Costs award or a complaint after an appeal decision

7 min readBy PlanScope Editorial Team

Costs compensate wasted expense caused by unreasonable behaviour in an appeal. A complaint addresses process failures. Only a section 288 challenge touches a decision that is wrong in law.

A planning appeal costs award and a maladministration complaint do different jobs, and neither changes the decision. Costs compensate a party for expense wasted by the other side's unreasonable behaviour in the appeal. A complaint addresses how a body handled the process and can produce an apology, a change of practice and sometimes a modest payment. If the decision itself is wrong in law, the route is a statutory challenge in the High Court, and the clock on that is short.

When costs can be awarded

The power rests on the inquiry and hearing provisions applied to planning appeals, and the Planning Inspectorate publishes guidance on how it is exercised. The test has two limbs, and both have to be met.

First, a party must have behaved unreasonably. Second, that behaviour must have caused another party to incur expense that would otherwise have been avoided. An appeal that is dismissed does not of itself show unreasonable behaviour by the appellant, and an appeal that succeeds does not of itself show unreasonable behaviour by the authority.

Awards are therefore uncommon, and that is the point. The system is not a loser-pays regime, and treating it as one in your application is the quickest way to have it refused.

Unreasonable behaviour and the examples given

The guidance divides unreasonable behaviour into substantive and procedural, and the examples are specific enough to be useful.

On the substantive side, the recurring authority failures are a reason for refusal that cannot be substantiated by evidence, reliance on generalised assertions about harm with nothing behind them, failure to review the case once the appeal statement arrives, refusal contrary to an officer recommendation with no new evidence to support the committee's view, and a reason for refusal that ignores clear and relevant development plan policy or an earlier appeal decision on the same site.

On the appellant side, the recurring failures are pursuing an appeal with no reasonable prospect on the evidence available, withdrawing late after the other side has prepared, and failing to produce evidence that was promised.

Procedural unreasonableness catches both parties equally: missing timetable deadlines, introducing new material late, failing to attend, and causing an adjournment.

But a committee overturning an officer recommendation is not unreasonable in itself. Members are entitled to disagree with their officers. The unreasonableness lies in defending that decision at appeal without evidence to support it.

Applying for costs and the timing

Timing is where applications fail on procedure rather than on merit.

  1. For an inquiry or a hearing, make the application orally before the event closes, and hand in a written version. An application after closure will normally be too late.
  2. For written representations, make the application in writing before the decision is issued, which in practice means with your final comments.
  3. Set out the unreasonable behaviour, with dates and documents, as a numbered list of allegations.
  4. For each allegation, state the expense it caused and why that expense would otherwise have been avoided.
  5. Quantify the sum claimed, or ask for an award in principle with the amount to be agreed or assessed afterwards.
  6. Serve a copy on the other party so it can respond.

The decision on costs comes with the appeal decision or shortly after it. Where an award is made in principle and the parties cannot agree the amount, the sum can be referred for detailed assessment.

Whether a costs application is realistically available also depends on the appeal route you chose, and the differences between the routes are set out in householder appeal or full planning appeal: which route.

What a complaint can and cannot achieve

A complaint is about process, not outcome. Against a local planning authority, it goes first through the council's own complaints procedure and then to the Local Government and Social Care Ombudsman.

The Ombudsman can investigate maladministration causing injustice. Failure to consult a neighbour who was entitled to notice, losing representations, giving incorrect advice that was relied on, unreasonable delay, failing to follow its own published procedure. What it cannot do is reconsider the planning merits or substitute a different decision, and it will generally not investigate where an appeal or a court challenge was the proper route.

Complaints about the conduct of an appeal go to the Planning Inspectorate's own complaints procedure, and afterwards to the Parliamentary and Health Service Ombudsman, which requires referral through a Member of Parliament.

Outcomes are typically an apology, a recommendation to change a procedure, and occasionally a payment for the time and trouble caused or for a quantifiable loss. For a client who has been treated badly and wants it recorded, that is worth something. For a client who wants the permission, it is not the remedy.

Statutory challenge under section 288

Where the complaint is that the decision is legally flawed, the route is an application to the High Court under section 288 of the Town and Country Planning Act 1990.

The key features are tight. The application must be made within six weeks of the date the decision was issued, permission to proceed is required, and the grounds are errors of law rather than disagreement with the planning judgement. Failure to give adequate reasons, taking an irrelevant matter into account, ignoring a material consideration, misinterpreting a policy, or a procedural unfairness are the familiar categories.

