Use Classes and Change of Use

Pub to restaurant or shop: what consent a change needs

7 min readBy PlanScope Editorial Team

There is no permitted development route out of a pub. What the 2020 Use Classes amendments changed, and the marketing and viability evidence councils require.

Converting a pub to a restaurant or a shop needs a full planning application. There is no permitted development route, because drinking establishments were made sui generis by the 2020 amendments to the Use Classes Order and because a separate change in 2017 stripped out the permitted development rights that pubs once had. On top of that, most councils carry a local plan policy protecting community facilities, and many pubs are listed as assets of community value, which adds an evidence burden and sometimes a delay of several months before the building can even be sold.

So the planning question is rarely whether you need permission. It is what evidence you need to get it.

Why drinking establishments are sui generis

Before September 2020, pubs and wine bars sat in Class A4. The Town and Country Planning (Use Classes) (Amendment) (England) Regulations 2020 deleted the old A classes and created the broad Class E, and at the same time moved several uses out of the class system altogether. Drinking establishments went with them, alongside hot food takeaways, cinemas, concert halls, bingo halls and live music venues.

Sui generis means the use is in a class of its own. Nothing changes into it without permission, and it changes into nothing without permission, unless a specific provision in the General Permitted Development Order says otherwise.

That has a second consequence people miss. Because a pub is not in Class E, the Class MA prior approval route from commercial use to dwellinghouses is unavailable to it. A pub to flats conversion is a full application, whatever the vacancy position. The Class MA vacancy requirement only ever helped Class E premises.

Changes that need full permission

Every one of these is a planning application:

  • Pub to restaurant or cafe, which falls within Class E(b)
  • Pub to shop, which falls within Class E(a)
  • Pub to office, financial or professional services, medical use or gym, all within Class E
  • Pub to hot food takeaway, which is sui generis in its own right
  • Pub to flats or houses
  • Demolition of the pub, following the 2017 removal of permitted demolition rights for drinking establishments

The 2017 amendment is the one that catches owners who last looked at this a decade ago. Pubs used to be able to change to a shop, a financial services use or a restaurant without permission. That route closed in May 2017 and has not reopened.

The permitted change that does exist

One route survives in Part 3 of Schedule 2 to the General Permitted Development Order. Class AA allows a drinking establishment to change to a mixed use as a drinking establishment with expanded food provision.

In plain terms, a pub can start serving substantially more food and become a pub with a serious kitchen, without applying. What it cannot do under that class is become a restaurant, because the drinking establishment element has to remain. Lose the bar trade entirely and you have made an unauthorised change of use, with the enforcement exposure that follows.

Read the current text of Part 3 before relying on this, because Part 3 has been amended repeatedly and the conditions attached to each class matter as much as the class itself. Physical works to the building are a separate question, and external alterations may need their own permission.

Assets of community value and the moratorium

Listing under Part 5 Chapter 3 of the Localism Act 2011 does not stop a sale or a change of use. It creates a process.

Once an owner of listed land gives notice of an intention to make a relevant disposal, an interim moratorium of six weeks runs during which a community interest group can express an interest in bidding. If one does, a full moratorium of six months applies, during which the owner cannot dispose of the asset other than to that group. After it expires the owner can sell to anyone, at any price.

Listing is also a material consideration in the planning decision itself, and a local group that has been through the bid process will usually produce a well-organised objection. Factor both the six-month timetable and the consultation response into your programme.

Loss of community facility policies

This is where applications are won or lost. Most adopted local plans protect public houses, often as part of a wider community facilities policy, and set out what an applicant must demonstrate before a loss is accepted.

The usual requirements are:

  1. The premises have been marketed for a stated period, commonly 12 months, as a going concern at a price reflecting its value as a pub
  2. The marketing was genuine, with evidence of the agent instructed, the asking price, the particulars, enquiries received and why each fell away
  3. Trading accounts show the business is not viable, usually over three years
  4. There is no realistic prospect of another operator taking it on, including as a community-run pub
  5. Other similar facilities remain accessible to the community served

Pricing is the pressure point. A pub marketed at a price that reflects its residential development value will attract no pub buyers, and officers know that. Marketing evidence of that kind is routinely rejected, and the appeal decisions on it are not encouraging for applicants.

A Planning Statement that sets out the marketing history in a table, with dates and outcomes, does more for an application than any amount of policy narrative. Where the pub also operates as a club or has a social club element, the use class position for sports and social clubs is worth checking, because the policy protection may sit under a different heading.

The documents a change of use needs

Scale the pack to the change. A pub to shop conversion of an existing ground floor is modest. A pub to restaurant with a new extract system and later hours is not.

