Developer return assumptions by tenure in an appraisal

7 min readBy PlanScope Editorial Team

National guidance works from 15 to 20 per cent of gross development value and accepts a lower return on affordable housing. How to split, evidence and sensitivity test the figure.

A developer profit assumption viability argument is won or lost on two numbers: the percentage, and what it is a percentage of. National planning practice guidance works from a return of 15 to 20 per cent of gross development value for plan making, and accepts that a lower figure may suit affordable housing because the end sale is agreed in advance and the risk is smaller. Those two sentences cover most of the ground. The disputes come from how the figure is applied, split and evidenced.

Authorities now employ reviewers who do this for a living. An appraisal that applies one blended return across every tenure invites the obvious question, and the obvious question is usually the expensive one.

Why return is assessed by tenure

Market housing carries sales risk. The developer builds, then finds a buyer at a price nobody can be certain of two years out, and carries the cost of holding unsold stock.

Affordable housing, delivered to a registered provider under a pre-agreed contract, carries almost none of that. The price is fixed, the buyer is identified, and the payment schedule is known at the point the contract is signed. Guidance recognises that reduced risk and expects the return on that element to reflect it.

Commercial floorspace sits somewhere else again, with letting risk, incentive packages and a yield that moves with the investment market rather than with house prices. Treating it as though it behaved like flats for sale produces a number that nobody with an investment background will accept.

So the starting discipline is simple. Split the appraisal by tenure, apply a return to each, and say in one paragraph why each figure differs from the others.

Profit on cost and profit on value

The two conventions are not interchangeable, and the gap between them widens as margins rise.

Convention Calculation Typical use
Profit on gross development value Profit divided by GDV Market sale housing, the basis national guidance uses
Profit on cost Profit divided by total development cost Affordable housing, commercial, contractor-led work
Profit on cost excluding land Profit divided by build and fee costs only Build to rent and forward-funded schemes

A 17.5 per cent return on gross development value on a scheme where land is a third of the cost base is a materially different number from 17.5 per cent on cost. State which basis each figure uses, in the cell or the row heading, and give the arithmetic so a reviewer can convert between them without rebuilding the model.

The commonest error in submitted appraisals is a single table where some rows are on cost and others on value with nothing to say which is which.

The ranges national guidance works from

For plan making, the guidance range is 15 to 20 per cent of gross development value, and it is framed as what may be considered suitable rather than as a cap or a floor. Two qualifications matter.

It is written for plan making, where the point is to test whether a policy is deliverable across a notional site. On a decision-taking appraisal for one real scheme, the guidance expects the return to be justified by the circumstances of that scheme, which can take it outside the range in either direction.

And it applies to the market element. The lower figure for affordable housing is left to be evidenced rather than prescribed, which is why practice converges on a conventional range rather than a stated number. If you adopt a figure, say where it comes from: comparable schemes in the authority, the registered provider's own terms, or the funding structure of this particular deal.

Where you depart from the guidance range on the market element, the justification has to be specific to the site. Ground conditions, a phased delivery over six years, a single-staircase redesign, an abnormal remediation liability. Generic references to market uncertainty get struck out by reviewers, and rightly.

Risk, scale and phasing

Scale cuts both ways. A 400 unit scheme spreads fixed costs and gives the developer the option to slow delivery, which reduces risk. It also extends the exposure period and increases the sum at stake, which increases it.

The honest position is that scale changes the shape of the risk rather than its size, and the appraisal should show where that lands. A long phased scheme carries more interest cost and more exposure to a market cycle, and the usual way to reflect that is through the finance assumption and the phasing of receipts rather than by inflating the profit percentage. Reviewers watch for risk being counted twice, once in a contingency, once in a finance rate and once again in the return.

Pick the line where each risk sits and keep it there. A 5 per cent contingency on build cost plus a 20 per cent return plus a nine month sales void on every unit is three charges for the same uncertainty, and an independent reviewer will say so. Our note on the independent review of a viability appraisal sets out how that exercise usually proceeds.

Build to rent and investment value

Build to rent breaks the appraisal in a useful way. There is no sales programme, so there is no sales risk to price, and the exit is an investment value derived from net operating income and a yield rather than from unit sales.

Three consequences follow. Return is normally expressed on cost rather than on value, because gross development value in the sale sense does not exist. The yield assumption does more work than the profit assumption, and a 25 basis point movement in it will shift viability further than any plausible argument about profit. And the operating cost deduction, typically a percentage of gross rent covering management, voids and bad debt, becomes a line an authority will test hard.

The London Plan has a dedicated build to rent policy with its own affordable housing route, so in London the tenure split interacts with the threshold approach rather than sitting alongside it. Outside London, plans vary from a full policy to silence.

