booking pattern, the average length of stay, the services provided and whether occupiers have exclusive possession, rather than at the marketing description.

Sources and further reading

use classeshmohotelhostelchange of uselandlord

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use7 min read

Drive-through restaurants: which use class applies

A drive-through food outlet is normally a sui generis use rather than a Class E restaurant, which removes the flexibility to change use later. The classification, and the evidence, both follow from how the food is consumed.

Read article →
Use Classes and Change of Use7 min read

Nightclubs and late night venues: consent and conditions

Nightclubs sit outside every use class. The application is won on sound insulation, on what happens at closing time, and on hours you offer rather than hours imposed.

Read article →
Use Classes and Change of Use7 min read

Cinemas, bingo halls and dance halls after the 2020 reform

The 2020 rewrite of the Use Classes Order split the old assembly and leisure class apart. Cinemas and bingo halls came out as sui generis, so every change needs permission.

Read article →
Use Classes and Change of Use7 min read

Betting shops and payday lenders: no class, no shortcut

Since 2015 a betting office or payday loan shop has sat outside every use class. No permitted change applies, the gambling licence is a separate process, and frontage policies do the heavy lifting.

Read article →
Use Classes and Change of Use7 min read

Storage and distribution: Class B8 and its movements

Moving a warehouse into any Class E use is a full application. What Class B8 covers, which prior approval routes exist, and the conditions that bind the site.

Read article →
Use Classes and Change of Use7 min read

Hairdressers, nail bars and tattoo studios: which class

Personal services fall within Class E(c), so most moves between them need no application. Tattoo studios are the contested case, and old conditions can override the class.

Read article →