Use Classes and Change of Use

Changing a condition that ties a unit to a revoked class

7 min readBy PlanScope Editorial Team

A condition restricting a unit to a revoked class still bites. Section 73 is the route to vary it, and the application has to answer the reason the condition was imposed for.

A condition on a 2008 permission saying the premises shall be used only as a shop within Class A1 and for no other purpose still restricts the unit, even though Class A1 no longer exists. That is the position most landlords discover when a prospective tenant wants to open a café. The condition revoked use class problem is solved by an application under section 73 of the Town and Country Planning Act 1990 to vary or remove the condition, and the application has to be argued on the policy reason the condition was imposed for.

Doing nothing is the worst option. Letting the unit to a use the condition prohibits is a breach of condition, enforceable by a breach of condition notice against which there is no appeal.

How these conditions arise

Conditions restricting a unit to a single use class were standard practice for decades, and they were imposed for sensible reasons at the time.

A retail frontage policy produced conditions tying ground floor units to A1 to protect shopping character. A highways objection produced conditions excluding A3 or A5 because of parking turnover or servicing. An amenity concern about a flat above produced conditions excluding food and drink uses because of odour and late hours. An employment land policy produced conditions tying a unit to B1 to prevent its loss to retail.

The reason is usually recorded on the decision notice under the condition, and it is the single most useful piece of information you have. Where no reason is given, the officer report for the original application often explains it, and most authorities will supply a copy from the planning file.

Whether the condition still bites

Yes, in almost every case, and for a specific reason. The transitional provisions in the 2020 amendments to the Use Classes Order mean that a class reference in a permission granted before 1 September 2020 is read as that class had effect at the date of the permission.

So the condition continues to restrict the premises to what A1 meant then. The fact that a shop and a café now both sit within Class E does not help, because the condition operates independently of the Order's current structure.

Two situations where the analysis differs. If there is no condition and the permission merely described the development as retail, then the lawful use falls within Class E today and movement within that class is not development at all under section 55(2)(f). And if the proposed use is outside Class E altogether, which covers a hot food takeaway, a pub, a cinema or a nightclub, then varying the condition achieves nothing on its own because a separate change of use permission is needed. The same analysis applies to the indoor leisure uses that sit awkwardly across the classes.

Reading the condition against the current Order

Before applying, work out precisely what you need.

Write down the current lawful use, the condition wording in full, the reason given, and the use the tenant proposes. Then identify which limb of Class E the proposed use falls into, or establish that it is sui generis. Check the planning register for any later permission or variation that superseded the condition, and check whether an Article 4 direction affects the site.

Sometimes the answer is that the condition does not prohibit the proposed use at all. A condition excluding A5 does not prevent a café. A condition requiring use as a shop within A1 does not prevent a change to an office if a later permission authorised that. Read the documents rather than the summary on the council's website, because online registers are abbreviated and occasionally wrong.

The section 73 application and its evidence

Section 73 allows permission to be granted for development without complying with a condition previously imposed. The authority considers only the condition in question, not the whole permission, and it can grant the variation, grant it in a different form or refuse it.

Two limits to know. Section 73 cannot be used to alter the description of the development, which the Court of Appeal confirmed in Finney v Welsh Ministers (2019), so if the description itself says use as a retail shop then a variation of the condition will not deliver what you want and a fresh application is needed. And section 73 cannot extend the time limit for implementation.

The evidence has to answer the original reason:

  • Where the reason was frontage protection, give the current vacancy and occupancy pattern on the parade, the marketing history of the unit and the policy position in the adopted plan.
  • Where it was parking or servicing, give a trip generation and parking comparison between the permitted use and the proposed one, with the servicing arrangement.
  • Where it was amenity, give a noise and odour position, with an extraction scheme and a plant specification if a food use is proposed. A short noise impact assessment with measured background levels is far more persuasive than an assurance.
  • Where it was employment land protection, give the floorspace figures and the local plan designation.

A planning statement that sets out the condition, its reason, what has changed since and the proposed replacement wording does most of the work. Propose the wording yourself. An authority that is nervous about full Class E freedom may accept a condition limited to specified limbs of Class E, which is a better outcome than refusal.

Fees, periods and the new permission

A section 73 application carries a flat fee set by the fee regulations and indexed annually, so take the current figure from the published schedule rather than from an older note. The determination period is eight weeks for minor development.