Sensitivity testing that a reviewer accepts

Guidance expects sensitivity analysis, and a single-point appraisal reads as advocacy. The useful version tests four variables and shows the effect on the residual land value rather than only on the profit line:

  1. Sales values or rents, at plus and minus 5 and 10 per cent
  2. Build cost, at plus 5 and 10 per cent
  3. The return itself, at the ends of the adopted range
  4. Programme, with a six and twelve month delay to receipts

Present it as a table of residual land value outcomes with the benchmark land value drawn across it. That single layout answers the question the authority is actually asking, which is at what point the scheme can afford more affordable housing. Our note on viability appraisal outputs covers what else belongs in the submission pack.

Where an authority will push back

Five objections come up again and again, and four of them are avoidable.

Profit applied to the land cost, so the developer earns a return on the purchase price as well as on the development. Profit on affordable housing at the market rate. Risk double counted across contingency, finance and return. A blended figure with no tenure split. And the one that is not avoidable: a benchmark land value that reflects the price actually paid rather than existing use value plus a premium, which is a different argument from the return argument but gets bundled with it.

Deal with those four in the appraisal itself, in a short assumptions schedule that states each percentage, its basis, its source and the tenure it applies to. A reviewer who can tick that schedule off in ten minutes spends the remaining time on the land value, which is where the real negotiation lives. The treatment of meanwhile uses and benchmark land value is a related trap on sites with interim income.

Where the outcome is a reduced affordable offer, the Affordable Housing Statement has to carry the explanation in plain terms, because that is the document members read. The Viability Assessment carries the arithmetic.

Viability evidence submitted to an authority is generally published, so write it knowing that objectors and a reviewer will both read it line by line.

This is general guidance, not legal or valuation advice. Viability appraisals for planning should be prepared and reviewed by a suitably qualified valuer, and professional input is required for specialist technical reports. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What developer return does national guidance support?

Planning practice guidance on viability works from 15 to 20 per cent of gross development value for plan making, framed as what may be suitable rather than as a fixed rule. It also accepts a lower figure for affordable housing, where a pre-agreed sale to a registered provider removes most of the sales risk.

Should profit be taken on cost or on value?

Both conventions are used, and they give different answers. Market sale housing is normally assessed on gross development value, which is the basis national guidance uses. Affordable housing, commercial floorspace and build to rent are more often assessed on cost. Label every percentage with its basis so a reviewer can convert between them.

Why is the return on affordable housing lower?

Because the risk is lower. The units are sold to a registered provider under a contract agreed before construction, at a known price and on a known payment schedule, so there is no sales void and no exposure to a falling market. Guidance expects the return assumption to reflect that reduced risk.

How is build to rent treated differently?

There is no sales programme, so the exit is an investment value derived from net operating income and a yield rather than from unit sales. Return is normally expressed on cost. The yield and the operating cost deduction move viability far more than the profit percentage, so expect both to be tested.

What do independent reviewers object to most?

Profit taken on the land cost as well as the development, a market rate return applied to affordable housing, risk counted three times across contingency, finance and profit, and a single blended figure with no tenure split. An assumptions schedule stating each percentage, its basis and its source removes most of these.

Sources and further reading

viabilityaffordable housingsection 106build to rentappraisaldevelopment economics

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Viability, Obligations and Commercial

View all →
Viability, Obligations and Commercial7 min read

Nomination agreements and why providers reject drafts

A stalled nomination agreement becomes a planning problem when occupation is tied to it. What providers need in the drafting, and when to involve them.

Read article →
Viability, Obligations and Commercial7 min read

Phasing triggers in a section 106 and what they key to

On a phased site the triggers in a section 106 matter more than the totals. How each type behaves, and the definitions that make them work when the programme slips.

Read article →
Viability, Obligations and Commercial7 min read

Overage and clawback in a planning obligation

Section 106 overage shares scheme upside with the authority, usually as affordable housing. This covers early, mid and late stage triggers, defining the uplift, why a cap matters to funders, and the drafting traps that surface years later.

Read article →
Viability, Obligations and Commercial6 min read

The retail sequential test: available, suitable and viable

A sequential test asks three questions of every alternative site. This covers catchment definition, evidencing availability with dated agent enquiries, the flexibility national policy expects, and the 300 metre edge of centre definition.

Read article →
Viability, Obligations and Commercial6 min read

Levy stop notices and what they prevent

A levy stop notice halts the whole site, not just part of it, and breaching one is a criminal offence. Here is the warning notice sequence, how an instalment default creates an overdue balance, and the contractual damage that follows.

Read article →
Viability, Obligations and Commercial6 min read

Appealing a levy surcharge to the Planning Inspectorate

Surcharge appeals under regulation 117 go to the Planning Inspectorate within 28 days, while chargeable amount disputes go to the Valuation Office Agency. The grounds are narrow and factual.

Read article →