For a restaurant or cafe use, expect to need:

  • A Ventilation and Extraction Statement covering the cooking type, filtration, duct route and termination point
  • A noise assessment of any new plant, measured against background sound at the hours the plant will run
  • A Transport Statement or parking note where the trip pattern or servicing changes
  • A Heritage Statement where the building is listed or in a conservation area, which many older pubs are
  • A refuse and deliveries management plan

Listed building consent is separate from planning permission and is needed for internal alterations that affect special interest. Pub interiors with historic fittings, snugs and bar backs are frequently the reason a listed pub is listed at all, so an open-plan restaurant layout can be the hardest part of the scheme to consent.

The licensing position alongside planning

A premises licence under the Licensing Act 2003 is a separate consent from a separate committee, assessed against the licensing objectives rather than planning policy. A planning permission does not grant a licence, and a licence does not authorise a change of use.

Run them in parallel and keep the two applications consistent. Hours applied for in licensing that exceed hours conditioned in planning is a common and avoidable contradiction, and it is the first thing an objector will point out.

Illustrative example: a two-storey corner pub in a conservation area, trading three days a week, proposed as a cafe at ground floor with two flats above. The realistic pack is a Planning Statement with 12 months of marketing evidence, a Heritage Statement, an extraction statement for the cafe kitchen, a noise note for the plant, and amenity standards evidence for the flats. This example is illustrative only.

Browse all 66 PlanScope report types and start a draft at PlanScope, then send the output to a planning consultant before you submit.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. A Lawful Development Certificate is the only formal way to confirm that an existing or proposed use is lawful. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Can a pub change to a restaurant without planning permission?

No. Drinking establishments became sui generis under the 2020 amendments to the Use Classes Order, and the permitted development rights pubs previously held were removed in May 2017. A change to a restaurant, which falls within Class E(b), needs a full planning application assessed against local community facility policies.

What is the only permitted change from a pub?

Class AA in Part 3 of Schedule 2 to the General Permitted Development Order allows a drinking establishment to become a mixed use as a drinking establishment with expanded food provision. The bar trade has to continue. Dropping it entirely produces an unauthorised change of use, so check the current text and conditions first.

Does an asset of community value listing stop the sale?

No, it creates a process. Once the owner notifies an intention to dispose, a six-week interim moratorium runs, and if a community group expresses interest a full six-month moratorium follows during which the owner can only dispose to that group. After it ends the owner may sell to anyone at any price.

How long do I need to market a pub before applying?

Most adopted local plans ask for a stated period, commonly 12 months, at a price reflecting the premises' value as a pub rather than its development value. Record the agent, asking price, particulars, enquiries and why each enquiry fell away. Marketing at a residential development price is routinely rejected as evidence.

Can I use Class MA to turn a pub into flats?

No. Class MA applies to premises in Class E, and a drinking establishment sits outside the class system. A pub to residential conversion is a full planning application whatever the vacancy position, and it has to deal with the community facility policy as well as the amenity standards for the new homes.

Do I need listed building consent as well?

If the pub is listed, yes, for works affecting its special interest. Historic bar backs, snugs and screens are often the reason the building is listed, so an open-plan restaurant layout can be the hardest element to consent. Listed building consent runs alongside planning permission rather than replacing it.

Sources and further reading

use classespub conversionchange of usesui generisassets of community value

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use7 min read

Hostel, hotel or HMO: three different use classes

Hotels sit in Class C1, which expressly excludes hostels. Shared houses sit in C4 up to six residents and become sui generis above that. The facts of occupation decide which you have.

Read article →
Use Classes and Change of Use7 min read

Cinemas, bingo halls and dance halls after the 2020 reform

The 2020 rewrite of the Use Classes Order split the old assembly and leisure class apart. Cinemas and bingo halls came out as sui generis, so every change needs permission.

Read article →
Use Classes and Change of Use7 min read

Betting shops and payday lenders: no class, no shortcut

Since 2015 a betting office or payday loan shop has sat outside every use class. No permitted change applies, the gambling licence is a separate process, and frontage policies do the heavy lifting.

Read article →
Use Classes and Change of Use7 min read

Storage and distribution: Class B8 and its movements

Moving a warehouse into any Class E use is a full application. What Class B8 covers, which prior approval routes exist, and the conditions that bind the site.

Read article →
Use Classes and Change of Use7 min read

Hairdressers, nail bars and tattoo studios: which class

Personal services fall within Class E(c), so most moves between them need no application. Tattoo studios are the contested case, and old conditions can override the class.

Read article →
Use Classes and Change of Use7 min read

House to small HMO: the C3 to C4 change explained

The C3 to C4 change is permitted development until an Article 4 direction or a seventh occupant removes it. Here is what each situation requires.

Read article →