The remedy is also limited. A successful challenge quashes the decision and sends the appeal back for redetermination, usually to a different inspector. It does not grant permission, and the redetermination can reach the same conclusion by a lawful route.

Six weeks is not long. If a decision looks legally wrong, get advice within days rather than weeks, because the time spent deciding whether to challenge is time taken out of the period for doing it.

Evidence to keep during the appeal

Most costs applications fail because nobody kept the material at the time. Build the file as you go.

  • Every piece of correspondence with the authority, with dates, including requests for information and the responses or silence.
  • The officer report, the committee minutes and any late representations that were put to members.
  • The authority's appeal statement, marked up against its reasons for refusal, showing which reasons were abandoned and when.
  • Your own fee records, broken down by task, so that wasted expense can be attributed to a specific allegation.
  • A note of any pre-application advice and whether the refusal departed from it.

The abandoned reason for refusal is the most common successful ground. An authority that drops a reason in its appeal statement has, in effect, accepted it could not substantiate it, and the expense of preparing to meet that reason is exactly what a costs award covers.

Choosing the right remedy

Match the remedy to the harm. Wasted money from the other side's conduct in the appeal points to a costs application, made at the right moment and framed as an evidenced list of allegations. A process failure that caused injustice but not a legal error points to a complaint. A decision that is wrong in law points to section 288, inside six weeks.

Sometimes the honest answer is none of them. An inspector who weighed the planning balance differently from you has not behaved unreasonably, maladministered anything or erred in law, and a client is better served by hearing that than by a costs application that fails and sours the relationship with the authority. The stronger response is often a fresh application addressing the reasoning in the decision, supported by a Planning Statement that engages with it directly. Which supporting documents the resubmission needs can be checked by entering the postcode on PlanScope, or by working through the index of report types.

This is general guidance, not legal advice, and a statutory challenge in particular needs advice from a qualified lawyer well inside the six-week period. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

When can costs be awarded in a planning appeal?

Only where a party has behaved unreasonably and that behaviour caused another party expense that would otherwise have been avoided. Both limbs must be met. Losing an appeal is not itself unreasonable behaviour, and winning one does not show the authority behaved unreasonably, which is why awards remain uncommon.

What counts as unreasonable behaviour by a council?

The recurring examples are a reason for refusal that cannot be substantiated by evidence, generalised assertions of harm with nothing behind them, failing to review the case once the appeal statement arrives, refusing contrary to an officer recommendation with no supporting evidence, and ignoring clear development plan policy or an earlier appeal decision on the same site.

When must a costs application be made?

For an inquiry or hearing, orally before the event closes, with a written version handed in. For written representations, in writing before the decision is issued, which in practice means with your final comments. Applications made after that point are normally refused on timing regardless of their merits.

Can an ombudsman overturn a planning decision?

No. The Local Government and Social Care Ombudsman investigates maladministration causing injustice, such as a failure to consult, lost representations, incorrect advice relied on or unreasonable delay. It cannot reconsider the planning merits or substitute a different decision, and it will usually decline where an appeal or court challenge was the proper route.

What does a section 288 challenge achieve?

It quashes a legally flawed appeal decision and sends the appeal back for redetermination, usually before a different inspector. It does not grant permission, and the redetermination can reach the same outcome lawfully. The application must be made within six weeks of the decision and permission to proceed is required.

Sources and further reading

appealscosts awardombudsmansection 288planning inspectorate

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Comparisons

View all →
Comparisons7 min read

Site notice, neighbour letter or press advertisement

Councils choose between a site notice, letters to neighbours and a newspaper advertisement according to the type of application. For some applications the law requires two of them.

Read article →
Comparisons7 min read

Parking survey or compliance with parking standards

Adopted standards tell the council what your scheme should provide. A parking survey tells it what the street can actually absorb. Converted flats usually need the second.

Read article →
Comparisons6 min read

Travel plan or delivery and servicing plan

People go in the travel plan, vehicles go in the servicing plan. The content, conditions and monitoring that separate the two documents.

Read article →
Comparisons6 min read

Building Regulations approval and planning permission

Two separate consents, two separate processes. What planning controls, what building control controls, and why one is no defence against the other.

Read article →
Comparisons6 min read

Noise assessment or extraction statement for a kitchen

Plant noise and cooking odour are assessed by different people against different standards. Which document answers which objection on a restaurant or takeaway application.

Read article →
Comparisons7 min read

Prior approval or full application: how they differ

On prior approval a council may only consider the matters the class lists. Here is what that means for timing, conditions, refusal and fallback value.

Read article →