Use Classes and Change of Use

Translating old use class references in a permission

7 min readBy PlanScope Editorial Team

Conditions citing revoked A, B1, D1 and D2 classes remain enforceable on their original meaning. The mapping table, the saving provision and the section 73 route.

A condition on a 2014 permission restricting a unit to Class A1 still means A1 as that class stood when the permission was granted. That single point resolves most questions about old use class references, and it is the opposite of what many occupiers assume. They read that shops and cafés both sit in Class E now, conclude that one can become the other freely, and breach a condition that remains fully enforceable.

The transitional provisions in the 2020 amendments to the Use Classes Order are what produce that result, and reading them properly saves a client from an enforcement notice.

Why old class references persist

Planning permissions do not expire as documents. A permission granted in 1998 that is still being relied on carries its original description and its original conditions, written in the vocabulary of the Use Classes Order as it then stood.

So the planning history of any commercial site is a layered record: a 1992 permission for A1 retail, a 2004 variation about servicing hours, a 2011 permission for a B1 office at first floor, a 2016 condition tying the ground floor to A3 and excluding A5. None of those documents were rewritten in September 2020, and nobody is going to rewrite them.

Article 4 directions are in the same position. Many were made before 2020 and refer to classes that no longer exist, and their current effect depends on which permitted development rights they removed rather than on the class names in the heading.

How the 2020 amendments mapped the former classes

The Town and Country Planning (Use Classes) (Amendment) (England) Regulations 2020 came into force on 1 September 2020 and revoked the old A classes, B1, D1 and D2.

Former class Where the use sits now
A1 shops Class E(a), with small essential goods shops meeting the 1,000 metre test in F2(a)
A2 financial and professional services Class E(c)
A3 restaurants and cafés Class E(b)
A4 drinking establishments Sui generis
A5 hot food takeaways Sui generis
B1(a) offices Class E(g)(i)
B1(b) research and development Class E(g)(ii)
B1(c) light industrial Class E(g)(iii)
D1 clinics, health centres, creches, day nurseries Class E(e) and E(f)
D1 schools, galleries, museums, libraries, places of worship Class F1
D2 gyms and indoor recreation Class E(d)
D2 cinemas, concert halls, bingo and dance halls Sui generis
D2 outdoor sport, swimming pools, skating rinks Class F2(c) and F2(d)

B2 general industrial and B8 storage and distribution were left alone. Note that the mapping is not always one to one: a single former D1 or D2 use can land in Class E, Class F1, Class F2 or sui generis depending on exactly what it is, which is why the use class question for film and television studios and for sports and social clubs still generates argument.

Conditions citing a revoked class

A condition is a restriction on the use of the land, and it binds regardless of the Order's later amendment. If the condition says the premises shall be used only as a shop within Class A1 of the Use Classes Order 1987 and for no other purpose, then a change to a café breaches it, even though both uses now sit within Class E.

That is the practical effect of the saving in the 2020 Regulations: a reference to a use class in a permission granted before 1 September 2020 is read as a reference to that class as it had effect when the permission was granted. Read the saving in the instrument itself rather than relying on a summary, because the wording governs borderline cases.

The reverse trap exists too. A condition that removes permitted development rights by reference to a class, or that excludes A5 use, may now be read against a sui generis use that no longer sits in any class, and the question becomes one of construction rather than classification.

The transitional provisions and the material date

Two dates matter, and they do different jobs.

The date the permission was granted fixes the meaning of any class reference in it. The date the use actually changed fixes which version of the law applied to that change, which matters for enforcement and for lawful development certificate applications about historic changes.

There was also a transitional period after 1 September 2020 during which certain permitted development rights continued to operate by reference to the former classes, so a change made in that window may have been lawful on a basis that no longer exists. For a use that started between September 2020 and the summer of 2021, check the position as it stood on the actual date of change.

Interpreting a condition that no longer matches

Where the words of a condition no longer map onto the current Order, interpretation follows the ordinary approach to construing a planning permission. The Supreme Court in Trump International Golf Club Scotland v Scottish Ministers (2015) confirmed that a permission is construed objectively, in its full context, by reference to what a reasonable reader would understand the words to mean.

Practically, that means reading the condition with the reasons given for it, the officer report where available, and the application documents the permission was granted on. A condition imposed to protect retail frontage vitality reads differently from one imposed to control delivery noise, even if both use the words Class A1.

Where the answer is unclear, apply for a Lawful Development Certificate under section 191 or 192 of the Town and Country Planning Act 1990. It is the only route that produces a binding answer, and it is far less expensive than defending an enforcement notice.

