Noise assessment or extraction statement for a kitchen
Plant noise and cooking odour are assessed by different people against different standards. Which document answers which objection on a restaurant or takeaway application.
A commercial kitchen in or near housing usually needs both documents, and they answer different objections. A noise assessment deals with the sound your plant makes: the extract fan, the condensers, the refrigeration units running at 11pm. A ventilation and extraction statement deals with what comes out of the flue: odour, grease, and where the discharge point sits relative to your neighbours' windows. Submitting one when the environmental health officer wanted the other is the most common reason a takeaway or restaurant application stalls at consultation.
If the application is for a hot food use within 10 m of a residential window, assume you need both and budget accordingly.
Which document answers which objection
Read the objection letters and the environmental health consultation response, and sort the complaints into two piles.
Complaints about a hum, a rattle, a whine at night, or vibration through a party wall are noise. Complaints about cooking smells in a bedroom, grease on a windowsill, or a flue terminating below the neighbour's bathroom window are extraction. The two piles are assessed by different people against different standards, and an answer in the wrong document does not count.
| Question raised | Document that answers it | Standard applied |
|---|---|---|
| Plant noise at a nearby dwelling | Noise Impact Assessment | BS 4142:2014+A1:2019 |
| Internal noise levels in affected rooms | Noise Impact Assessment | BS 8233:2014 |
| Cooking odour reaching habitable rooms | Ventilation and Extraction Statement | Defra guidance on commercial kitchen exhaust |
| Flue height and discharge direction | Ventilation and Extraction Statement | Defra guidance and local plan amenity policy |
| Grease build-up and fire risk | Ventilation and Extraction Statement | Maintenance regime, secured by condition |
| Deliveries and refuse collection noise | Noise Impact Assessment, with a management plan | Local plan policy and condition wording |
Plant noise against odour and grease
A Noise Impact Assessment under BS 4142 compares the rating level of your plant at the nearest noise-sensitive receptor against the measured background sound level there. The rating level is the specific sound level of the plant plus a correction for acoustic features such as tonality, impulsivity or intermittency, which is where fan whine and compressor cycling get penalised.
The standard treats a rating level around 10 dB above background as an indication of a significant adverse impact and around 5 dB above as an indication of an adverse impact, with the context of the area taken into account rather than applied as a pass mark. Many councils ask for the rating level to sit at or below background, and some ask for 5 dB below at night. Check the wording in the adopted local plan before you design the attenuation.
The Ventilation and Extraction Statement is a different exercise entirely. It describes the cooking type, the extract volume, the filtration train, the duct route, the termination point and the maintenance regime. Deep frying and charcoal grilling sit at the top of the odour risk scale. A sandwich bar with a combination oven sits near the bottom.
The flue termination question
Most refused food applications fail on the flue. Internal ductwork through a residential upper floor is often impossible, the external route is visually contentious, and the termination height is the point everyone argues about.
Defra guidance on controlling odour and noise from commercial kitchen exhaust systems recommends terminating the discharge at high level, vertically upwards, at least 1 m above the ridge or eaves and clear of openings and air intakes on surrounding buildings. In a terrace with flats above, that means a duct the full height of the building, fixed to the rear elevation, which is a design and heritage problem as well as a technical one.
Low-level discharge with high-grade filtration is sometimes accepted where a high flue cannot be built. It needs an odour risk assessment, a filtration specification that matches the cooking type, and a maintenance condition with service intervals and records. Expect scepticism, because the system only works while it is maintained.
Resolve the route before you draw the elevations. A flue added to a consented design after the event almost always needs a further application.
Standards each report follows
Noise work leans on BS 4142 for plant, BS 8233 for internal levels, and the Planning Practice Guidance on noise for the policy framework of observed adverse effect levels. Measurements need a representative background period, which for a late-night use means measuring late at night rather than at 3pm on a Tuesday.
Extraction work leans on the Defra exhaust guidance, the odour chapter of Planning Practice Guidance where the use is large enough to raise an air quality question, and Building Regulations Approved Document F for ventilation rates. An Odour Assessment becomes a separate document where the risk is high or where a specific complaint history exists.