What you receive is a new permission, standing alongside the original rather than replacing it. Check the conditions on it line by line. All the other conditions from the original permission should be restated, and where one is omitted the Supreme Court in the Lambeth case (2019) held that the permission may still be construed as subject to it, so an omission is not a windfall. New conditions can also be added, and an authority granting Class E freedom sometimes attaches a condition on hours, deliveries or extraction that the original permission never had.

Decide which permission to implement, and record the decision. Operating under the new permission means complying with all its conditions.

Appeal if the variation is refused

An appeal against refusal of a section 73 application runs under section 78, with six months from the decision notice for most cases and the written representations procedure for a simple condition dispute.

The appeal is usually about whether the reason for the condition still holds. That makes it an evidence case rather than a legal one: the vacancy data, the marketing record, the measured noise levels, the parking survey. Where the authority has simply reasserted a 2008 policy that the current local plan no longer contains, say so and quote both.

You can also appeal against a condition imposed on the new permission, which is the route where the authority grants the variation but attaches something unworkable.

What to do before completing a letting

Four steps, in order, before heads of terms become an agreement for lease.

  1. Obtain the full planning history for the unit, including every decision notice and the conditions on each.
  2. Confirm that the tenant's proposed use falls within Class E, and identify the limb. A use outside Class E needs its own permission regardless of the condition.
  3. Where a condition prohibits the use, decide between a section 73 variation and a full change of use application, and build the timescale into the agreement for lease as a condition precedent.
  4. Where the position is arguable, apply for a Lawful Development Certificate under section 192, which is the only route that produces a binding answer.

Landlords who skip the second step are the ones who end up with a tenant in occupation and an enforcement notice on the file. The equivalent trap on the residential side, where the premises must actually be in Class E for the prior approval route to work, is set out in our note on Class MA and the vacancy requirement.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. Browse the 66 report types to see which documents a variation application needs.

Frequently asked questions

Can I ignore a condition citing Class A1?

No. The transitional provisions in the 2020 amendments mean a class reference in a pre September 2020 permission is read as that class stood at the date of the permission. Breaching the condition exposes you to a breach of condition notice, against which there is no right of appeal.

Will a section 73 variation let me open a takeaway?

Not on its own. A hot food takeaway, a pub, a cinema and a nightclub all sit outside Class E as sui generis uses, so a separate change of use permission is needed whatever happens to the condition. Varying the condition only helps where the proposed use is within Class E.

What evidence does a section 73 application need?

Evidence that answers the reason the condition was imposed. Frontage protection needs vacancy, occupancy and marketing data. A parking reason needs a trip and parking comparison. An amenity reason needs noise and odour evidence with an extraction specification. Employment protection needs floorspace and designation figures.

Can section 73 change the description of development?

No. The Court of Appeal confirmed in Finney v Welsh Ministers in 2019 that section 73 cannot be used to alter the description of the development, and it cannot extend the time limit for implementation either. Where the description itself restricts the use, a fresh application is the route.

What happens to the other conditions?

A section 73 grant is a new permission standing alongside the original, and the other conditions should be restated on it. Where one is omitted, the Supreme Court held in the Lambeth case in 2019 that the permission may still be construed as subject to it, so check the new notice line by line.

Sources and further reading

section 73conditionsuse classesclass elettingchange of use

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use7 min read

Translating old use class references in a permission

Conditions citing revoked A, B1, D1 and D2 classes remain enforceable on their original meaning. The mapping table, the saving provision and the section 73 route.

Read article →
Use Classes and Change of Use7 min read

Community centres and village halls in Class F2

Village halls usually sit in Class F2 as halls for the principal use of the local community. Changes within the class are not development, while moving out of it engages community facility policy.

Read article →
Use Classes and Change of Use7 min read

Drive-through restaurants: which use class applies

A drive-through food outlet is normally a sui generis use rather than a Class E restaurant, which removes the flexibility to change use later. The classification, and the evidence, both follow from how the food is consumed.

Read article →
Use Classes and Change of Use7 min read

Nightclubs and late night venues: consent and conditions

Nightclubs sit outside every use class. The application is won on sound insulation, on what happens at closing time, and on hours you offer rather than hours imposed.

Read article →
Use Classes and Change of Use7 min read

Hostel, hotel or HMO: three different use classes

Hotels sit in Class C1, which expressly excludes hostels. Shared houses sit in C4 up to six residents and become sui generis above that. The facts of occupation decide which you have.

Read article →
Use Classes and Change of Use7 min read

Cinemas, bingo halls and dance halls after the 2020 reform

The 2020 rewrite of the Use Classes Order split the old assembly and leisure class apart. Cinemas and bingo halls came out as sui generis, so every change needs permission.

Read article →