Section 73 to update a condition

Where a client needs the condition changed rather than interpreted, section 73 of the 1990 Act allows an application to vary or remove it. The authority considers only the condition in question, and a new permission is issued with the amended condition, running alongside the original.

Three points to get right. The application has to engage the policy reason for the original condition, so a frontage protection condition needs a frontage argument rather than a statement that Class E flexibility makes it redundant. The planning statement should set out what has changed since the condition was imposed, including any adopted plan policy. And the drafting you propose should use current class references with the old ones noted, so the next reader is not back in the same position.

The Levelling-up and Regeneration Act 2023 introduced a further route for varying permissions, with the arrangements for bringing it into force still to be verified, so check the current position before choosing between the available powers. A planning statement that sets out the condition history, the policy reason and the proposed replacement wording does most of the work on a section 73 application of this kind.

Advice for lease and sale enquiries

When a client asks whether a unit can be used for something, the answer never comes from the current Use Classes Order alone.

Work through the planning history in order. Identify the permission the current use relies on. List every condition on it and on any subsequent variation. Check for an Article 4 direction over the site. Check whether the lawful use is what the occupier says it is, because a use that began without permission more than ten years ago may be immune from enforcement and lawful in its own right, while one that began last year is not.

Then give the answer with its basis. A one line reply that the unit is in Class E is the kind of advice that leads to a client signing a lease for a use their permission prohibits. The nuances around Class MA and the vacancy requirement are a reminder that the Class E label on its own settles very little.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. Browse the 66 report types to see which documents a change of use application needs.

Frequently asked questions

Does a condition restricting use to Class A1 still bite?

Yes. Under the saving in the 2020 Regulations, a class reference in a permission granted before 1 September 2020 is read as that class had effect when the permission was granted. So a change from a shop to a café breaches an A1 condition even though both uses now sit within Class E.

Where did the former B1 uses go?

B1(a) offices became Class E(g)(i), B1(b) research and development became E(g)(ii) and B1(c) light industrial became E(g)(iii). B2 general industrial and B8 storage and distribution were unchanged by the 2020 amendments, so permissions referring to those classes read the same way as before.

Did every D1 use move into Class E?

No. The former D1 split. Clinics, health centres, creches and day nurseries moved into Class E, while schools, art galleries, museums, public libraries, places of worship and law courts moved into Class F1. The split means a single old permission for a D1 use can now point in two different directions.

How do I get a stale condition changed?

Apply under section 73 of the Town and Country Planning Act 1990 to vary or remove it. Engage the policy reason the condition was imposed for rather than arguing that Class E flexibility makes it redundant, and propose replacement wording using current class references with the old ones noted.

What settles a disputed interpretation?

A Lawful Development Certificate under section 191 for an existing use or section 192 for a proposed one. It is the only route to a binding answer. Interpretation otherwise follows the objective approach the Supreme Court set out in Trump International Golf Club Scotland v Scottish Ministers in 2015.

Sources and further reading

use classesconditionssection 73change of useplanning historyclass e

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use7 min read

Changing a condition that ties a unit to a revoked class

A condition restricting a unit to a revoked class still bites. Section 73 is the route to vary it, and the application has to answer the reason the condition was imposed for.

Read article →
Use Classes and Change of Use7 min read

Community centres and village halls in Class F2

Village halls usually sit in Class F2 as halls for the principal use of the local community. Changes within the class are not development, while moving out of it engages community facility policy.

Read article →
Use Classes and Change of Use7 min read

Drive-through restaurants: which use class applies

A drive-through food outlet is normally a sui generis use rather than a Class E restaurant, which removes the flexibility to change use later. The classification, and the evidence, both follow from how the food is consumed.

Read article →
Use Classes and Change of Use7 min read

Nightclubs and late night venues: consent and conditions

Nightclubs sit outside every use class. The application is won on sound insulation, on what happens at closing time, and on hours you offer rather than hours imposed.

Read article →
Use Classes and Change of Use7 min read

Hostel, hotel or HMO: three different use classes

Hotels sit in Class C1, which expressly excludes hostels. Shared houses sit in C4 up to six residents and become sui generis above that. The facts of occupation decide which you have.

Read article →
Use Classes and Change of Use7 min read

Cinemas, bingo halls and dance halls after the 2020 reform

The 2020 rewrite of the Use Classes Order split the old assembly and leisure class apart. Cinemas and bingo halls came out as sui generis, so every change needs permission.

Read article →