One honest uncertainty: councils apply the Defra guidance with very different degrees of rigour. Two authorities, with the same cooking type and the same neighbour distance, will not always ask for the same filtration.
Hours and management conditions
Both documents feed conditions, and the conditions are what you live with for the life of the business.
- A plant noise limit expressed as a rating level at a named receptor, measured to BS 4142
- Hours during which the extract system and plant may operate, often tighter than the opening hours
- A filter maintenance and cleaning schedule, with records kept and available on request
- A delivery and refuse collection window, usually excluding early morning
- A restriction on propping open rear doors, which is how odour escapes a perfectly good extract system
Negotiate the numbers at application stage. A noise limit set 5 dB tighter than needed, agreed quickly to get a permission, is a permanent operating constraint.
Submitting both for a food use
For a change of use to a restaurant or hot food takeaway near housing, a workable pack covers the use class position, the plant, the extraction, and the servicing in one set of documents that agree with each other.
- A Planning Statement setting out the use class change and the policy tests, including any hot food takeaway policy near schools
- A Noise Impact Assessment with background measurements at the relevant time of day and the proposed plant schedule
- A Ventilation and Extraction Statement with the duct route drawn on the elevations, not described in words
- Elevations showing the flue, the louvre, the condenser position and the screening
- A short management plan covering deliveries, refuse, cleaning and opening hours
The commonest internal contradiction is a condenser shown on a flat roof in the noise assessment and on the rear wall on the drawings. Officers notice.
Who should prepare each
Noise assessment work needs an acoustician, and councils generally expect membership of the Institute of Acoustics for anything contested. Extraction work needs a ventilation engineer or a specialist kitchen extract designer who can specify the filtration train and the fan duty, and who will sign the maintenance schedule.
PlanScope drafts both documents from your project data, structured to UK planning policy, and it flags wherever a site measurement is missing rather than inventing a figure. The background sound measurement and the fan duty calculation still have to come from the relevant professional, and councils usually expect a suitably qualified author for both report types, so professional review is strongly advised. You can send a draft to a reviewer through the professional directory.
Enter your postcode on PlanScope to see which reports a food use at your address is likely to need.
This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
Do I need both a noise assessment and an extraction statement?
For a hot food use close to housing, usually yes. They answer separate objections: plant sound at a neighbouring dwelling, and odour and grease from the flue. Environmental health officers consult on both, and an answer placed in the wrong document tends to come back as a request for further information.
How high does a commercial kitchen flue have to terminate?
Defra guidance on commercial kitchen exhaust systems recommends discharging vertically at high level, at least 1 m above the ridge or eaves and clear of openings and air intakes on surrounding buildings. Lower termination can sometimes be accepted with high-grade filtration, an odour risk assessment and an enforceable maintenance condition.
What does BS 4142 actually measure?
It compares the rating level of your plant at a noise-sensitive receptor with the measured background sound level there. The rating level is the plant sound level plus a correction for features such as tonality or intermittency. A rating level around 10 dB above background indicates a significant adverse impact, assessed in context.
Can I avoid a tall external flue?
Sometimes, with a filtration train matched to the cooking type and a low-level discharge, supported by an odour risk assessment. Expect the council to be cautious, because performance depends on maintenance. Deep frying and charcoal grilling are the hardest cases, and a sandwich or baking use is much easier to resolve at low level.
When do planning conditions limit my opening hours?
Where plant or extraction cannot meet the required levels through the night, the council will often restrict the hours the system may operate, which in practice restricts trading. Those limits are negotiated at application stage, so argue the numbers before permission is granted rather than applying to vary them later.
Who can prepare these documents?
Noise work needs an acoustician, and councils generally expect Institute of Acoustics membership for contested cases. Extraction work needs a ventilation engineer or specialist extract designer who can state the fan duty, specify the filtration and stand behind the maintenance schedule that becomes a planning condition.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.